HomeMy WebLinkAboutexhibit2Proposal for Architectural & Engineering Services
Jose Marti Park Community Center
The City of Miami
January 10, 2005
•
, ".4r5'r¢:.Yrn.. ,•14+r140.r.4,•rW1,107 .204
a_9ll?k ;Au•. "4F6•'4. 4,
January 10, 2005
Mr. Cary Sanchez Rea
Program Manager
URS Corporation
7650 Corporate Center Drive — Suite 401
Miami, FL 33126
RE: CITY OF MIAMI
JOSE MARTI PARK COMMUNITY CENTER
Dear Ms. Sanchez Rea:
We are delighted to submit our proposal for Architectural/Engineering design services for the
Jose Marti Park Community Center. We have arranged our proposal based on our understanding.
of the Community Center needs previously discussed during our earlier meeting and as described
in this proposal. In general, the new work will generally involve the construction of a 31,000 SF
Community Center including the gymnasium, locker rooms and related auxiliary spaces with
related sitework. We anticipate the construction budget for this project to be approximately
$5,990,000.00.
We have carefully evaluated our fees, recognizing the unique conditions of this project, the need
to accelerate design as well as the need to reduce the fee to the lowest levels possible. We
propose the following:
A. Basic Service Fee Proposal: This includes the scope of services listed in the
attached A/E Owner Architect Agreement.
Basic Services $ 477,328.00
B. Supplemental Services:
1. Programming: This work will be especially important to the project. It will
define all equipment, furniture and fixtures to be provided in the facility with
related utility equipment. This will become the basis of the design. Also this
work will be important to establish the equipment, furniture and fixture budget
for purchase by the City Parks Department.
Programming $ 5,000.00
2. Permit Expediting: This work will include meeting with jurisdictional
authorities and follow-up administration to reduce the typical permitting time.
Permit Expediting $ 7,500.00
3. Threshold Inspections: As required by the Florida Building Code.
Threshold inspections $ 16,000.00
100 N Biscayne Blvd
271h, Floor
Miami, FL 33132
voice 305 372 5222
fax 305 577 1521
1D11110 �il[+>taw�uict+co�n
NRiE& .iisrmAI WAEWAUII7
L'ic.4i AA C001431
C. Reimbursable expenses as an agent for the City
(Surveying, Geotechnical, Flow Test, Underground Utility Verification)
Reimbursable Expenses (Not to Exceed) $ 15,000.00
D. Reproduction
(Printing Cost and Courier Services)
Reimbursable Expenses (Not to Exceed) $ 10,000.00
E. Exclusions
The above listed fees do not include the following:
1. Park areas beyond the scope of work shown in the conceptual plans
attached.
2. Environmental Studies
We are extremely excited about this project and are ready to begin work immediately. If you have
any questions please feel free to contact me at your earliest convenience.
Sincerely,
ZYSCO ICH IN
J
Att
Jose Marti Park Community Center
Site Area
r Aelk
Jose Marti Park Community Center
Conceptual Ground Floor Plan
1
.5W bed AV.
Conceptual Upper Level Plan
•
L.