HomeMy WebLinkAboutexhibit1BORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS '
(Third Amendment)
PROPOSAL
PAGE 2B
B-30297
ITEM 1: For the furnishing of all labor, materialss.f.
and
degf equipment
3ment required
for
the demolition of approximately
ck
including disposal, cleaning, and protection of any existing structure.
9400 s.f x $ , op = $ 3 76 0 0
.
Quantity Unit Price ITEM 1
2: For the furnishing of all labor, materials and equipment required for
ITEM approximately 9,400 s.f. of 41,4 "
the supply and installation of app y
composite deck system, including w.w.f. as per plans and
specifications.
x $ " . spaL. = $ / �' 2 3 G� a�
_ 9 400 s.f Quantity Unit Price ITEM 2
requ
ITEM 3: For the furnishing of all labor, materials and eequipment C 15 x b0 xd for
the removal and replacement of approximately
including end connections, sand blasting, priming, temporary,
shoring, temporary bracing, scaffolding, and lifting, as per plans and
specifications.
x $ 77ffD4'n - $
�� �Oc�cLl
58 ITEM 3
Quantity Unit Price .
ITEM 4: For the furnishing of all labor, materials and equipment : required for
the removal and replacement of approximately 49 —W 10 temporary
including end connections, sand blasting, priming,
shoring, temporary bracing, scaffolding, and lifting, as per plans and
specifications. 4 0 n�,
a
49 x $ ? ' 0 .� =
$ ITEM 4
Quantity Unit Price
5: For the furnishing of all labor, materials and equipment required 1f0or
ITEM approximately 150
the removal and replacement of app riming, temporary
including end connections, sand blasting, p
shoring, temporary bracing, scaffolding, and lifting, as per plans and
specifications.
2 0 �z' _ $ 3 9'6 a ;�
150 x $ e ITEM 5
Quantity Unit Price
ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS
(Third Amendment)
PROPOSAL
PAGE 2C
B-30297
ITEM 6: For the furnishing of all
llof terls and 141ment L 3 x 3 x required/8 x
for
the removal and replacementapproximately
20', including end connections, sand blasting, priming, temporary
shoring, temporary bracing, scaffolding, and lifting, as per plans and
specifications.
141
Quantity
x
Unit * rice
40
$ 124
ITEM 6
ITEM 7: For the furnishingfall labor, of approls and ximately 10 equipment L 5 x 3'r� required 0
for
the removal andreplacement
including end connections, sand blasting, priming, temporary
shoring, temporary bracing, scaffolding, and lifting, as per plans and
specifications.
10
Quantity
$ . 7L
Unit Price
$ cia0°"
ITEM 7
ITEM 8: For the furnishing of all labor, materials and
equipment
000 L.F. lred oe for
the removal and replacement of approximately
galvanized security panels, including priming and painting, as per
plans and specifications.
1,000 L.F. x $ /70 ' 5°
Quantity Unit Price
$ /7
ITEM 8
ITEM 9: For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 940 L.F. of
supplementary 2" 6 galvanized railing, including priming and
painting, as per plans and specifications.
�-
940 L.F. x $ d / $ Q.Wa a0
Quantity Unit Price ITEM 9
ITEM 10:
For the furnishing of all labor, materials, and equipment required to
remove and replace 16 sections of C 15 x 50 x 10' including
preparation, sand blasting, priming, temporary shoring, 'temporary
bracing, scaffolding, and lifting, as per plans and specifications.
16 x $ �/4'6 ' = $
Quantity Unit Price ITEM 10
ITEM 11:
ITEM 12:
ITEM 13:
ITEM 14:
ITEM 15:
ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS •
(Third Amendment)
PROPOSAL
PAGE 2D
B-30297
For the furnishing of all labor, materials and equipment required to
remove and replace 16 sections of W 16 x 36 x 10', including
preparation, sand blasting, priming, temporary shoring, temporary.
bracing, scaffolding, and lifting, as per plans and specifications.
16 _ x $ (P//o Pe $ Fis^‘o°°.
Quantity Unit Price ITEM 11
For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 6,000 s.f. of 3/16"
bent plates, as per plans and specifications.
6.000 s.f x $ 72 c'
Quantity Unit Price
$ 743Z dad"
ITEM 12
For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 416 cleats as per
plans and specifications.
416 x $732 4r� = $ 71Z"
Unit Price ITEM 13
Quantity
For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 80 support.
strengthening, as per plans and specifications.
80 x $ 2cid e _ $ / 9 ZOO re
Quantity Unit Price ITEM 14
For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 12 — 3/8" spacer
plates, as per plans and specifications.
12 x $ r0" = $5'2dO ce
Unit Price ITEM 15
Quantity
ITEM 16: For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 208 seat brackets, as
per plans and specifications.
208 x $ 33e " _ $
Quantity Unit Price ITEM 16
ITEM 17:
ITEM 18:
ITEM 19:
ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS
(Third Amendment)
PROPOSAL
PAGE 2E
B-30297
For the furnishing of all labor, materials and equipment required for
the removal and replacement of approximately 47 end connections
beams, as per plans and specifications.
47 _ x $ 2 a" _ $ /Zia10?"
Quantity
Unit Price ITEM 17
For the furnishing of all labor, materials and equipment required for
the removal and replacement of the benches of the Stadium, the
lump sum price of
Dollars and
Cents ($ 5000 °
$5440�
ITEM 18
For the furnishing of all labor, materials and equipment required for
the removal of the paint as spelled out in Division 6, wherever sand
blasting might be required as indicated on the plans and/or
specifications, the Iump sum price of
kV -tag
Cents ($ - 5
ollars and
$ S^Ode
ITEM 19
ITEM 20: Provisions for General Requirements as noted in Division 1, the lump
sum price of
r "at—ezo 'Mars and
Cents ($73610 a )
$ 9)3.600 "
ITEM 20
ITEM 21: "Provision for Special Items" as noted in Division 2, the Iump sum
price of
THREE HUNDRED FIFTY THOUSAND Dollars and
NO Cents = $ 350,000.00
ITEM 21