Loading...
HomeMy WebLinkAboutexhibit2A• • • PROPOSAL CITY OF MIAMI N.E. 71st STREET Drainage Improvements EXHIBIT "A" SCOPE APPROVED By Date___ Metric Engineering, Inc. proposes to provide the services identified below for the project entitled "N.E. 71st Street Drainage Improvements", pursuant to its Professional Service Agreement with the City of Miami for General Engineering Services, dated May 13, 2002 I. GENERAL These additional services are a result of FDEP requirements for the deep well drainage permits and replacement of Auger Holes with Rock Trenches. II. SCOPE OF WORK A. Task 1 — Hydrogeological Study Metric will retain the services of URS to produce the preliminary report, all the required testing and final reports for the drainage well permits. See attached URS scope of services. B. Task 2 — Drainage Modifications Metric will modify the drainage report and plans to accommodate the use of Rock Trenches in lieu of the Auger Hole. III. SUBCONSULTANTS The below listed Sub -Consultants will assist in the performance of the Work. Specialty or Expertise SubConsultant Name URS Hydrogeological Services IV. SCHEDULE OF WORK — TIME OF PERFORMANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below SCHEDULE OF DELIVERABLES ID Number 1 2 Drawing Name or Deliverable Hydrogeological Study (Preliminary Report, Field work and final Report) Drainage Modifications Total Hours 100 Hr 74 Hr SCHEDULE OF WORK Activity ID # 1 2 Task Name and/or Activity Description Hydrogeological Study (Preliminary Report, Field work and final Report) Drainage Modifications Duration 10 Week 3 Week Protected Start Date 3-7-05 3-1-05 * The above schedule assumes a Written Notice to Proceed will be issued by City on March 1, 2005. Projected Finish Date* 8-30-05 3-25-05 • • V. COMPENSATION Consultant shall perform the Work detailed in this Proposal for a lump sum, not to exceed fee of $ 40,895.03. SUMMARY OF COMPENSATION ^__ Task or Activity ID # Major Task Name and/or Activity Description Fee Amount Fee Basis 1 Hydrological Study (FDEP Permit) Metric $ 2,720.00 Lump Sum, Not to Exceed ^__ URS $ 6,445.03 Lump Sum, Not to Exceed __ 2 Drainage Modifications $ 6,730.00 Lump Sum, Not to Exceed ____ Subtotal $ 15,895.03 ______ 3 Allowance for Additional Services $ 25, 000.00 Lump Sum, Not to Exceed ^__ 4 Allowance for Reimbursable Expenses Direct Expenses ___ Grand Total : $ 40,895.03 See Attachment for Fee breakdown. VI. ADDITIONAL SERVICES Allowance for Additional Services not specifically described under Scope of Work will be performed by Metric upon approval by the City This additional services may include permitting coordination and fees, post design services, and/or unforeseen conditions related to the project. This work will be billed at a negotiated fee and method of payment. VII. PROJECT MANAGER CONSULTANT'S Project Manager for this Work Order assignment will be Manuel A. Sauleda, P.E. Submitted by: Prepared by: Date Date III Name of ESTIMATE OF WORK EFFORT AND COST - PRIME CONS Description: Consultant Name: Metric Engineering Inc. Contract No.: 1.1553.04 Date: 2/15/2005 Estimator: Atlredo Reyna • STAFF CLASSIFICATION Job Classification Stilt Applicable Rate Principal Eng. Rate: $140.00 Protect Manager rn Rate: S120.00 Protedonal Eng. Rate: $100.00 Enguineer Rate: 585.00 Cadd Tech Rate: 560,00 Clerical Rate: $A0.00 Rate: $0.00 Rate: $0.00 Staff Hours By Activity Salary Cost By Activity Average Rate Per Task Work Activity Man hours Cosy Advty Man hours CCBt1 Actvty Man hours Cosy Advlyr Man hours Cost/ Advly Man • hours Co / Advly Man hours Cost/ AcNty Man hours Cost/ Actvty Man hours Cosh Advty Drainage modification (removal Agoer hoes Permit Coordination Total Staff Hours 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $O $O SO SO $0 $0 SD SD $0 SO SO $0 SO $0 SO $0 so SO $0 50 SO SD SD SO $0 SO $0 4 16 0 0 0 0 0 0 0 0 0 0 O 0 0 0 ❑ 0 0 0 0 0 0 0 0 0 0 $480 $1 920 SO $0 SO $o SO SO $0 SO $O $O SO So SO $D $O 50 $0 $0 SO SO 50 $0 $D SO SO 20 8 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 a 0 0 0 0 0 0 0 S2,000 5600 SO SO S0 $0 $0 $0 S❑ SD SO $O So $0 $D SO S❑ SD SO 50 $0 $0 SO $0 SO $0 SD 50 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 0 0SO 0 0 0 0 0 0 0 0 0 $4,250 $D SO SD $0 SD $0 $0 $O SO $0 So to $0 50 SO SO SO 50 So $O $0 SD SO SO SD 0 0 0 O 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 SO SO SO So $0 SD So SO $0 SO 50 50 SD SO SD $0 $0 50 SO 50 SD SO SO 50 SO So SD 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $a 5o SO SO $0 $0 $0 SD $0 $0 SO $0 5o $0 $0 $0 SO SD 50 SO $0 $4 50 5D $0 SO 0 0 D 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 D SO SO SG SO $0 SO SO SO SO $O So SO SO S0 $0 SO SO SD SO $0 SO SO $0 SD $0 . SO SD 0 4 0 0 0 0 0 0 0 0 0 0 O 0 O D 0 0 0 0 0 0 0 0 0 0 0 SO $0 SO $0 SO 50 $o 50 $0 SO SO $0 So SO $O $0 $0 $0 $0 SD SO $0 EO $0 SO $0 $0 74 28 0 0 0 0 O D 0 0 0 0 0 0 0 o 0 0 0 0 0 0 D 0 0 0 D $6,730 $2,720 50 SO SD SO SO $0 SO So S0 SO SO SO $D SO $0 SO 50 SO SO SO SO SO SO So So S90.95 $97.14 #DIV/01 #Dh//01 #DIV/0! aDN/01 ttDIV/01 IIDIVl01 #DtV10! #D1VFE aDIV/d. #DIVJD1 #DIW01 #DIV101 #DN1D! *Drool #DIW0 #DIV/0! #DIV/01 #DIV/01 aDIV101 #DIV10! #0IVfd #DfV/oi #DIVl01 SDIVro1 SDIVld 0 20 26 50 0 0 0 4 102 Total Stair Cost $0.00 $2.400.00 S2,800.00 S4,250,00 50.00 $0.00 50.00 - S0.o0 $9,450.00 $92.65 Total %of Work by Classlficatlon fa . esb.da,&rr 0.0% 19.6% 27.5% Survey Field Days for Subconsultant 3 - Person Crew 4 - Person Crew 0 D Survey (3 man crew) 0.00 Survey (4 man crew) 0.00 3-man crew days 4-man crew days Notes: 1. This sheet is to be used by Prime Consultant to calculate the Grand Total Fee. 2. Manually enter fee from each subconsultant. Unused subconsultant TOWS may be hidden 3, The bass for work activity descriptions shall be the FICE/FDOT Standard Scope and Staff Hour Estimation Handbook. 49.0% $ - / day 50.00 $ - / day $0.00 0.0% NEGOTIATED FEE ADJUSTED FEE (E'ICLUDING 2.9 h9 JLTIPLIER) SUBTOTAL ESTIMATED FEE: Subconsultant Subcnnsultant: Subconsultant Subconsultant Subconsultant: Subconsultant URS Sub 2 Sub 3 Sut 4 Sub 5 Sub 6 0 nece= Check = S9 450.00 $9 450,00 59,450.00 $9,450.00 $6,445.03 S0, 00 $0.00 $000 $0.00 50.00 SUBTOTAL ESTIMATED FEE: S15,895.03 Qeotechnlcal Field and Lab Testing $0.00 Survey Fee SD OD SUBTOTAL ESTIMATED FEE: $15.895.03 Additional Services (Allowance) $25 UW.00 Relmbursables (Allowance) S0.00 GRAND TOTAL ESTIMATED FEE: S40,ess.03 DEP Perrnm_ds WO Proposal Fee Calcufatton SAMPLE WORKSHEET 2/15/2005 4:51 P51