HomeMy WebLinkAboutexhibit1AExhibit A
Scope of Work — Orange Bowl Storm Sewer Pump Station
Relocation of the existing 500 gallon above ground fuel oil tank to a location
which will not impede construction progress
Removal of the existing fence west of the proposed fuel tank and the location of
approximately 40 Lf of 6' chain link fence (match existing fence) to be installed
five feet (5') east of the proposed fuel tank.
, ,,