HomeMy WebLinkAboutexhibitE4bATTACHMENT E-4B
WATERWAYS ASSISTANCE PROGRAM
NAVIGATION RELATED DISTRICTS
APPLICATION EVALUATION AND RATING FORM
INLET MANAGEMENT and PUBLIC NAVIGATION PROJECTS
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS AN INLET
MANAGEMENT or PUBLIC NAVIGATION PROJECT.
CATEGORY RATING
& RATING POINTS
POINTS
AVAILABLE
EVALUATION CRITERIA
WATERWAY
RELATIONSHIP
(For reviewer only)
(1-2..5 points)
(1-2. 5 points)
Describe how the project directly benefits the maintenance of ithe
Atlantic Intracoastal Waterway. Briefly discuss any methods or
activities that will address long-term sedimentation problems.
(12) Does the project directly benefit the AICW?
(13) Will the project inhibit sediment inflow into, or reduce
the dredging frequency of the Atlantic Intracoastal
Waterway?
PUBLIC ACCESS Describe how this project will enhance public navigation and safety
benefits along the waterway.
(For reviewer only)
(1-2.5 points) (14) Will the project enhance public benefits on the
waterways?
PROJECT DESIGN Explain how this project relates to the overall management goals of the
inlet or waterway. Briefly spell out any water quality, environmental or
•
habitat benefits to be realized by this project.
(For reviewer only)
(1-2.5 points) (15) Has the applicant demonstrated additional benefits to
be realized by implementing this project ?
PROJECT FUNDING
List the additional funding sources for this project. What is the status of
these funding sources? Explain the funding mechanism for the long-term
maintenance of the project.
(For reviewer only)
(1-2 points) (16) Has the applicant received other assistance funding and is
long-term maintenance incorporated?
RATING POINT
TOTAL
(Note: The total maximum score possible is 50 points and the minimum score possible is 16 points. A score of 35 points or more is
required to be considered for funding.)
Form No. 93-25b
(Effective Date:3-21-01)