HomeMy WebLinkAboutSite Utility Study•
•
•
MARQUIS
Biscayne Boulevard and NE llth Street
Site Utility Study
CTE Project No. 04-042440.A
Prepared by:
CONSUL -TECH DEVELOPMENT SERVICES, INC.
Florida Certificate of Authorization No. 9008
10570 N.W. 27th Street, Suite 101
Miami, Florida 33172
Tel. 305-599-3141
Fax. 305-599-3143
OCTOBER, 2004
•
•
•
I. INTRODUCTION
The proposed project site is located between NE 1 1th Street and 11t Terrace, and between
Biscayne Boulevard and NE 2nd Avenue. The site area is 0.99 acres.
The proposed project will include a 61-story residential tower with a parking garage and some
retail areas. The tower will have a total of 296 condominium units, 14 townhouses and 48 room
boutique hotel, and 5,765 SF area for a 200 seats restaurant.
IL DRAINAGE SYSTEM
For drainage design purposes, the site will be considered 100% impervious. Landscape and
green areas are provided, but these areas will not be considered in the calculations in an effort to be
conservative in the storm water management design. Storm water discharge will consist of runoff
from rooftops, roadways, vertical building faces and pedestrian areas. Miami -Dade DERM requires
that the proposed drainage system take into account 1/3 of the largest vertical building face. The
building faces exposed to the south will produce the largest amounts of runoff and will be accounted
for in the calculations. The site land use can be summarized as follows:
Total Net Impervious Vertical Total
Lot Area Area Building Faces Drainage Area
(Acres) ,(Acres) (33%) (Acres)
(Acres)
0.99 0.99 0.92
1.91
The proposed drainage plan calls for all pavement runoff to be collected in catch basins
capable of detaining the peak inflow from the Miami -Dade County DERM 5-year, 24-hour design
storm for 90 seconds. These basins also contain baffles to prevent all oil, grease and foreign
matter from flowing into the proposed system. The runoff will then flow into three proposed
drainage wells based on calculations found in Table 1. Runoff from building rooftops and
vertical faces are uncontaminated by oil and grease and may be piped directly into to the drainage
wells. The use of drainage wells is permitted by Dade County DERM in this area due to the high
level of salinity found in the groundwater. Since the proposed system is using drainage wells to
•
•
•
dispose of excess runoff, an exfiltration trench system will be designed to treat the larger of the
first inch of runoff generated before disposing of any runoff, or 2.5 inches over the impervious
area. The proposed well and exfiltration trench systems will keep the site dry during the DERM 5
year - 24 hour storm.
Biscayne Boulevard is a Florida Department of Transportation Right -of -Way. According to
Department rules, additional calculations must be performed to prove to the Department that there
will be no discharge into the State Right -of -Way. The drainage well system will be designed to
retain the maximum storm stage of the 100-year, 1, 2, 4, 8, 24, 72, 168, and 240-hour storm
events.
III. WATER DISTRIBUTION MASTER PLAN
The Miami -Dade Water and Sewer Department (MD-WASD) provides the water service in this area.
Currently, there are two existing 24-inch water mains on Biscayne Blvd, a 12-inch water main on NE 2n
Avenue, and a 6-inch water main on NE 11t' Street. No water mains exist along NE 11h Terrace. Refer to
the attached Water Atlas for additional information.
The MD-WASD will probably require the construction ofa newl2-inch water main along 1 1th Street
and also along NE 11h Terrace. Nevertheless, because of the existing water mains along the Biscayne and
NE 2nd Avenue, it is possible that MD-WASD, instead of requiring the construction of the water mains, will
be content with a contribution for the construction of future water mains in the area. Depending on the
requirements of MD-WASD, the water and fire line connections for this project will be provided from the
existing or new 12-inch water main. At least one fire hydrant should be installed on the proposed water
main.
The anticipated average daily water consumption for the entire project is 77,500 GPD, and is
calculated as shown in Table 2.
•
•
•
IV. SANITARY SEWER MASTER PLAN
The Miami -Dade Water and Sewer Department (MD-WASD) also provides the sanitary sewer
service in this area. There are existing 8-inch gravity sanitary sewer mains running along all the
surrounding. Service to this project will be provided by sanitary laterals connected to the existing sewer
mains.
This project is anticipated to generate an average daily sewage flow of 77,500 GPD, and is
calculated as shown in Table 2.
The wastewater produced by the site will travel via the existing sanitary sewer system to the MD-
WASD Regional Pump Station No. 2. Pump station No. 2 is currently operating for 5.06 hours per day.
The additional 77,500 GPD will only increase the elapsed time by 0.05 hours to 5.11 hours per day. Thus,
the pump station is deemed capable of handling the proposed flow from the project. Pump Station No. 2
transmits all flow directly to the MD-WASD treatment plant on Virginia Key for final treatment before
discharge into the Atlantic Ocean. Refer to the attached Miami -Dade DERM projections for more
information.
V. SOLID WASTE GENERATION
Solid waste generated will be placed in standardized on -site containers for refuse and recyclables per
the City of Miami Code, for regular pickup by private hauling companies and/or the City of Miami Solid
Waste Department. The solid waste will then be transported to Miami-Dade's Disposal Facilities. Actual
waste pick-up locations will be shown in the architectural plans.
This project is anticipated to generate an average daily solid waste volume of 552.9 Cu. Yd/month,
and is calculated as shown in Table 3. Generation rates were determined from data provided by the Miami -
Dade County Department of Solid Waste.
•
•
•
Total Net Lot Area
Total Drainage Area
1. Impervious
2. Pervious
TABLE 1
MARQUIS
DRAINAGE CALCULATIONS
= 0.99 Acres
= 1.91 Acres
= 100% or 1.91 Acres
= 0% or 0.00 Acres
2. Average Runoff Coefficient = 0.98
3. SFWMD Design Storm Information
1. 5-Year 24-Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 6.20 inches per hour
Purpose = Flood Protection
Peak Runoff = CIA = (0.98)(6.20)(1.91)
= 11.61 cfs
2. SFWMD 25 Year 72 Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 7.40 inches per hour
Purpose = Perimeter Berm
Peak Runoff = CIA = (0.98)(7.40)(1.91)
= 13.85 cfs
3. FDOT 100 Year - 1 Hour Storm
Rainfall Intensity = 5.10 inches per hour
Purpose = Discharge to Biscayne Blvd.
Peak Runoff = CIA = (0.98)(5.0)(1.91)
= 9.36 cfs
•
•
FDOT Design Storm Information
Storm Duration
1 Hour
2 Hour
4 Hour
8 Hour
24 Hour
72 Hour
168 Hour
240 Hour
4. Well Data
Rainfall Amount (Inches)
5.0 (Figures 5-1 & 5-11)
6.3 (Figures 5-1 & 5-11)
7.8 (Figures 5-1 & 5-11)
9.6 (Figures 5-1 & 5-11)
14.0 (Figure 5-13)
19.0 (Figures 5-14 & 5-15)
20.0 (Figure 5-16)
23.0 (Figure 5-17)
1. Well Diameter
2. Assumed Well Capacity
3. Mean High Tide Elevation
4. Specific Gravity Head Loss
5. Proposed Number of Wells
5. Hydraulic Grade Line Elevations at Well Structure
= 24 Inches
= 700 gpm/ft. of Available Head
=1.50 ft. (taken from W.C. 20,034-A)
= 2.00'
=3
1. 5 Year DERM Storm
= (11.61 cfs)/[(700 gpm/ft head)(0.002228 cfs/gpm)(3 wells)] + (1.50 + 2.00)
= 5.98' NGVD
2. SFWMD 25 Year - 72 Hour Storm
= (13.85)[(700 gpm)(0.002228 cfs/gpm)(3 wells)] + (1.50 + 2.00)
= 6.46' NGVD
3. FDOT 100 Year - 1 Hour Storm
= (9.36 cfs)[(700 gpm)(0.002228 cfs/gpm)(3 wells)] + (1.50 + 2.00)
= 5.50' NGVD
•
•
•
TABLE 2
OPUS
ANTICIPATED AVERAGE DAILY FLOW
OF WATER AND WASTEWATER
Residential Towers
296 condo units
14 townhouse units
Boutique Hotel
48 rooms
Retail / Restaurant
200 seats
@ 200 gpd/unit = 59,200 gpd
@ 250 gpd/unit — 3,500 gpd
@ 100 gpd/unit — 4,800 gpd
@ 50 gpd/seat = 10,000 gpd
Total = 77,500 gpd
ANTICIPATED AVERAGE DAILY FLOW WASTEWATER
Average Flow _ 0.0775 mgd
Peak Flow — 0.2713 mgd
NOTES:
1. Peak flow uses a factor of 3.75 times average flow (Recommended Standards for Wastewater
Facilities, 1990 Edition)
2. gpd = gallons per day
3. No industrial wastewater is anticipated to be generated
4. mgd = million gallons per day
•
•
•
TABLE 3
OPUS
SOLID WASTE GENERATION
Residential Towers
310 units @ 1.25 cu. yds /month per unit = 387.5 cu. yds./rnonth
Boutique Hotel
48 rooms @ 1.25 cu. yds /month per unit = 60 cu. yds./month
Retail / restaurant
5,765 SF of retail / rest space @ 0.25 cu. yds per 100 SF /month — 14.41 cu. yds/month
Total anticipated Solid Waste generation = 462 Cu. Yds. /month
•
•
•
Pump Station Monthl
Station..30 -0002 Atlas Py..E13
MIAMI DADE WATER & SEWER DEPARTMENT
Addr..925 BISCAYNE BLVD
Sec--Township-Range........ . ...31-53-42
Genr._ ET clock.Y Te1m.Y #Pumps. 5
Pump Type.A Stn Clae .M Speed.R Hr. pwr.
Res flow(gpd)
Plans.. 2,662,990
Plats.. 0
Extens. 0
Prof Napot
5.06 hrs
3.21 h r
3.21 hrs
Cap
50.60
32.10
32.10
Date MO . NAPDT Avg Daily Flow Rgd
08/25/2004 3.38
07/27/2004 2.82
06/25/2004 2.79 11.16 0.00
05/26/2004 2.85 11.40 0.00
04/27/2004 3.17 12.67 0.00
03/29/2004 3.28 13.10 0.00
02/27/2004 3.25 12.98 _ 0.00
Information
torium effective ea.nce / /
<Plan Review
Moratorium..0
Yearly 'APOT hr.........®® 3.21
:n Gr~oee Capaci.ty(gpd) .. 57,600,000
ation Reduction Factor....... 0.60
Stn Net Cap Certif(gpd).. 0
Stn Net Capacity(gpd).... 34,560,000
Indicated Flouis(gpd)..... 4,622,400
Fig Pr p
13.50 0.00 Y 5
11.28 0.00 Y 5
Signature..LEALG
Ready.
Comments
5
Sign Date..03/17/2003 13:52:24.01
•
•
•
WATER ATLAS
(MD-WASD)
NN
N.T5.
•
•
SEWER ATLAS
(MD-WASD)
RICE