Loading...
HomeMy WebLinkAboutSupplementary proposalr EXHIBIT "A" SUPPLEMENTAL ENGINEERING PROPOSAL NO. 1 N.E. 71st Street Storm Sewers Project, B-50690 ._ZTRIC ENGINE .SING, INC:. CONSULTING ENGINEERS - PLANNERS - SURVEYORS 13940 S.W. 136 STREET SUITE 200 MIAMI, FLORIDA 33186 PHONE: (305) 235-5098 FAX: (305) 251-5894 APPROVED By 4.(14.4. Date =r°1^ May 12, 2004 Jose Lago, P.E. Department of Capital Improvements 444 S.W. 2nd Ave. 8T" Floor Miami, Florida 33130 File: 1.1553(04) Transmitted via Express Mail Project: N.E. 71s1 Drainage Improvement Project Miami, Florida Subject: Supplemental Agreement Request Dear Mr. Lago: Metric Engineering, Inc., respectfully requests compensation for the additional work for the NE 71 st Street Drainage Project. The additional work consist of: Task No. 1: Additional Work to Modify Existing Seawall - 1. Additional survey along the seawall and bay bottom, which is required for the seawall modifications (such as location of existing piles, pipes, and anchors). 2. Additional structural design work for the changes to the seawall, which is also required since the as -built plans for the existing seawall were not available. Task No. 2: Auger Hole Design on NE 701h Street - 1. Percolation testing at NE 701h Street. 2. Design of seven auger hole drainage systems at NE 70 St . Task No. 3: Milling & Resurfacing -- 1. Extending the current project limits and revising the current plans to address the milling and/or resurfacing for NE 69, 70, 71, and 72 Streets. (Please note that this additional work extends beyond the present project limits, since currently only NE 72 St drainage area extends from Biscayne Blvd to Biscayne Bay, with survey performed only where the drainage structures are to be located.) Limits of milling and resurfacing to be represented in the plans by means of a line diagram, as no survey will be performed. N.ICONTRACTTL155311.1553,041Sopplemental\ose Lago.doc 2. Details for the milling and/or resurfacing pavement design, ab ,veil as quantities for the swale improvement, curb and gutter replacement, sidewalk replacement, and ADA compliance, (which the City is providing) and their accompanying details, (which Metric will provide), will be drafted into the plans. 3. Pavement marking replacement for the milled and/or resurfaced roads will be handled with the following note: "Contractor to restore pavement markings to their original condition. 4. The technical specifications for all the above work (with the exception of the sidewalk specifications which is already shown in the specifications package) will also be prepared. Task No. 4: FDOT Permit & MOT Coordination — 1. Preparation of an FDOT permit for work occurring in or near their right of way is also required. [This includes milling and resurfacing of NE 69, 70, 71, and 72 Streets as the work will begin at Biscayne Blvd (SR 5); and for the temporary opening of the existing road closures at NE 70, 71, and 72 Streets to accommodate maintenance of traffic during construction.] Task No. 5: Inventory — 1. Preparation of an inventory of the existing drainage inlets and/or grates, in which damaged items will be tabulated and shown in the plans as to be replaced. Task No. 6: Coordination — 1. Includes coordination with City for the above -mentioned issues. Your consideration of this matter will be greatly appreciated. The engineering, geotechnical and survey fees for the above work total not to exceed of $20,250. A breakdown of the hours and fees are enclosed. The timeline for this supplemental work shah follow the original contract timeline in which work will be completed by August 30, 2004. Should you have any questions or require additional information, please do not hesitate to call me. Sincerely, METRIC,ENGINEERING,;jN 4,4 Manuel A. Sauled Chief Highway Enclosure gineer Cc: Victor Benitez, P.E. J. B. Gonzalez, P.E. N:ICONTAACT11.155311.1553.041SupplementalVose Lago.doc NE 71 St Storm Sewers Project City's Project Number B-50690 FEE ESTIMATE FOR ADDITIONAL WORK REQUESTED BY THE CITY 5/8/2004 by: MAS TASK No. Description Est. Manhours — Comments 1 Additions! work 10 modify ex. seawall to fit (3) outfall pipe systems: _ 1 a Structural Design & Construction Inspections 80 1 b Additional ACOE permit 8 2 Design (7) Auger Holes on NE 70 St 24 Directive by Francis Mitchell during Project Definition MTG on 3/4/04 to design (7) Auger Holes in lieu of (2) drainage wells as per original scope. 3 Prep. Design plans for Milling & Resurfacing 4 Includes details, specification and incorporating quantities for ADA ramps, for NE 69, 70, 71, 72 St swk, and curb & gutter replace. in addition to milling & resurfacing quant 4 FDOT permit, MOT, coordination w/FDOT 16 To minimize Temporary Construction Easements and/or License for temp. removing street blockages Agreements and due to impacts at Biscayne Blvd (M&R) 5 Prepare inventory of all ex, drainage inlets/grates 8 Directive by Francis Mitchell during Project Definition MTG on 3/4/04 That are damaged and replace under this project. 6 Project Development Meetings btw City & Metric 24 Manhours to coordinate additional work with the City. Total Hrs. 164 Metric Estimated Fee: $14,115 7 SURVEY services for Items: 1 & 3 $5,000 Survey work to be performed by Manuel G. Vera and Associates, Inc. 8 Additional Geotechnical for Items'. 2 51.135 Geotechnical work to be performed by HR Engineering Services, Inc. TOTAL COST EST. $20,250 Breakdown of work effort by Metric Engineering, Inc. based on the estimated hours worked by individuals in the following categories to accomplish the tasks included in the Additional Scope of Services: c�-lgq"'e" 6z ��fGOs�r► ' ��+ f , t i oura Rte k .mz9i•.q yi'C+` ' '- 1 s"r ?. QX `� Principal Engineer 3 $135.00 $ 405.00 . Project Manager 20 $120.00 $ 2,400.00 Professional Engineer 25 $100.00 $ 2,500.00 s Engineer 74 $85.00 $ 6,290.00 CADD Technician 42 $60.00 $ 2,520.00 Sub -Total $ 14,115.00 3. Estimated Reimbursable Expenses $0.00 q, �r� l ^M a � ��r 'i �`'"Lp a r,s;.a,,.<,4�,-d':',:`..s�,.:""..� a,. i'.:��.-:rInc.) .� i■�r'.��., ,.s T..>�]y"d�` y + s� ,v� A t s �r °c N:1CONTRAC'111.155311.1553.O4.Supplementallose Lago.doc NE 70th STREET, FROM NE 69 COURT TO BISCAYNE BOULEVARD CITY OF MIAMI - BAYWOOD HR ENGINEERING SERVICES, INC. Proposal No. HR04-198P 6-Apr-04 GEOTECHNICAL EFFORT A. FIELD TESTING / SAMPLING Perform the following field testing: A total of 2 constant head percolation tests, each to a depth of 15 feet. Engineering: Provide hydraulic conductivity results and signed and sealed reports. 1. Drill Rig Mobilization each 1 $250.00 $250.00 2. Percolation tests each 2 $250.00 $500.00 GEOTECHNICAL FIELD TESTING SUBTOTAL $750.00 B. GEOTECHNICAL FIELD SERVICES AND REPORTING Boring layout, utility clearance coordination, and report preparation. 1. Registered Geotechnical Engineer man-hour 1 $75.00 $75.00 2. Project Geotechnical Engineer man-hour 2 $65.00 $130.00 3. Senior Technician (boring layout and utility clearance) man-hour 4 $45.00 $180.00 GEOTECHNICAL ENGINEERING SUBTOTAL $385.00 TOTAL ITEMS A-B $1,135.00