Loading...
HomeMy WebLinkAboutexhibit21 1 1 1 Zyscovilch January 11, 2005 Ms. Cary Sanchez Rea Program Manager URS Corporation 7650 Corporate Center Drive — Suite 401 Miami, FL 33126 RE: CITY OF MIAMI LITTLE HAITI CULTURAL CENTER Dear Ms. Sanchez Rea: We are delighted to submit our proposal for Architectural/Engineering design services for the Little Haiti Cultural Center, We have arranged our proposal based on our understanding of the cultural center needs previously discussed during our meeting. The new work will generally involve the construction of an 18,275 square feet Cultural Arts building with black box theater, a 12,000 square feet Community Center, a Plaza, and (3) three parking parcels with a total of 183 parking spaces with related site work. We anticipate the construction budget for this project to be approximately $9,949,058.00. We have carefully evaluated our fees, recognizing the unique conditions of this project as well as the need to reduce the fee to the lowest levels possible. We propose the following: A. Basic Service Fee Proposal: This includes the scope of services listed in the A/E Owner Architect Agreement. ' Basic Services B. Supplemental Services; $ 990,000.00 $ 7,000.00 2. Permit Expediting: This work will include meeting with jurisdictional authorities and follow-up administration to reduce the typical permitting time. Permit Expediting $ 12,000.00 3. Threshold Inspections: As required by the Florida Building Code. Threshold Inspections 1. Programming: This work will be especially important to the project. It will define all equipment, furniture and fixtures to be provided in the facility with related utility equipment. This will become the basis of the design. Also this work will be important to establish the equipment, furniture and fixture budget for purchase by the City Parks Department. Programming $ 16,000.00 100 N Biscayne Blvd 27th Flanr Miami, FL 33132 voice "" 775222 fax 305 577 4521 e mail mailTnzyscovich.cnm Zyscovich C. Exclusions The above listed fees do not include the following: . renter areas beyond the scope of work shown in the conceptual plans attaci icu. D. Reimbursable expenses as agent for ow. 1. Geotechnical Engineering 2. Surveying 3, Environmental Studies 4. Underground Utility Verification 5, Flow Test 6. Reproduction Expenses r $ 90,000.00 subtotal $ 6 : i0.00 subtotal $ 25,000.00 We are extremely excited about this project and are ready to begin work immediately. If you have any questions please feel free to contact me at your earliest convenience. Sincerely, 100 N Biscayne Blvd 27th Floor Miami, FL 33132 f,lprojectslmarkelinglproposahleeproplLittle Haiti Cultural Center\LHCCproposal.doc voice 305 372 15222 alea< 3DFSMICON e mail mail@zyscovich.com weh www.iyscovich,com tie He Cultural Cenfer Zyscovich ritk Conceptual Site Plan ZYSCOV!CH *,aya�{anG�aup Little Haiti Cultural Center Preliminary Budget $ 9,949,057.84 Inflation 10 711l05 Building Program Area Cultural Arts Building (Black Box) 18275 $ 235.00 $ Community Center 12000 $ 185.00 $ 1/T1/2005 4,294,625 2,220, 000 Site Demolllion Demo Existing Sidewalk 15500 $ 0.75 $ 11,625 Tree Removal $ 13,500 Existing Buildings $ 60,000 Site Clear and Grub $ 9,680 Asphalt Removal B street (syds) 3500 $ 10.00 $ 35,000 Paving Concrete Pavers $ 69,750 Asphalt Tie-in wl MOT (sf) 2000 $ 4.25 $ 8,500 Conc Parking Pavers w/ Subgrade (s}) 60400 $ 4.50 $ 271,800 Type D Curbs (If) 3600 $ 18.00 $ 64,000 Wheel Stops and Pavement Markings $ 10,000 Traffic Signage $ 1,000 Earthwork (Grading) Building Pads (cyd) 3500 $ 14.00 $ 49,000 4' Stabilized Subgrade fitwalks (cyd) 1250 $ 9.50 $ , 11,675 2' Topsoil @ Landscape & Sod (cyd) 440 $ 30 00 $ 13,200 Ulililies (Allowances) Slorm Drainage/ Sewer/ Waler Service $ 300,000 Landscape Trees $ 19,500 Palms (16' GW, Royals) $ 102,500 Shrubs & Mulch $ 18,150 Sodded Areas (24,400 st) $ 6,568 Irrigation $ 38,750 Courtyard Ammenities Signage $ 15,000 Concrete Bollards (20 ea) $ 12,000 Concrete Benches (15 ea) $ 7,500 Tree Grates (41 ea) $ 34,650 Fence & Gales (6' sleet picket, ESP) $ 35,000 Sile Lighting and Power § 120,000 Subtotal $ 7,854,193 Contingency 0 10% $ 785,419 General Condirions $ 562,254 Insurance 8 Bond 0 2% $ 184,037 Overhead 8 Pro/if ® 6% $ 563,154 4 ittle Ili Cultural Center amity ofMimi 1 F.rapt:nal submittat ID Task mare* 3 5 _ Negotilalions Auth0ri2a60111O Proceed Schematic Desiort Dry Miam 6 CM Review 6esign Development C4yoIM,ar 6 CM Review.. Construction Documents SO% Construction Documents City oi Ivliarni CM Review —Tf-- 100% COestructien Documents I A 42 .C.y of Miami 6 CM Review — 13 Permilling 14 GMP Bidding, Negotiations II Award Ground Breaking Celebration 16 Construction —Tr- Final ComoletiUn 110 Buildings, Plaza. and Related Sitework Subslantial Completion Duration ; Start 0 days Tue1/11/05 poos TUe i trfios Fmisn Pre, I Dec Jan I —Feb MarLApr To F__Iun 1—Jul LLs. r Sep 1 OcLU.Ice_e_j_ J;_teC 1/11 21 days Tue 1/11/05 Mon 1131105 1 0 days Mon 1/33/05, Mon 1/31/05 2 • 20 days Tue 211/05: Sun 2.2aros 3 • 5.days mon ..2/2iro5 Fri 2125105 4 20 days . Sat •+,-'26p05 Thu 367/05 5 5 days Fri in a.no. T we 1,22;05 6 105days Wed 3/23610Tue 715/05 30 days liVed 3/23/05 Thu 4/21M5 7 5 days Fri 4/22105 Tue 4126105 30 days Wed 4/27/05 Thu 5/26/05 .10 5 days Fri 5/27/05 , Tue 5731/05 11 40 days Fri 5127105 I Tue 11 30 days WS-ij6/11135 Thu 6/30105 /2 0 days Thu 6/33/85 Tho 6/30/05 14 460 days Fri 7/1t6S Mon10,23MS 450 days , Fri 7/1/05 Sat 03/06 14 0 days Sat 5/231136 - Sal 9/238:16 17 30 days Sun 4r2006 Mon 10/23/06 18 1/31 5 • 6„0 Fet71—Mar AP( May Jun rJul I Pape 1