HomeMy WebLinkAboutexhibitAEXHIBIT A
PROPOSAL
BICENTENNIAL PARK SHORELINE
STABILIZATION PROJECT — PHASE 2
B-30290
COMMISSION OF THE CITY
OF MIAMI, FLORIDA
DATED: \ ZC,
PRIMARY OFFICE STREET ADDRESS: Q.T.(C'.,\v1t.. V:Cwt }(Y'.C.:\ \()rl:ji�,�
f\V ;)c:' C.:
Gentlemen:
The undersigned, as Bidder (herein used in the masculine singular, irrespective of
actual gender and number) hereby declares that the only persons interested in this
Proposal are named herein, that no other person has any. Interest in this Proposal,
or in the Contract to which this Proposal pertains, that this Proposal is made
without connection or arrangement with any other person and that this Proposal is
in every respect fair, in good faith, and without collusion or fraud.
The Bidder further declares that he has complied in every respect with .all of the
Instructions to Bidders, that he has read all addenda issued prior to the opening of
Bids, and that he has satisfied himself fully relative to all matters and conditions
with respect to the work to which the Proposal pertains.
The Bidder proposes and agrees, if this Proposal is accepted, to execute all
appropriate Contract Documents for the purpose of establishing a formal
contractual •relationship :between him and the City of Miami, Florida, .for the
furnishing of all materials, equipment and the performance of all work to which this
Proposal pertains.
The Bidder certifies that this: Bid is based upon all .items as shown on the Plans
and/or listed in these Specifications, and that he has made no changes in these
Contract Documents.
The. Bidder further declares that he has carefully inspected the site of the
proposed work.
PROPOSAL
Page 2
B - 30290
BICENTENNIAL PARK SHORELINE
STABILIZATION PROJECT —•PHASE 2
THE BIDDER STATES THAT THIS PROPOSAL IS BASED UPON THE
CONTRACT DOCUMENTS AND THAT HE ACKNOWLEDGES THE RECEIPT
OF THE FOLLOWING ADDENDUM (ADDENDA):
ADDENDUM No ADDENDUM No
NOTE: The Bidder agrees to. perform all the work as described in the
Specifications and as shown on the Plans for the unit and/or lump sum prices, as
noted on the following sheets.
.* * * * * * * * * * * * * * * * * * * * * *
TOTAL BID: THE TOTAL OF ITEMS 1 THROUGH 21
BASED ON ,-ex i r--6't=r WW,} CALENDAR DAYS
COMPLETION TIME, THE SUM OF: $ 3 31 (J
TOTAL BID
* *.* * * *-* *
* * * * * * *-* *.* * * * * * *
The City reserves the right to reject all bids.
PROPOSAL.
PAGE 2a
B 30290
BICENTENNIAL PARK SHORELINE
STABILIZATION PROJECT — PHASE 2
STARTING AND CONSTRUCTION TIMES:
The Bidder .agrees to start work within ten (10) consecutive calendar days .after
date of notice from the City to begin work. The work may be started on any
working day within this ten (10) consecutive calendar day period. The Bidder shall
complete the contract in accordance :.with the Plans and Specifications therefor,
within the ' number of calendar : days specified on Proposal Page 2 . and no..
additional completion time shall be added for any optional items awarded. All work
shall be in full and complete accordance with all terms and conditions set forth in
. and covered by the contract documents:
Should the contractor fail to complete the work on or before the date specified, it is
agreed that for each calendar day that any portion of the work shall remain
uncompleted, after the time specified in the proposal, with any extension of time
which may be allowed by the City for the completion of thework provided for in the
contract documents, the sum per day given in Division 1 - General Conditions,
Section 6-9, shall be deducted from the monies due, the contractor, not as a
penalty but as liquidated damages and added expense for inspection.
The names of the Subcontractors and their current County -Municipal Occupational
. License numbers for the type of work shall be listed below.. No change in
Subcontractors will be allowed without approval of the City. Subcontractors shalk
hold the license at the time of executing and during the performance of this
contract.
PROPOSAL
Page.2b
B - 30290
BICENTENNIAL PARK. SHORELINE
STABILIZATION PROJECT:-- PHASE 2
If no Subcontractors are to be used, insert the word "Self' in the spaces under
"Name of Subcontractor
SUBCONTRACTOR'S.
COUNTY -MUNICIPAL
OCCUPATIONAL
TYPE OF WORK NAME OF SUBCONTRACTOR LICENSE NUMBER
Other (Bidder fill in)
NOTE: CONTRACTOR'S SUPERINTENDENT ON 24-HOUR CALL. In the event
that the City Inspector or the Engineer -of -Record must contact the Contractor to
perform emergency repair work to correct hazardous or unsafe conditions or
problems relating to public health or welfare as a result of or associated with the
project construction; the Contractor shall provide the name and 24 hourtelephone
number of the job superintendent to be contacted in the space provided below:
The Contractor shall also provide a toll -free .telephone number for his business
office for use during normal business .hours of 8:00 a.m. - 5:00 p.m. Monday
through. Friday.
BICENTENNIAL PARK SHORELINE
STABILIZATION PROJECT
PHASE 2
PROPOSAL
Page 2c
B-30290.
ITEM 1; For furnishing all labor, equipment and materials necessary for
performing all the work for the site preparation of the construction
area paralleling the new bulkhead wall as shown onplan sheet 4 of
the contract drawings. At the lump sum price of
` L\r i Dollars and
KRA ,dd cClr K u Cents _ $ 1 ?. ;I U()
lump:sum ITEM 1
For furnishing all labor, equipment .and materials necessary for
performing all the work for the removal and disposal of concrete
slabs (riprap) located at the west end of the F.E.C. Boat. Shp as
shown in the contract drawings. At the lump sum price of
4 (),1 .. �' a :' � S W� irk -� \I Dollars and
1 1t\ Cents _ $ 5 I l.:a5Q
lump sum ITEM 2
ITEM 3 For furnishing all labor, equipment and materials necessary for
performing all the work for the removal and disposal of steel sheet
piles as shown and described in the contract drawings. At the lump
sum price of
One 1'10'1 . wirl"1��'r
�..y bents
lump sum
ITEM 5
Forfurnishing all labor, equipment and materials necessary for ..,
performing all the work for the •removal and disposal of concrete
panels between steel piles, as shown on the contract drawings. At
the lump sum price of
Vtoci. Fty RID Cents
lump sum
For furnishing all labor, 'equipment and materials necessary for
performing all the work for the removal and disposal of steel piles as
shown on the contract drawings: At the lump sum price of
e A'hc: _s cir�ci Dollars and
Yt C.Cents
lump sum
For',furnishing all ,labor, equipment and materials .necessary for
performing all the work for the•removal and disposal of steel beams
as shown on the contract drawings. At the lump sum price .of
i-4 L.? Tir r1 / Dollars. and
NC Cents =
lump sum
BICENTENNIAL PARK SHORELINE PROPOSAL
STABILIZATION PROJECT. Page 2d
PHASE 2. B-30290
For furnishing - all labor, equipment .and materials. necessary for
performing all the work .for the removal and disposal of stone riprap
as shown on the contract .drawings: At the lump sum price of
C1 SCVec.'1 -IVCI, xr; 'tir"` nk(r)e Dollars and '
trdieri Cents
lump sum
For furnishing all labor, equipment and materials necessary for
performingall the work for the excavation of underwater material
between the old and the new bulkhead walls. Estimated 855 CY , the.
unit price of
j'Ver)i t )i Dollars and
N1C Cents ($ v l..a .,v6 ) X 855 CY, $ LOHi t( (:
per cubic yard.
ITEM 8
ITEM 9: For furnishingall labor, equipment, and materials necessary for
performing all the work for mangrove mitigation At the lump sum
price of
IN(I-) -3)- 7d j-u,C) \7U1NedDollars and
N:10 Cents $
lump sum
ITEM 9
ITEM 10: For furnishing all labor, equipment and materials necessary for
performing all the work for removal and disposal of trees and shrubs
within the limits of construction delineated on Demolition Plan of the
contract drawings. At the lump sum price of
..j4.\C }: C «C'i five.h d.Dollars and
1-_.1() Cents $ I t.tn
lump, sum 111EM 10
For furnishing all labor,, equipment ; and raterials necessary for
performing all the work for the rubble riprap in front of wall. Estimated
2C0 CY, the unit price of
Dollars and
Cents C . X 200 CY iCO
per cubic yard : ITEM 11
ITEM 12: Provisionfor rubble riprap (additional provided per DERM.
requirements). Estimated 614 CY. Lump Sum of
FORTY NINE THOUSAND ONE HUNDRED TWENTY Dollars and
No .Cents $49,120
lump sum ITEM 12
BICENTENNIAL PARK SHORELINE PROPOSAL.
STABILIZATION PROJECT Page 2e
PHASE 2 B.30290
ITEM 13: For furnishing all labor, equipment and materials; necessary for
performing all the work for the #57 stone filler to be placed behind
new bulkhead wall and below mean high water line. Estimated 580
CY, the unit price of
117n-k- l "1 Dollars a n d
tc-o. Cents ($ . �} t 'ZC ) X 580 CY $ 1;2. .t/
per cubic and ITEM 13
ITEM 14: For furnishing all labor, equipment and materials necessary for
performing all the work for lirnerock fill, Estimated 1290 CY, the unit
price of
66C`r1( 'tI' ► C� CT_ Dollars and 10 ,
Cents '. ) X 1290= $ El J�
per cubic yard ITEM 14
ITEM 15: For furnishing all labor, equipment and materials . necessary for
performing all the work for furnishing and installing steel sheet piling
forwalls type 1, type 2, type 3, type 4, type 5 and "type 6 asshown
on the contract drawings. Estimated 695 LF (in plan view), the unit
price of
k'Tha_E•c:i-d Tly Dollars and
-11Lcni--ys-ever) Cents ($ l ]011,; d1) X 695 LF= $ it Sz)cV�58
per linear foot ITEM 1t5
ITEM 16: For furnishing all labor, equipment and materials necessary for
performing all the work for pipe outfall extension 48" diameter as
shown and described in the contract drawings. At the lump sum price
of.
AN(' ' ` i41i -e ��7� 'i l<. � . , Dollars and
ht.rVir-,C,;t i\iC5 Cents
lump sum
ITEM 17: • For furnishing all labor, equipment and materials necessary for
performing all the work for reinforcing steel. Estimated 77600 LB, the
unit price of
K Cents ($ ) X7•7600LB=
per pound
Dollars and
2-562
ITEM 17
ITEM 18:
ITEM 19: '
)3E it -
ITEM 20:
ITEM 21:
BICENTENNIAL PARK SHORELINE
STABILIZATION PROJECT
PHASE 2
PROPOSAL
Page 2f
B-30290
For :furnishing all labor, equipment and materials necessary for
performing all the work for cast -in -place concrete. Estimated 930 .CY,
the unit price of
irlfcci
v
)t
per cubic yard
Cents
e Dollars and
, (45 ) X 930 CY= $ 'Fl& 2.1:.
4
:ITEM 18
For furnishing all labor, equipment and materials necessary for
performing all the work for removable wood curb (treated structural
timber). Estimated 3720 BF, the unit price of
thrp£� . Dollars and
NO Cents'($.`76.c: > ) X Dg2.6 LB
Co 40
BF
ITE/M 19
Provision for General Requirements as noted in Division 1 the. lump
sum of
C 'gC hLnd_rP
r rtas E .
NO Cents = S
D.liars and
lump sum
Provision for Special Items and/or contingency items
Division 2, the lump sum of
TWO HUNDRED FIFTY FOUR THOUSAND FIVE
FORTY SIX . Dollars and
NO Cents
lump sum.
.0
h t-_
1 B3; 8' \Q
ITEM 20
as noted in
HUNDRED
$ 254,546
ITEM 21
Cane. >`nG pq.pve II nDf j.
* \ DLDf r 1ec.m f c S r1-9 add :OLT onc
} �ci\\01( Pc CLAN C;. crcf }
086
' \ _%,ran o- \
C c nCr€ t 17 b -~ (c70 1
pox.:_? red
X ti CCU - t n - �I ce CC7nt~'re r
' \n c ? o ocC_'-k -pfo-po-DccA
CAC CA 9D 1 cjO C> -1- (; N r rcrr
eLk
"p \ e'cke