Loading...
HomeMy WebLinkAboutaward sheetAward Sheet Orange Bawl Stadium Field Sod Replacement (BID NO.03-04.168) IIm DESCRIPTION d er'a pricing shall include mobilization q( equipment and labor for each Item below, 1 Sod and soil removal to 5" depth X 97,600 square feet Havenand 8leckrock Corp. 9819 St, Rd. 7 Boylan Beach, FL 33437 El Non -Local/ Non -Minority EXTENDED UNIT OF MEASURE SQUARE FOOT PRICE PRICE Square Foot 2 Field shall be roughly graded X 97,600 square feet Square Foot Soil Fumigation — Rotovate, Fumigate with methyl Application 3 bromide at 500 Ibs per acre X 2.24 Acres Pp 4 Laser leveling of the athletic field X 97,600 square feet g Square Foot Pre -plant fertilizer 3-7-7 applied at manufacture's, recommendations. Please state manufacturer and what 5 rate below: A. Manufacturer Name B. Lba, Per Square Foot X 97,600 5O. FT. Lbs. Square Foot A. Install certified sand grown Tifway 419 Bermuda sod 6 installed in big rolls (42" Wide X 75 FT long). Price per Square Foot $ X 95,100 Sq Ft. B. Install 2500 SQ FT. of Seadwarf Paspalum sod in southeast and southwest corners. Price per Square Foot $ X 2,500 Sq Ft 7 Sod shall be top dressed 2 times. Price per application AGGREGATE TOTAL COST (ITEMS 1— 7) OPTIONS: (MAY BE REQUIRED AND AWARDED BY THE CITY IN THE AGGREGATE WHEN TOTALLING ALL ITEMS OR SEPARATELY TO THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER, WHICHEVER 15 IN THE BEST INTEREST OF THE CITY OF MIAMI) In December 2005, remove 30,000 SQ FT of damaged 419 Bermuda grass sod and replace with original a specifications. Price per Square Foot $ X 30,000 Square Foot 9 Provision for Special Items 10 Grand Total Would you be able to hold your bid price for option item 11 fixed and firm until December 31, 2005? Prepared By: Terry Byrnes, CPPB 12/21/04 Square Foot $ Square Foot Per Application Square Foot TBD YES/NO 0.004 0,08 $ 7,808 00 0,033 $ 3,220.80 $ 13,000,00 0.05 $ 4,880.00 Harrells 0.0088 $ 390.40 0.27 $ 25,877.00 0.85 $ 1,825.00 700.00 $ 1,400.00 $ 58,001.20 0.55 $ 18,500,00 3 74,501,20 YES