Loading...
HomeMy WebLinkAboutproject analysis formPROJECT ANALYSIS FORM City Of Miami Date Prepared; 01.21.05 B1irWNl ar Revised Date: Revised Date: PROJECT NAME: ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (THIRD AMENDMENT) ADDRESS 1 LOCATION: 1501 NW 3rd Street PROJECT Nu.: 8-30297 NET OFFICE: East Little Havana DISTRICT: 03 CLIENT DEPT: Public Facilities EST. PROJECT COST: $4,081,567 CLIENT CONTACT: Ileana Gomez TEL,: 305-643.7100 ALLOCATED FUNDS: $4,057,364 PROJECT MANAGER: Juan 8 Ordonez TEL.; 305-416-1241 PROCUREMENT: Informal Bid CONSTR. MANAGER: TEL.: PROJECT TEAM: Facilities INSPECTOR! CEO: Bliss & Nyitray TEL,: 305-442-7086 EST. DESIGN START: 01.10.05 EST. DESIGN END: 02.18.05 EST. BID ADV.: Increase EST. AWARD DATE: 02.24.05 EST. CONSTRUCTION START: 03.02.05 EST. CONSTRUCTION END: 08,28.05 PROJECT COST ESTIMATE PRODUCTION PHASE A. Design Svcs. - Outside Consultant 1 Basic Fees: Prime Consonant: Percentage $0 2 Additional Services: $o B. Design Svcs. - CIP 1 In-house Basic Design Fee: 2 In-house Addttional Design Services: C Production Management Services 1 Prod. Mgmt. of Outside Consultant by CIP: 2 Prod. Mgmt. of Outside Consultant by Industry Partner: D Miscellaneous Services 1 Survey: Vendor: SUB -TOTAL: SO 0.0% $0 0.0% $0 SUB -TOTAL: $0 3,13% $78,120 0.0% $0 SUB -TOTAL: S78,120 2 Re -plat: Vendor: 3 Geotechnlcal Testing: 4 Utility Locations (Soft Digs): Vendor: Vendor: 5 Asbestos Survey; Vendor: 6 Energy / HVAC Calculations: Vendor: 7 Phase I Environmental: Vendor: 8 Phase II Environmental: Vendor: 9 Structural Testing: Vendor: 10 Archeological Survey; 11 Other: Vendor Vender: SUB -TOTAL: SO E Special Fees I Assessments: 1 PERM {Plane review, environmental permits, etc.): Fee Waiver i- 2 Miami -Dade County Water and Sewer Department (Plan review) 3 Florida Department of Environmental Protection (Permits): 4 FOOT (Plans review, inspections, etc.): 5 South Florida Water Management District (Permits). 6 U 5, Army Corps of Engineers (Plans review, permits) 7 HAS (Plans review, w spec -Dons, etc_)• 8 Other ate-TOTsi P'ROCUCIIICei PHASE TO ::. CXNNISTRUCTIOIN PHASE - ri'° '1 Esar mire'. 2 Contingency AAvvance: 3 Date 8 TeiecommunKabon Sysr4ms 4 Fixtures, Furniture and Equipment: 5 WASA System Betterment: 6 FPL Contribution -In -Aid -of Construction: 7 Other. Owner Discretionary Funds (13-30152) $762,749 SUB -TOTAL: S3,717,005 ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (THIRD AMENDMENT) B-30297 PROJECT COST ESTIMATE a Car anrtattrerGsetAg rePsMeAtFees 1 City of Miami Permits: Bldg, Dept. r Public Works f 2 Miami -Dade County Impact Fees: 3 Miami -Dade County Archeological Monitoring: 4 Other: SUB -TOTAL: CONSTRUCTION PHASE TOTAL: $0 $3,717,005 CONSTRUCTION ADMINISTRATION H Construction Inspection Services - CIP: 7.0% $182,281 I Construction Mgmt. - Industry Partner' 0,0% $0 J Construction Engineering Observer (CEO) - industry Partner 0.0% $0 K JOC Administration 00% $0 CONSTRUCTION ADMINISTRATION TOTAL: $182,281 ADMINISTRATIVE EXPENSES L CIP Dept. (Mgmt./Budget/Procurement/Comm.). 3.0% $78,120 M Industry Partner Program Mgmt. Support: 1.0% $28,040 ADMINISTRATIVE EXPENSES TOTAL: $104,181 LAND ACQUISITION EXPENSES N Land Cost: 0 Transaction Costs: 0.0% $0 LAND ACQUISITION TOTAL: $0 GRAND TOTAL - ESTIMATED PROJECT COST: $4,081,567 PROJECT SCOPE Removal and replacement of approximately 9,400 SF of concrete deck at the 36-0" Elevation North and South concourse of the Stadium, including structural framing and security fencing. Removal and replacement of approximately 6,000 SF of the metal stand of the lower bowl of the stadium. Repair of 32 raker beams at the lower bowl of the stadium, W 0 0 ti Fund: Hameian.a D'e+erse Funo --- Cleat: Sr ProAct Loansger Reviewed by: Accepted by: Pilar Saenz CIP Budget Administrator Jorge C Cano Director of the Client Department Fiscal Year .1.eaaDy CIP s 3 OC2 CO2 / CP_a �.* Cti"tr.. _,.... _.. aenoeeMr, Sign 61naeorr: $-t 364 Looser Apeem elt q Cate: / Date: / / f 0 r f41 DEPARTMENT, ALL C1FSECTION CHt5Fs, C1P SENIOR ACCOUNTANT.. HDR PROGRAM ssANAGER