Loading...
HomeMy WebLinkAboutproposal BPROPOSAL NE 71st STREET STORM SEWERS PROJECT, 13-5690 C.I.P. Project No: 352216 "Exhibit B" Fee Schedule per Task/Phase included in the Scope of Services Phase Total Amount TASK 1: SURVEY ( M.G. Vera & Associates, Inc. ) $ 10,500.00 TASK 2: GEOTECHNICAL TESTING (H.R. Engineering,) $ 3,910.00 PHASE I: PRELIMINARY DESIGN Not Applicable PHASE H: DESIGN DEVELOPMENT $16,045.00 PHASE III: CONSTRUCTION DOCUMENTS & PERMITTING $30,665.00 SUBTOTAL: (Fixed Fee Basis) $61,120.00 PHASE V: CONSTRUCTION PHASE (Hourly Rates Fee Basis) $13,780.00 TOTAL AMOUNT $ 74,900.00 Estimated Reimbursable Expenses: a. Purchase of Water and Sewer As -Built from MDWASD. (Estimated number of sheets: 20 sheets @ $5.00 per sheet) $100.00 GRAND TOTAL AMOUNT $ 75,000.00 2 Metric Engineering, Inc. 13940 S.W. 136th Strom, Suite 200 Miami, Florida 33186 (305)236-5098 PHASE 05: CONSTRUCTION SERVICES ENGINEERING ESTIMATE CITY OF MIAMI DEPARTMENT OF CAPITAL IMPROVEMENTS N.E. 71st STREET STORM SEWERS C.I.P Project No.: 352216 ACTIVITY Principal Engineer Project Manager Professional Engineer Engineer CADD Technician Clerical Hours Cost For Activity $135.00 $120.00 $100.00 $85.00 $60,00 540.00 preconstructlon meeting 4 4 $480.00 respond to rfis 2 4 20 8 0 34 $2,820.00 shop drawings 4 32 36 $3,200.00 periodic observations and observation reporter) 2 68 0 70 $6,020.00 substantial completion site visit & report 1 6 0 7 $630.00 final site visit a report 1 6 0 7 $630.00 TOTAL MANHOURS 0 14 4 132 8 0 158 1 3,7,80 TOTAL SALARY COSTS $0.00 $1,680.00 $400.00 $11,220.00 $48(3.00 $0.00 ; ;' : ; ;; '; ;' f; r)Comments: TOTAL CONTRACT FEE COMPt1TATICN (Check Appropriate Box) (X) Estimate (3127103) Total Activity Salary Costs subconsultannt Services TOTAL(Fixed Fee Services) GRAND TOTAL(houi iy rate Fee) I 1 $ 13,780.00 $0.00 Periodic Observations: 17 weeks @ max 4 his per week = 68 hours 1 $13,780.00 $-1:3 7$0:6 1 1 Revised by: JMM 1 1 I 1 Prepared By: Julio M. Menache Date: 03/27103