Loading...
HomeMy WebLinkAboutSite Utility Study• November 2004 3050 Biscayne MAJOR USE SPECIAL PERMIT SI'i'E UTILITY STUDY PREPARED FOR AI-Boymelgreen, Inc. KHA Project No.: 042421000 Prepared by: KIMLEY HOIZNAND ASSOCIATES, INC. 1691 Michigan Ave. Suite 400 EiMIIAMI BEACH, FL 33139 ❑ rl Kimley-Horn and Associates, Inc. • November 2004 3050 Biscayne MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY PREPARED FOR AI-Boymelgreen, Inc. KHA Project No.: 042421000 Prepared by: KIMLEY-HORNAND ASSOCIATES, INC. 1691 Michigan Ave. Suite 400 MIAMI BEACH, FL 33139 Site Utility Study Introduction 3050 Biscayne is a proposed mixed -use development to be located in the City of Miami, Miami -Dade County, Florida (see Attachment "A" Site Location Map). Currently, a commercial building exists (will remain) on the east portion of the site with an asphalt parking lot occupying the balance of the site. The 3050 Biscayne project includes a 45 story residential tower, ground floor retail & restaurant, a parking garage structure, and a residential liner of studios and townhomes. See Table 1, below for further details of the proposed project. Table 1: Project Summary Retail 9,188 Residential 288 367,736 Restaurant 1 2,907 Total 379,831 • I. Drainage Existing Drainage Based on site observations and available information, there is an existing drainage system which currently serves the existing building and asphalt parking lot. Said drainage system will be removed and a new stormwater management system will be constructed to retain the runoff generated by the proposed improvements, as required by code (see below). Proposed Drainage System The drainage system for the proposed development will consist of drainage wells and exfiltration trench, if possible, to facilitate on -site disposal of stoifit water runoff The 5- year design storm event will be used to design the storm water management system, in accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Based on preliminary calculations, it is anticipated that six (6) 24" drainage wells will provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff generated by the proposed development. Preliminary drainage computations for the project areas are provided in. Attachment "B" Preliminary Drainage Well Calculations, which includes the basis for design. The final drainage design for the project should be in conformance with the requirements of the Miami -Dade County DERM Water Control Section, Florida Department of Environmental Protection, and other local, state and federal regulatory agencies having jurisdiction over the project. II. Water Distribution System The water mains owned and operated by the Miami -Dade Water and Sewer Department (MDWASD) in the vicinity of the project are shown in the Table 3. 3050 Biscayne Site Utility Study Page 3 • • Table 3: Existing Water Mains (Per MDWASD Water Atlas Sheet) "o 18" Utility Easement Middle of subject property Biscayne Blvd. NE 32'd Ave & NE 30th St. 16" D.1. NE 32'`' St. Biscayne Blvd. & exist parking lot 6" NE 2'`' Ave NE 32"`' Ave & NE 30th St. 36" & 8" According to the survey by Schwebke-Shiskin & Assoc, dated 7/13/04 there is a 54.T wide utility easement which bisects the subject property. The proposed improvements appear to be in conflict with said easement and consequently the existing utilities within the easement. An agreement with M-Dade County Water and Sewer Department (MDWASD) and coordination will be required to abandon/remove the existing water and sewer lines within the easement. Furthermore, MDWASD may require the existing 18" watermain within the utility easement to be relocated along NE 32nd St. A final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner. Water service meters will be installed by MDWASD forces at owner's expense. Service lines for domestic water, fire sprinkler systems and irrigation could be connected to the on -site water distribution system. Water service meters would need to be purchased and installed by MDWASD forces. See Attachment "C" for a copy of the MDWASD water atlas sheet for the project area. 3050 Biscayne Site Utility Study Page 4 • III. Sanitary Sewer Collection System Table 4 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD), within the vicinity of the project. Table 4: Existing Sanitary Sewer Mains (Per MDWASD Sewer Atlas Sheet) Biscayne Blvd. NE 32nd St. and NE 30h St. 8" Gravity Main and 60" Force Main Utility Easement Middle of subject property 8" Gravity Main NE2"dAve NE 32nd St. and NE 30th St. 8" Gravity Main Similar to the watermain an agreement with M-Dade County Water and Sewer Department (MDWASD) and coordination will be required to remove the existing sewer lines within the easement. A final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner. The proposed on -site sanitary sewer system for the property can be connected to the either of the existing mains abutting the property; provided that the line has capacity to handle the existing flows plus the additional flows contributed by the proposed project. A letter of availability and further coordination with MDWASD is recommended to verify the proposed sanitary sewer service connection points and requirements for this project. MDWASD may require upgrades to the sanitary sewer system, but this can not be determined without a request for a water and sewer agreement. A copy of the MDWASD Sewer Atlas sheet has been attached (See Attachment C). 3050 Biscayne Site Utility Study Page 5 • The flows from the existing MDWASD sanitary sewage mains on Biscayne Blvd. and NE 28th Street are received by MDWASD Regional Pump Station #2. As of November 2004, this pump station is operating under capacity as established by the USEPA, and is not under any type of moratorium (see Attachment "D" Pump Station Monthly Information). At this time, it is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed project. However, a final determination regarding the status of the existing transmission system and the need for possible improvements will not be made until construction plans are submitted to the Miami -Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 5. Retail Restaurant Table 5: Water & Sewer Flow Generation 9,188 sf 5 gpdyer 100sf 140 seats 50 gpd per seat Total Anticipated Flow 57,600 460 7000 65,060 gpd IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 6. 3050 Biscayne Site Utility Study Page 6 • • • Apartment Table 6: Solid Waste Generation 288 units Sibs/unit/day 0.72 Retail 9,188 sf 6lbs/1000 sf/day 0.027 Restaurant 140 seats 1 lbs/seatlday 0.070 Total Anticipated Solid Waste Generated 0.817 V. FPL Utility Easement According to the survey by Schwebke-Shiskin & Assoc, dated 7/13/04 there is a 12' wide FPL Easement within the 54.7' wide Utility Easement. If the proposed improvements are in conflict with said easement and consequently the existing FPL facilities (overhead lines, poles etc.) the easement will have to be removed by plat. In addition, the FPL facilities will have to be relocated to accommodate the improvements which may require another easement. 3050 Biscayne Site Utility Study Page 7 • Attachment A Site Location Map 3050 Biscayne Site Utility Study Page 8 NE 39TH ST 36 NE 38k-H ST OM PROPOSED PROJECT U U) NF 29TH ST NE 28TH ST NE 38TH n NJ.. 7TIA �T ST NE 37TH ST 36 - S_ NE 35TH TE NE 35TH ST NE 3 4T H ST Q NE �111 NE 32ND ST NE 30T -i TE NE 30TH ST NE 29TH TE NE 29TH ST NE 28TH ST 1 NE 27TH TE ::- Klmlcy-Hom and Associates, Inc. 420 Lincoln Rood Suite 353 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673--4882 3050 BISCAYNE SITE LOCATION MAP • • • 3050 Biscayne Site Utility Study Attachment B Preliminary Drainage Well Calculations Page 9 • 3050 BISCAYNE City of Miami, Florida 1. Site Data: A. Average October Water Table Elevation =NGVD B. County Flood Criteria Elevation = t 1 "NGVD (County Flood Criteria Map, see Appendix A) C. F.I.R.M. or FEMA Base Flood Elevation = Zone Xa �__ = sendix A) D. Average Crown Road Elevation = a x NGVD E. Average Existing Onsite Grade Elevation = NGVD F. Proposed drainage inlet grate elevation = t t NGVD 2. Total Contributing Drainage Area (A): A. Impervious Areas: a) Asphalt and concrete pavement = t g i Acres b) Roof areas + 1/3 NE building corner = Acres 5.83 Acres Total Impervious Area (Al) = B. Pervious areas: a) Green Areas = 3. Weighted Runoff Coefficient (C): Runoff Coefficient Impervious (C1) = Runoff Coefficient Pervious (C2) C=[(AI xC1)+(A2xC2)]/A; 5.49 Acres (94%) C= 0.87 Acres (6%) C x A Total Contributing Area; C x A= 5.04 Acres 4. Time required to generate one inch of runoff (per DERM Water Control Section D-4) Rainfall Intensity (I) = 308.5 / [(48.6 x F"° 11) + t (0.5895 + F-2/3)] Frequency (F) —. years - Frequency Curve Q = CIA, V = Qt; V(1 in.) = Qt(1 in.), t � — Time to generate 1 inch of runoff V(1 in) = CIAt(1 in.) I" x A = CIAt(i in ) ; Solving for t(1 in.), t(1in) = 1" I (IC) Time to Generate one inch of run-off t(in) = 11.58 Min. Time to reach the inlet (tc.) Total Time required to generate 1 in of runoff: = 21.58 Min. DRAINAGE WELLS BASIN • • • 5. Cumulative Runoff (Inflow Mass Diagram) o . mom 8 480 5.043 6.405 32.30 15,504 10 600 5.043 6.166 31.10 18,658 15 900 5.043 5.641 28.45 25,604 21.58 1295 5.043 5.073 25.58 33,122 30 1800 5.043 4.493 22.66 40,787 40 2400 5.043 3.956 19.95 47,885 50 3000 5.043 3.534 17.82 53,469 60 3600 5.043 3.193 16.10 57,976 90 5400 5.043 2.477 12.49 67,452 120 7200 5.043 2.023 10.20 73,455 180 10800 5.043 1.480 7.47 80,631 6. Drainage Well Design Discharge Rate: Based on well discharge rate of: DW-1 DW-2 DW-3 DW-4 DW-5 DW-6 11.00 11.00 11.00 11.00 11.00 11.00 2.00 2.00 2.20 2.00 2.20 2.00 2.20 2.00 2.00 2.20 2.20 GPM/ft. Head 6.80 9.09 6.80 1 9.09 6.80 l 9.09 6.80 6.80 9.09 9.09 571.2 571.2 571.2 571.2 571.2 Well Discharge Rate (CFS)1 54.55 7. Detention Time: Total Storage (CF)I 3427.20 The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge. Qd = Design Runoff Rate (CFS) Vd = Detention Volume (CF) = Qd x 90 sec. = Vd1 Detention Volume Per Well (CF) = W = Width of Well Structure (ft.) = L = Length of Well Structure (ft.) _ 25.58 CFS 2302.35 CF 1151.17 CF 7.0 ft, 12.0 ft. H,o;,, is the minimum depth required from the top of well casing to the floor of the well box to achieve 90 second detention time: H,,,,,(ft.)=Vd,1(WxL)= 13.80 ft_ Top of Well Casing Elev. = 9.00 Elevation at Floor of Well Box (NGVD) W Top of Well Casing Elev. - H�,;,,_ = -4.80 • 8. Excess storm water runoff excluding well structure storage: 8 10 15 21.58 30 40 50 60 90 120 180 480 600 900 1,294.77 1800 2400 3000 3600 5400 7200 10800 54.55 54.55 54.55 54.55 54.55 54.55 54.55 54.55 54.55 54.55 54.55 26,182 32,727 49,091 70,624 98,182 130,909 163,636 196,364 294,545 392,727 589,091 15,504 18,658 25,604 33,122 40,787 47,885 53,469 57,976 67,452 73,455 80,631 -10,678 -14,069 -23,487 -37,501 -57,395 -83,024 -110,167 -138,387 -227,093 -319,272 -508,460 9. Excess storm water runoff including well structure storage: 8 480 15,504 3,427 26,182 -14,105.14 10 600 18,658 3,427 32,727 -17,496.29 15 900 25,604 3,427 49,091 -26,914.41 2158 1,294.77 33,122 3,427 70,624 -40,928.68 30 1800 40,787 3,427 98,182 -60,822.50 40 2400 47,885 3,427 130,909 -86,450.84 50 3000 53,469 3,427 163,636 -113,594.28 60 3600 57,976 3,427 196,364 -141,814.55 90 5400 67,452 3,427 294,545 -230,520.28 120 7200 73,455 3,427 392,727 -322,699.03 180 10800 80,631 3,427 589,091 -511,886.71 Safety Factor 2.13% Safety Factor 2.38% Kimley-Horn and Associates, Inc, :ter tea. 420 Lincoln Road Suite 353 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 3050 BISCAYNE FLOOD CRITERIA MAP Kimley-Horn and Associates, 51 111r, 1691 Michigan Ave Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 TES: I. CONTOUR INTERVAL 1.0 •f T. (Except as indicated) 2. DATUM IS MEAN SEA LEVEL 3050 BISCAYNE AVERAGE OCTOBER GROUND WATER LEVEL 1960-75 • Attachment C Existing Utility Records 321 310 127 e‘iv„ /4145 iht2r_..., bl ) 0 , .4_0, 35 aT* /rt I " 287 ` 366 • " Iasi) 11•52 289 (5202 t 3 • I 4 11 ha, ave "ta 4r ,70 111 276 _17042 t. twit! -4▪ 1.;•z4, \no/ z 276 / 271'. rar4 2771 " 2; NE 24 ST 2•„ 84 24:4125,411 (2017 1.„2 1 / 24 " . ' (2. / 1 11--; (IVY! 17"r?" P-7, • ! S4 rj„ 1P1''117,2. I 7 1 93) 5 1 a 8-471410 . .. 9! .. 7441 i \ 1..../ si-4'., tosi ., • ._.. .,...,. . . 1 10 0 HE ,u ST 10 • /. _.6.1_1/ ..-070 — 1 7/1...., 224 ' 31. ...(2• ,0••• / 8 ' < 10* ..57 fjL i 020 < • \ I231 / 217J: 7E1 , 1,6 76 RI 'N..— ,•• ,1171t/E O F- 232„....., . .- t4'2,62%\) PiE 20 ST 218 214 ..•-• ; 213 1.77 9 '. ., , • • , >7 24 116 V 84 182 i5601" a a` 161A '2034 I 184 (2036 (1547 Pee 0 NE 33 1ffJ. • 1 • .111--0 12 '4 2.114 220 toz ."' 201 1 1 la 2 a 257 : 11"1 14441 10* < j a io- too ' )to sn I /- )2077 t 212 avr4\ j • 21* - 211 \\,?!..i,.•"'" \ DS ?Vg,;.t.,,P...,,, ,\ 1586 ) APP. I 21520 1 i E.J.;.,. 1, /1,...,,;;: 1 ..,) 371 1 . ,--, ......_.4 \11!' ;__ -`7,0 , < • • 174i /72 17T . ) (631')Iibm. 16 ' 1 t ,n, ) 14 7_1 2112 NE 22 S. 194 I 188 148 +1a5 /2— N ro 12I ,7 iW ''C3•k,�� PP,'v91?�Ii"S .J.(.. lb/{Or. ,7 iW ''C3•k,�� PP,'v91?�Ii"S .J.(.. lb/{Or. Attachment D Pump Station Monthly Information Pump Station Monthly Information Station..30 -0002 Atlas Pg..E13 MIAMI DADE WATER & SEWER DEPARTMENT Addr..925 BISCAYNE BLVD Sec -Township -Range 31-53-42 Genr._ ET clock.Y Telm.Y #Pumps. 5 T ump ype.A Stn Class.M Speed.R Hrspwr.+ Res 4111!Plans.. Plats.. Extens. flow(gpd) 1,729,943 0 0 Proj Napot 4.35 hrs 3.15 hrs 3.15 hrs % Cap 43.50 31.50 31.50 Date Mo.NAPOT Avg 09/24/2004 08/25/2004 07/27/2004 06/25/2004 05/26/2004 04/27/2004 03/29/2004 GOLD/M GOLD/D GOLD/G Daily Flows 3.14 12.56 3.38 13.50 <Plan Review> Moratorium..OR Moratorium effective since / / Yearly NAPOT (hrs) 3.15 Stn Gross Capacity(gpd).. 57,600,000 Station Reduction Factor 0.60 Stn Net Cap Certif(gpd).. 0 Stn Net Capacity(gpd).... 34,560,000 Indicated Flows(gpd) 4,536,000 Rgd # Fig Pmp 0.00 Y 5 0.00 Y 5 2.82 11.28 0.00 Y 2.79 11.16 0.00 Y 2.85 11.40 0.00 Y 3.17 12.67 0.00 Y 3.28 13.10 0.00 Y 5 Comments Signature..LEALG Sign Date. Station I<m>provement GOLD/S <S>tation Informs. <D>ownstream Station Codes & Cata<g>ories .03/17/2003 13:52:24.01 GOLD/U <U>pstream Station GOLDIP <P>ump Information GOLD/T Sewer Cer<t>ification