HomeMy WebLinkAboutproject analysis formPROJECT ANALYSIS FORM
City Of Miami
Date Prepared; 01.21.05
B1irWNl ar
Revised Date:
Revised Date:
PROJECT NAME: ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (THIRD AMENDMENT)
ADDRESS 1 LOCATION: 1501 NW 3rd Street
PROJECT Nu.:
8-30297
NET OFFICE: East Little Havana
DISTRICT:
03
CLIENT DEPT: Public Facilities
EST. PROJECT COST:
$4,081,567
CLIENT CONTACT: Ileana Gomez
TEL,: 305-643.7100
ALLOCATED FUNDS:
$4,057,364
PROJECT MANAGER: Juan 8 Ordonez
TEL.; 305-416-1241
PROCUREMENT:
Informal Bid
CONSTR. MANAGER:
TEL.:
PROJECT TEAM:
Facilities
INSPECTOR! CEO: Bliss & Nyitray
TEL,: 305-442-7086
EST. DESIGN START: 01.10.05
EST. DESIGN END: 02.18.05
EST. BID ADV.: Increase
EST. AWARD DATE: 02.24.05
EST. CONSTRUCTION START: 03.02.05
EST. CONSTRUCTION END: 08,28.05
PROJECT COST ESTIMATE
PRODUCTION PHASE
A. Design Svcs. - Outside Consultant
1 Basic Fees:
Prime Consonant:
Percentage
$0
2 Additional Services:
$o
B. Design Svcs. - CIP
1 In-house Basic Design Fee:
2 In-house Addttional Design Services:
C Production Management Services
1 Prod. Mgmt. of Outside Consultant by CIP:
2 Prod. Mgmt. of Outside Consultant by Industry Partner:
D Miscellaneous Services
1 Survey: Vendor:
SUB -TOTAL: SO
0.0% $0
0.0% $0
SUB -TOTAL: $0
3,13% $78,120
0.0% $0
SUB -TOTAL: S78,120
2 Re -plat:
Vendor:
3 Geotechnlcal Testing:
4 Utility Locations (Soft Digs):
Vendor:
Vendor:
5 Asbestos Survey; Vendor:
6 Energy / HVAC Calculations: Vendor:
7 Phase I Environmental: Vendor:
8 Phase II Environmental: Vendor:
9 Structural Testing: Vendor:
10 Archeological Survey;
11 Other:
Vendor
Vender:
SUB -TOTAL: SO
E Special Fees I Assessments:
1 PERM {Plane review, environmental permits, etc.): Fee Waiver i-
2 Miami -Dade County Water and Sewer Department (Plan review)
3 Florida Department of Environmental Protection (Permits):
4 FOOT (Plans review, inspections, etc.):
5 South Florida Water Management District (Permits).
6 U 5, Army Corps of Engineers (Plans review, permits)
7 HAS (Plans review, w spec -Dons, etc_)•
8 Other
ate-TOTsi
P'ROCUCIIICei PHASE TO ::.
CXNNISTRUCTIOIN PHASE
- ri'° '1 Esar mire'.
2 Contingency AAvvance:
3 Date 8 TeiecommunKabon Sysr4ms
4 Fixtures, Furniture and Equipment:
5 WASA System Betterment:
6 FPL Contribution -In -Aid -of Construction:
7 Other. Owner Discretionary Funds (13-30152)
$762,749
SUB -TOTAL: S3,717,005
ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (THIRD AMENDMENT)
B-30297
PROJECT COST ESTIMATE
a Car anrtattrerGsetAg rePsMeAtFees
1 City of Miami Permits: Bldg, Dept. r Public Works f
2 Miami -Dade County Impact Fees:
3 Miami -Dade County Archeological Monitoring:
4 Other:
SUB -TOTAL:
CONSTRUCTION PHASE TOTAL:
$0
$3,717,005
CONSTRUCTION ADMINISTRATION
H Construction Inspection Services - CIP: 7.0%
$182,281
I Construction Mgmt. - Industry Partner' 0,0%
$0
J Construction Engineering Observer (CEO) - industry Partner 0.0%
$0
K JOC Administration 00%
$0
CONSTRUCTION ADMINISTRATION TOTAL:
$182,281
ADMINISTRATIVE EXPENSES
L CIP Dept. (Mgmt./Budget/Procurement/Comm.). 3.0%
$78,120
M Industry Partner Program Mgmt. Support: 1.0%
$28,040
ADMINISTRATIVE EXPENSES TOTAL:
$104,181
LAND ACQUISITION EXPENSES
N Land Cost:
0 Transaction Costs: 0.0%
$0
LAND ACQUISITION TOTAL:
$0
GRAND TOTAL - ESTIMATED PROJECT COST:
$4,081,567
PROJECT SCOPE
Removal and replacement of approximately 9,400 SF of concrete deck at the 36-0" Elevation North and South
concourse of the Stadium, including structural framing and security fencing. Removal and replacement of
approximately 6,000 SF of the metal stand of the lower bowl of the stadium. Repair of 32 raker beams at the lower bowl
of the stadium,
W
0
0
ti
Fund: Hameian.a D'e+erse Funo
---
Cleat:
Sr ProAct Loansger
Reviewed by:
Accepted by:
Pilar Saenz
CIP Budget Administrator
Jorge C Cano
Director of the Client Department
Fiscal Year
.1.eaaDy
CIP s 3 OC2
CO2 /
CP_a
�.*
Cti"tr.. _,.... _.. aenoeeMr,
Sign
61naeorr: $-t 364
Looser
Apeem
elt
q
Cate: /
Date: / / f 0 r
f41 DEPARTMENT, ALL C1FSECTION CHt5Fs, C1P SENIOR ACCOUNTANT.. HDR PROGRAM ssANAGER