SCHOOL IMPACT REVIEW ANALYSIS
December 15, 2004
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT
TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING AN INCREASE IN
RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY PERMITTED IN THE
EXISTING ZONING CLASSIFICATION.
APPLICATION: Ellipse
REQUEST: Major Use Special Permit
EXISTING ZONING: SD-20
ACRES; Approximately 0.50 acre
LOCATION: 1776 Biscayne Blvd., Miami
NUMBER OF
UNITS:
267 units
MSAIMULTIPLIEF: 5.2 = 0.19 Multifamily
ESTIMATED STUDENT
POPULATION: 51 students*
ELEMENTARY: 23
MIDDLE: 13
SENIOR: 15
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY:
MIDDLE:
SENIOR HIGH:
Phillis Wheatley Elementary —1801 NW First PI,
Jose De Diego Middle — 3100 NW 5 Avenue
Booker T. Washington Senior — 1200 NW 6 Avenue
Based on Census 2000 information provided by the Miami -Dade County Department of
Planning and Zoning.
U G' L. Li J L. Ll LJ T 1 L1 . 'T V i II s ..l 1 1 s I—i 1 1 s i s a t e
•
•
•
The following population and facility capacity data are as
Information Technology, as of October 2003.
STUDENT
POPULATON
Phillis Wheatley 379/
Elementary 402*
Jose De Diego 1,322f
Middle 1,335*
Booker T, 1,477i
Washington 1,492'
FISH DESIGN
CAPACITY
PERMANENT
637
1,036
2,624
% UTILIZATION
FISH DESIGN
CAPACITY
PERMANTENT
60 %/
63%*
128%i
129%*
56%/
57%'
reported by the Office of
NUMBER
OF
PORTABLE
STUDENT
STATIONS
0
0
0
* Increased student population as a result of the proposed development
UTILIZATION
FISH DESING
CAPACITY
PERMANENT
AND
RELOCATA9LE
60%f
63%'
128%/
129%"
56%/
57%
Note:
1) The cumulative effect of other approved or proposed developments in the vicinity is
not included as part of this analysis.
2) Figures above reflect the impact of the class size amendment.
3) Pursuant to the lnterlocal Agreement, only Jose De Diego Middle School meets the
review threshold.
ADDITIONAL SCHOOL INFORMATION: The following information was provided by
school site personnel or other data sources in September 2003:
Phillis Wheatley Elementary
Access to computers: In each classroom, special computer labs
and Media Center
Capital Improvements since 1990: None
Recognition for Academic Achievement; M-DCPS School Recognition Silver Award
for exceptional gains in math and writing
Special Programs:
Lunch schedule:
None
Begins at 10:30 a.m. — ends at 12 15 p.m.
Non -instructional space utilized for
Instructional purposes: None
Teachers required to float/travel: None
u e I U J C U U Y S U: FT 0 1-1 I"i
•
•
•
Jose de Diego Middle
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
Booker T. Washington Senior High
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
In each classroom
special computer
Center,
(6h — 8h
labs and
grade),
Media
School Built 1999
None
None
Begins at 11:40 a.m. — ends 1:55 p.m.
Auditorium is used for Social Studies
classes. Cafeteria is used for SCSI.
Room 207 is used for an EH class and it
is a teacher planning room.
Four (Spanish, ESOL, Math and Social
Studies
In each classroom, special computer
labs and Media Center
Conversion to senior high school 2001
None
Enrichment classes and community
classes
10:30 a.m. — 12:30 p.m.
None
None
e U 7 C. 4i 13-r e[ .11 1
•
•
•
PLANNED RELIEF SCHOOLS IN THE AREA (Information as of December 2004):
School
None
Status Occupancy Date
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade
students amounts to $5,833 per student. The total annual operating cost for additional
students residing in this development, if approved, would total $297,483,
CAPITAL COSTS: Based on the States December 2004 student station cost factors*,
capital costs for the estimated additional students to be generated by the proposed
development are:
ELEMENTARY 23 X $13,466 = S309,718
MIDDLE 13 X $15,439 = $200,707
SENIOR 15 X $20,431 = $306,465
Total Potential Capital cost $816,890
*Based on information provided by the Florida Department of Education, Office of
Educational Facilities Budgeting. Cost per student station does not include land cost.