Resolution: R-05-0180
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
File Number: 05-00194 Final Action Date: 3/24/2005
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH
ATTACHMENT(S), AUTHORIZING AN INCREASE IN THE CONTRACT AWARDED
TO AUGUST CONSTRUCTION COMPANY, INC., PREVIOUSLY APPROVED
PURSUANT TO RESOLUTION NO. 04-0257, ADOPTED APRIL 22, 2004, FOR THE
PROJECT ENTITLED "RIVERVIEW STORMWATER PUMP STATION UPGRADES
(3RD BIDDING, ROOF) B-50650," FORMERLY B-5650A, FOR ADDITIONAL
PROFESSIONAL SERVICES FOR PROJECT MODIFICATIONS REQUIRED FOR
COMPLIANCE WITH NEW BUILDING CODES, INCREASING THE CONTRACT IN
AN AMOUNT NOT TO EXCEED $50,000, FROM $105,326 TO $155,326;
ALLOCATING FUNDS FOR SAID INCREASE FROM CAPITAL IMPROVEMENTS
PROJECT NO. 352216 ENTITLED "CITYWIDE LOCAL DRAINAGE PROJECTS
FISCAL YEARS 2002-2006;" AMENDING RESOLUTION NO. 04-0257 TO REFLECT
SAID INCREASE REQUIRED FOR SAID PROJECT; AUTHORIZING THE CITY
MANAGER TO EXECUTE AMENDMENT NO. 1, IN SUBSTANTIALLY THE
ATTACHED FORM, FOR SAID PURPOSE.
WHEREAS, pursuant to Resolution No. 04-0257, adopted April 22, 2004, the City Commission
accepted the bid of August Construction Company, Inc. ("Contractor") for the project entitled
"Riverview Stormwater Pump Station Upgrades (3rd Bidding, Roof), B-50650" ("Project"), formerly
B-5650A, in an amount not to exceed $105,326 from Capital Improvements Project ("CIP") No.
352216; and
WHEREAS, the City of Miami's ("City's") Department of Planning and Zoning has advised that the
building codes under which the Project was originally designed have changed and the Project has to
be redesigned to be in compliance with the new building codes; and
WHEREAS, additional work involves the relocation of a generator and electrical connections; and
WHEREAS, the Administration has determined that the most logical method to continue with this
Project, is to modify the current contract utilizing a change order for the additional work and
increasing the total amount of the contract, as provided in Sections 18-73 of the Code of the City of
Miami, Florida, as amended; and
WHEREAS, the City Manager requests authorization to execute Amendment No. 1, in
substantially the attached form, to the Contract with the Contractor, to provide for the redesign of the
Project, subject to City Commission approval; and
WHEREAS, funds for the Project are available under CIP No. 352216 entitled "Citywide Local
Drainage Projects Fiscal Years 2002-2006," in the amount of $50,000;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
City of Miami
Page 1 of 3 File Id: 05-00194 (Version: 1) Printed On: 11/1/2016
File Number: 05-00194 Enactment Number: R-05-0180
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by
reference and incorporated as if fully set forth in this Section.
Section 2. An increase in the contract awarded to August Construction Company, Inc., previously
approved pursuant to Resolution No. 04-0257, adopted April 22, 2004, for the Project, in an amount
not to exceed $50,000, increasing the compensation amount from $105,326 to $155,326, for
additional professional services required for compliance with the new building codes, is authorized.
Section 3. Section 1 of Resolution No. 04-0257 is amended in the following particulars: {1}
"Resolution No. 04-0257
Section 1. The bid of August Construction Company, Inc., for the project
entitled "Riverview Storm Water Pump Station Upgrades (3rd Bidding, Roof),
B 5650A B-50650," is accepted, in the proposed amount not to exceed
$105,326 $155,326, with funds allocated from Capital Improvement Project
No. 352216, in the amount not to exceed $105,326 $155,326, for contract
costs, plus $17,508 for estimated expenses incurred by the City of Miami, for
total project costs not to exceed $122,83/1 $172,834, as set forth on the
Tabulation of Bids document and the Project Fact Sheet, attached and
incorporated.
*II
Section 4. Funds, in an amount not to exceed $50,000, for said increase, will be allocated from
CIP No. 352216, entitled "Citywide Local Drainage Projects Fiscal Years 2002-2006."
Section 5. The City Manager is authorized{2} to execute Amendment No. 1, in substantially the
attached form, for said purpose.
Section 6. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.{3}
City of Miami Page 2 of 3 File Id: 05-00194 (Version: 1) Printed On: 11/1/2016
File Number: 05-00194 Enactment Number: R-05-0180
Footnotes:
{1} Words/and or figures stricken through shall be deleted. Underscored words and/or figures shall be
added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted
and unchanged material.
{2} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter
and Code provisions.
{3} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar
days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission.