Loading...
HomeMy WebLinkAboutexhibit8ATTACHMENT E-4A WATERWAYS ASSISTANCE PROGRAM APPLICATION EVALUATION AND RATING FORM DEVELOPMENT & CONSTRUCTION PROJECTS THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS A DEVELOPMENT OR CONSTRUCTION PROJECT BUT IS NOT AN INLET MANAGEMENT OF BEACH RENOURISHMENT PROJECT. CATEGORY RATING & RATING POINTS POINTS AVAILABLE EVALUATION CRITERIA PERMITTING (For reviewer only) (1-2 points) (1-2 points) List all of the necessary permits that are required for the project, the date of application, and the anticipated date of receipt of the required permits. If permits are NOT required, explain why not. The following environmental permits are required: Agency Date applied for Issued FDEP 1/05 TBD ACOE 1/05 TBD DERM 1/05 TBD (12) Have all permits been applied for? Is timing time sufficient to meet application deadline? (If the project is a Phase I project a minimum score of 2 points will be awarded) (13) Has the project received all of the required permits? (If the project is a Phase I project a minimum score of 2 points will be awarded) PROJECT DESIGN (For reviewer only) (1-2 points) List the status of the design of this project. Describe any unique design aspects of this project that enhance public usage or access, decrease environmental impacts, improve water quality or reduce costs. The final design has been completed and the construction document will be completed within three months after the execution of the grant contract. The proposed improvements includes water quality improvements through the stabilization of the unconsolidated shorelines utilizing red mangroves, removal of exotic vegetation, restoration of native upland vegetation, creation of an interpretive nature trail and picnic sites, and the installation of an education/tour boat docking facility. (14) Has the design work been completed? (A Phase I project should be evaluated based upon the design work completed to date). Are there unique beneficial aspects to the proposed design? CONSTRUCTION TECHNIQUES Briefly explain the construction techniques to be utilized for this project. Miami -Dade County (DERM) has agreed to assist with the proposed enhancement project. DERM has been involved in restoring and enhancing Miami -Dade County for over 25 years, and has developed cost-effective, environmentally sound, habitat restoration and enhancement techniques. A shallow draft barge will deliver a]1 equipment and materials to the islands. Turbidity control measures will be installed prior to the initiation of the boat docking facility and will remain in place for the duration of construction. School groups will be involved in the planting and success monitoring of the completed project. (For reviewer only) (1-3 points) (15) Are the construction techniques appropriate for the project site? CONSTRUCTION MATERIALS List the materials to be utilized for this project. What is the design life of the proposed materials? Describe any recyclable material to be utilized. The shoreline stabilization will be accomplished utilizing native red mangroves. The exotic vegetation will be selectively cleared, followed by the planting of salt/drought tolerant native vegetation. The docking facilities will be constructed of long lasting materials. (1-3 points) (16) Are the construction materials of lasting quality? Are recyclables utilized? RATING POINT TOTAL (Note: The total maximum score possible is 50 points and the minimum score possible is 16 points. A. score of 35 points or more is required to be considered for funding.) Form No. 91-25A (Effective Date: 3-21-01)