HomeMy WebLinkAboutexhibitAEXHIBIT A PROPOSAL BICENTENNIAL PARK SHORELINE STABILIZATION PROJECT — PHASE 2 B-30290 COMMISSION OF THE CITY OF MIAMI, FLORIDA DATED: \ ZC, PRIMARY OFFICE STREET ADDRESS: Q.T.(C'.,\v1t.. V:Cwt }(Y'.C.:\ \()rl:ji�,� f\V ;)c:' C.: Gentlemen: The undersigned, as Bidder (herein used in the masculine singular, irrespective of actual gender and number) hereby declares that the only persons interested in this Proposal are named herein, that no other person has any. Interest in this Proposal, or in the Contract to which this Proposal pertains, that this Proposal is made without connection or arrangement with any other person and that this Proposal is in every respect fair, in good faith, and without collusion or fraud. The Bidder further declares that he has complied in every respect with .all of the Instructions to Bidders, that he has read all addenda issued prior to the opening of Bids, and that he has satisfied himself fully relative to all matters and conditions with respect to the work to which the Proposal pertains. The Bidder proposes and agrees, if this Proposal is accepted, to execute all appropriate Contract Documents for the purpose of establishing a formal contractual •relationship :between him and the City of Miami, Florida, .for the furnishing of all materials, equipment and the performance of all work to which this Proposal pertains. The Bidder certifies that this: Bid is based upon all .items as shown on the Plans and/or listed in these Specifications, and that he has made no changes in these Contract Documents. The. Bidder further declares that he has carefully inspected the site of the proposed work. PROPOSAL Page 2 B - 30290 BICENTENNIAL PARK SHORELINE STABILIZATION PROJECT —•PHASE 2 THE BIDDER STATES THAT THIS PROPOSAL IS BASED UPON THE CONTRACT DOCUMENTS AND THAT HE ACKNOWLEDGES THE RECEIPT OF THE FOLLOWING ADDENDUM (ADDENDA): ADDENDUM No ADDENDUM No NOTE: The Bidder agrees to. perform all the work as described in the Specifications and as shown on the Plans for the unit and/or lump sum prices, as noted on the following sheets. .* * * * * * * * * * * * * * * * * * * * * * TOTAL BID: THE TOTAL OF ITEMS 1 THROUGH 21 BASED ON ,-ex i r--6't=r WW,} CALENDAR DAYS COMPLETION TIME, THE SUM OF: $ 3 31 (J TOTAL BID * *.* * * *-* * * * * * * * *-* *.* * * * * * * The City reserves the right to reject all bids. PROPOSAL. PAGE 2a B 30290 BICENTENNIAL PARK SHORELINE STABILIZATION PROJECT — PHASE 2 STARTING AND CONSTRUCTION TIMES: The Bidder .agrees to start work within ten (10) consecutive calendar days .after date of notice from the City to begin work. The work may be started on any working day within this ten (10) consecutive calendar day period. The Bidder shall complete the contract in accordance :.with the Plans and Specifications therefor, within the ' number of calendar : days specified on Proposal Page 2 . and no.. additional completion time shall be added for any optional items awarded. All work shall be in full and complete accordance with all terms and conditions set forth in . and covered by the contract documents: Should the contractor fail to complete the work on or before the date specified, it is agreed that for each calendar day that any portion of the work shall remain uncompleted, after the time specified in the proposal, with any extension of time which may be allowed by the City for the completion of thework provided for in the contract documents, the sum per day given in Division 1 - General Conditions, Section 6-9, shall be deducted from the monies due, the contractor, not as a penalty but as liquidated damages and added expense for inspection. The names of the Subcontractors and their current County -Municipal Occupational . License numbers for the type of work shall be listed below.. No change in Subcontractors will be allowed without approval of the City. Subcontractors shalk hold the license at the time of executing and during the performance of this contract. PROPOSAL Page.2b B - 30290 BICENTENNIAL PARK. SHORELINE STABILIZATION PROJECT:-- PHASE 2 If no Subcontractors are to be used, insert the word "Self' in the spaces under "Name of Subcontractor SUBCONTRACTOR'S. COUNTY -MUNICIPAL OCCUPATIONAL TYPE OF WORK NAME OF SUBCONTRACTOR LICENSE NUMBER Other (Bidder fill in) NOTE: CONTRACTOR'S SUPERINTENDENT ON 24-HOUR CALL. In the event that the City Inspector or the Engineer -of -Record must contact the Contractor to perform emergency repair work to correct hazardous or unsafe conditions or problems relating to public health or welfare as a result of or associated with the project construction; the Contractor shall provide the name and 24 hourtelephone number of the job superintendent to be contacted in the space provided below: The Contractor shall also provide a toll -free .telephone number for his business office for use during normal business .hours of 8:00 a.m. - 5:00 p.m. Monday through. Friday. BICENTENNIAL PARK SHORELINE STABILIZATION PROJECT PHASE 2 PROPOSAL Page 2c B-30290. ITEM 1; For furnishing all labor, equipment and materials necessary for performing all the work for the site preparation of the construction area paralleling the new bulkhead wall as shown onplan sheet 4 of the contract drawings. At the lump sum price of ` L\r i Dollars and KRA ,dd cClr K u Cents _ $ 1 ?. ;I U() lump:sum ITEM 1 For furnishing all labor, equipment .and materials necessary for performing all the work for the removal and disposal of concrete slabs (riprap) located at the west end of the F.E.C. Boat. Shp as shown in the contract drawings. At the lump sum price of 4 (),1 .. �' a :' � S W� irk -� \I Dollars and 1 1t\ Cents _ $ 5 I l.:a5Q lump sum ITEM 2 ITEM 3 For furnishing all labor, equipment and materials necessary for performing all the work for the removal and disposal of steel sheet piles as shown and described in the contract drawings. At the lump sum price of One 1'10'1 . wirl"1��'r �..y bents lump sum ITEM 5 Forfurnishing all labor, equipment and materials necessary for .., performing all the work for the •removal and disposal of concrete panels between steel piles, as shown on the contract drawings. At the lump sum price of Vtoci. Fty RID Cents lump sum For furnishing all labor, 'equipment and materials necessary for performing all the work for the removal and disposal of steel piles as shown on the contract drawings: At the lump sum price of e A'hc: _s cir�ci Dollars and Yt C.Cents lump sum For',furnishing all ,labor, equipment and materials .necessary for performing all the work for the•removal and disposal of steel beams as shown on the contract drawings. At the lump sum price .of i-4 L.? Tir r1 / Dollars. and NC Cents = lump sum BICENTENNIAL PARK SHORELINE PROPOSAL STABILIZATION PROJECT. Page 2d PHASE 2. B-30290 For furnishing - all labor, equipment .and materials. necessary for performing all the work .for the removal and disposal of stone riprap as shown on the contract .drawings: At the lump sum price of C1 SCVec.'1 -IVCI, xr; 'tir"` nk(r)e Dollars and ' trdieri Cents lump sum For furnishing all labor, equipment and materials necessary for performingall the work for the excavation of underwater material between the old and the new bulkhead walls. Estimated 855 CY , the. unit price of j'Ver)i t )i Dollars and N1C Cents ($ v l..a .,v6 ) X 855 CY, $ LOHi t( (: per cubic yard. ITEM 8 ITEM 9: For furnishingall labor, equipment, and materials necessary for performing all the work for mangrove mitigation At the lump sum price of IN(I-) -3)- 7d j-u,C) \7U1NedDollars and N:10 Cents $ lump sum ITEM 9 ITEM 10: For furnishing all labor, equipment and materials necessary for performing all the work for removal and disposal of trees and shrubs within the limits of construction delineated on Demolition Plan of the contract drawings. At the lump sum price of ..j4.\C }: C «C'i five.h d.Dollars and 1-_.1() Cents $ I t.tn lump, sum 111EM 10 For furnishing all labor,, equipment ; and raterials necessary for performing all the work for the rubble riprap in front of wall. Estimated 2C0 CY, the unit price of Dollars and Cents C . X 200 CY iCO per cubic yard : ITEM 11 ITEM 12: Provisionfor rubble riprap (additional provided per DERM. requirements). Estimated 614 CY. Lump Sum of FORTY NINE THOUSAND ONE HUNDRED TWENTY Dollars and No .Cents $49,120 lump sum ITEM 12 BICENTENNIAL PARK SHORELINE PROPOSAL. STABILIZATION PROJECT Page 2e PHASE 2 B.30290 ITEM 13: For furnishing all labor, equipment and materials; necessary for performing all the work for the #57 stone filler to be placed behind new bulkhead wall and below mean high water line. Estimated 580 CY, the unit price of 117n-k- l "1 Dollars a n d tc-o. Cents ($ . �} t 'ZC ) X 580 CY $ 1;2. .t/ per cubic and ITEM 13 ITEM 14: For furnishing all labor, equipment and materials necessary for performing all the work for lirnerock fill, Estimated 1290 CY, the unit price of 66C`r1( 'tI' ► C� CT_ Dollars and 10 , Cents '. ) X 1290= $ El J� per cubic yard ITEM 14 ITEM 15: For furnishing all labor, equipment and materials . necessary for performing all the work for furnishing and installing steel sheet piling forwalls type 1, type 2, type 3, type 4, type 5 and "type 6 asshown on the contract drawings. Estimated 695 LF (in plan view), the unit price of k'Tha_E•c:i-d Tly Dollars and -11Lcni--ys-ever) Cents ($ l ]011,; d1) X 695 LF= $ it Sz)cV�58 per linear foot ITEM 1t5 ITEM 16: For furnishing all labor, equipment and materials necessary for performing all the work for pipe outfall extension 48" diameter as shown and described in the contract drawings. At the lump sum price of. AN(' ' ` i41i -e ��7� 'i l<. � . , Dollars and ht.rVir-,C,;t i\iC5 Cents lump sum ITEM 17: • For furnishing all labor, equipment and materials necessary for performing all the work for reinforcing steel. Estimated 77600 LB, the unit price of K Cents ($ ) X7•7600LB= per pound Dollars and 2-562 ITEM 17 ITEM 18: ITEM 19: ' )3E it - ITEM 20: ITEM 21: BICENTENNIAL PARK SHORELINE STABILIZATION PROJECT PHASE 2 PROPOSAL Page 2f B-30290 For :furnishing all labor, equipment and materials necessary for performing all the work for cast -in -place concrete. Estimated 930 .CY, the unit price of irlfcci v )t per cubic yard Cents e Dollars and , (45 ) X 930 CY= $ 'Fl& 2.1:. 4 :ITEM 18 For furnishing all labor, equipment and materials necessary for performing all the work for removable wood curb (treated structural timber). Estimated 3720 BF, the unit price of thrp£� . Dollars and NO Cents'($.`76.c: > ) X Dg2.6 LB Co 40 BF ITE/M 19 Provision for General Requirements as noted in Division 1 the. lump sum of C 'gC hLnd_rP r rtas E . NO Cents = S D.liars and lump sum Provision for Special Items and/or contingency items Division 2, the lump sum of TWO HUNDRED FIFTY FOUR THOUSAND FIVE FORTY SIX . Dollars and NO Cents lump sum. .0 h t-_ 1 B3; 8' \Q ITEM 20 as noted in HUNDRED $ 254,546 ITEM 21 Cane. >`nG pq.pve II nDf j. * \ DLDf r 1ec.m f c S r1-9 add :OLT onc } �ci\\01( Pc CLAN C;. crcf } 086 ' \ _%,ran o- \ C c nCr€ t 17 b -~ (c70 1 pox.:_? red X ti CCU - t n - �I ce CC7nt~'re r ' \n c ? o ocC_'-k -pfo-po-DccA CAC CA 9D 1 cjO C> -1- (; N r rcrr eLk "p \ e'cke