Loading...
HomeMy WebLinkAboutAnalysisAnalysis for Substantial Modification to a Major Use Special Permit for Riverfront East located at approximately 300, 350 and 400 South Miami Avenue, and 15, 24, 25, and 39 SW 3rd Street CASE NO. 2004-095 Pursuant to Ordinance 11000, as amended, the Zoning Ordinance of the City of Miami, Florida, the subject proposal for the Riverfront East project has been reviewed to ap- prove with conditions, a Substantial Modification to a Major Use Special Permit, Resolu- tion No. 03-1235 (Miami River Village), per Articles 13, 17 and 22 of Zoning Ordinance 11000, as amended, for the Riverfront East project, located at approximately 300, 350 and 400 South Miami Avenue, and 15, 24, 25, and 39 SW 3rd Street , Miami, Florida, to allow the following changes to the original application: The increase of residential units from 1,304 to approximately 1,424 units; and the decrease of the area of non-residential uses from 101,157 square feet to approximately 94,794 square feet. Current application will consist of three mixed use structures varying in height from 498 to 602 feet and to be comprised of approximately 1,424 total multifamily residential units with recreational amenities, approximately 52,800 square feet of office space, approximately 41,994 square feet of retail space, and approximately 1,671 total parking spaces. This Permit also includes the following requests: MUSP, per Article 17, Section 1701, to permit individual phase of multi phase project; SUBSTANTIAL MODIFICATION TO A MAJOR USE SPECIAL PERMIT, per Article 17, Section 1701, and Article 22 of City of Miami Zoning Ordinance 11000, as amended, to allow the following changes (substantial modification to previously approved Resolution No. 03-1235) by increasing the residential units from 1,304 to 1,424 units, and decreasing non-residential uses from 101,157 square feet to 94,794 square feet; Including all of the previously approved special permits under the original MUSP; MUSP, per Article 17, Section 1701, to permit residential in excess of two hundred (200) dwelling units, with proposed 1,424 units; MUSP, as per City of Miami Zoning Ordinance 11000 as amended, Article 17 for development to provide parking in excess of 500 spaces or more with proposed 1,671 parking spaces; CLASS 11 SPECIAL PERMIT, as per Article 6, Section 606.3.1, to permit new construction in the SD-6 Zoning District; CLASS II SPECIAL PERMIT, as per Article 6, for signage approval; CLASS 11 SPECIAL PERMIT, as per Article 6, Section 606.3.1, for temporary construction fence and covered walkway; CLASS II SPECIAL PERMIT, as per Article 9, Section 922.1 and 923.2, a request to reduce five of the required nine loading berths from 12 x 55 to five 12 x 35; CLASS I SPECIAL PERMIT, as per Article 9, Section 906.9, to allow for a special event namely a ground breaking ceremony; CLASS I SPECIAL PERMIT, as per Article 9, Section 918.2, for parking and staging of construction during construction; Page 1 of 6 CLASS I SPECIAL PERMIT, as per Article 10, Section 10.3.2.2, to allow development/construction/rental signage; CLASS I SPECIAL PERMIT, as per Article 9, Section 920.1, to allow a construction trailer and watchman's quarters; CLASS I SPECIAL PERMIT, as per Article 9, Section 920.1.2, to allow a temporary sales office trailer; REQUEST for applicable MUSP conditions to be required at the time of shell permit instead of at issuance of foundation permit; a. The requirement to provide a letter of assurance for the Solid Waste Department; and b. The requirement to record in the Public Records a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association; and c. The requirement to record in the Public Records a unity of title or covenant in lieu of unity of title. Per City Code, Chapter 36, Construction Equipment Request for waiver of noise ordinance while under construction for continuous pours. Pursuant to Articles 13, 17 and 22 of Zoning Ordinance 11000, approval of the requested Substantial Modification to a Major Use Special Permit shall be considered sufficient for the subordinate permits requested and referenced above as well as any other special approvals required by the City which may be required to carry out the requested plans. In determining the appropriateness of the proposed project, the Planning and Zoning Department has referred this project to the Large Scale Development Committee (LSDC) and the Planning & Zoning's Internal Design Review Committee for additional input and recommendations; the following findings have been made: • It is found that the City Commission approved Resolution No. 03-1235 on December 18, 2003 for the Master Development Program for the project formerly known as Miami River Village located at approximately 300, 312, 316, 330, 340, 350 South Miami Avenue, 18, 30, 40, 44, 50, 62, S.W. 3rd Street, and 15, 24, 25, 39 S.W. 4th Street. • It is found that the proposed development project will benefit the area by creating additional residential opportunities in the Downtown NET District, located at the SW corner of South Miami Avenue and SW 3`d Street. • It is found that the subject property is located in the "Miami Steam Electric Station Property, Thatcher Enterprises Property, North City of Miami, and A.L. Knowlton's" Plats within the Riverfront neighborhood of the City. Page 2 of 6 • It is found that the existing zoning designation for the property pursuant to the Zoning Ordinance of the City of Miami, Florida is the SD-6 "Central Commercial Residential" Zoning District. • It is found that the proposed densities of the project are 206 units per acre (500 units maximum) on the 6.91± net acre site. • It is found that the garage pedestals for all three structures are the same height, assuring that no residential unit will view a parking garage directly opposite the unit. • It is found that the project has convenient access to the Metromover system at the Third Street Station, located northeast of the subject property, with connections to the Metrorail system, for efficient use of existing mass transit systems. • It is found that the proposed project was reviewed under the prior Miami River Village application by the Historic and Environmental Preservation Board (HEPB) on December 16, 2003, which approved (HEPB 2003-89) a Certificate of Appropriateness for ground disturbing activity involving new construction within an Archaeological Conservation Area subject to the following conditions: (1) Archeological monitoring shall be provided in accordance with recommendations set forth in the archeological management plan submitted by Robert S. Carr, dated February 2000, revised November 2003; (2) Additional testing in the north end of Parcel I shall be conducted after the parking lot use ceases, as recommended by Mr. Carr. • It is found that the proposed project was reviewed by the Design Review Committee on June 1, 2004, and the following pertinent comments were made: (1) The committee finds the site planning for the project to be acceptable, as SW 3rd St., S Miami Ave., the Miami River and the main access road for the project are Tined for the most part with habitable residential or commercial spaces. The creation of the alleyway parallel to the Metrorail line on the western edge of the site is a good solution to enable service access to be relegated to that part of the site; (2) The placement of the towers appears to be appropriate, as they are provided with adequate separation due to the variety of their orientations, which will create an interesting skyline while providing good view corridors for the units; (3) The committee is concerned about the placements of the Phase IV tower and the Phase III Tower directly across the street, The proposed Phase IV Tower rises 300' along the SW 3rd St. setback line, and the Phase III Tower measures 434' along the SW 3rd St. setback line across the street. This condition will produce a negative effect on the street, and block natural light from entering the units in each building; (4) Provide additional landscaping along the Miami River, utilizing shade trees in order to provide adequate shade for pedestrians. Refer to the City of Miami Design Standards and Guidelines for the Riverwalk/Baywalk areas for more specific information; (5) Please provide a tree survey and tree disposition plan in the next project submittal. Consider maintaining the existing large street trees along SW 3rd St.; (6) If habitable space cannot be provided lining the garage of the Phase IV building, it is critical to provide a well -designed facade concealing the garage portion of the building along SW 3rd St. Consider the use of glass to cover the openings of the garage, possibly continuing the pattern of window openings from the rest of the facade on this area, or create an artistic treatment for the garage elevation; (7) Provide details and material samples of the metal louvers proposed to cover the garage openings along the west side of the property, indicating how the parked cars Page 3 of 6 are hidden from view; (8) It is critical that the applicant meet with Mary Conway, Transportation Director for the City of Miami regarding traffic circulation and access to the site. She may be contacted at 305-416-1027; (9) Due to the large density of the project, consider incorporating connections to various forms of transit as part of the proposal, including a possible Metrorail connection to a new Metrorail station at the site, and a water taxi landing along the Miami River. The Planning and Zoning Department's review resulted in design modifications that were then recommended for approval to the Planning and Zoning Director. • It is found that Miami -Dade Public Schools provided a revised review of the proposed project on October 28, 2004. The student population generated by this development is estimated at 271 students. The schools serving this area of application are Frederick Douglas Elementary - 68°/0 Florida Inventory School Houses (FISH) Capacity with the proposed project; Riverside Elementary — 149%, Jose De Diego Middle -- 134% FISH, and Booker T. Washington Senior High - 59% FISH. Pursuant to the interlocal agreement, Riverside Elementary School and Jose de Diego Middle School meet the review threshold of 115%. • It is found that the Large Scale Development Committee reviewed the project on July 27, 2004 to address the expressed technical concerns raised at said Large Scale Development Committee meeting. • It is found that the proposed project was reviewed by the Miami River Commission on September 13, 2004, which recommended approval. • It is found that the proposed project was reviewed for design appropriateness by the Urban Development Review Board on September 15, 2004, which recommended approval (UDRB Reso. 9-15-04-5) with the following conditions: Re -work the pedestal connections that are currently shown above roadways, driveways and pathways; Consider the treatment of the towers so that they are expressed at the ground plane and reinforce the importance of the boulevards that provide access to them either vehicular or from a pedestrian standpoint; Re -think the gating of the entrances to some other means of providing security that is not a gated secured area; and Create a grand space along the waters edge or in the boulevard. It is found that on October 4, 2004, the City's Traffic Consultant, URS Corp., provided a Review of the Traffic Impact Analysis submitted by the applicant and has found the traffic analysis sufficient. • It is found that with respect to all additional criteria as specified in Section 1305 of Zoning Ordinance 11000, the proposal has been reviewed and found to be adequate. Based on these findings, the Planning and Zoning Department is recommending approval of the requested Development Project with the following conditions: 1. Meet all applicable building codes, land development regulations, ordinances and other laws and pay all applicable fees due prior to the issuance of a building permit. 2. Allow the Miami Police Department to conduct a security survey, at the option of the Department, and to make recommendations concerning security Page 4 of 6 measures and systems; further submit a report to the Department of Planning and Zoning, prior to commencement of construction, demonstrating how the Police Department recommendations, if any, have been incorporated into the PROJECT security and construction plans, or demonstrate to the Director of the Department of Planning and Zoning why such recommendations are impractical. 3. Obtain approval from, or provide a letter from the Department of Fire -Rescue indicating APPLICANT'S coordination with members of the Fire Plan Review Section at the Department of Fire -Rescue in the review of the scope of the PROJECT, owner responsibility, building development process and review procedures, as well as specific requirements for fire protection and life safety systems, exiting, vehicular access and water supply. 4. Obtain approval from, or provide a letter of assurance from the Department of Solid Waste that the PROJECT has addressed all concerns of the said Department prior to the obtainment of a shell permit. 5. Comply with the Minority Participation and Employment Plan (including a Contractor/Subcontractor Participation Plan) submitted to the City as part of the Application for Development Approval, with the understanding that the APPLICANT must use its best efforts to follow the provisions of the City's Minority/Women Business Affairs and Procurement Program as a guide. 6. Record the following in the Public Records of Dade County, Florida, prior to the issuance of a Temporary Certificate of Occupancy or Certificate of Occupancy, a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association in perpetuity. 7. Prior to the issuance of a shell permit, provide the City with a recorded copy of the MUSP permit resolution and development order, and further, an executed, record able unity of title or covenant in lieu of unity of title agreement for the subject property; said agreement shall be subject to the review and approval of the City Attorney's Office. 8. Provide the Department of Planning and Zoning with a temporary construction plan that includes the following: a temporary construction parking plan, with an enforcement policy; a construction noise management plan with an enforcement policy; and a maintenance plan for the temporary construction site; said plan shall be subject to the review and approval by the Department of Planning and Zoning prior to the issuance of any building permits and shall be enforced during construction activity. All construction activity shall remain in full compliance with the provisions of the submitted construction plan; failure to comply may lead to a suspension or revocation of this Substantial Modification to a Major Use Special Permit. 9. In so far as this Substantial Modification to a Major Use Special Permit in- cludes the subordinate approval of a series of Class I Special Permits for which specific details have not yet been developed or provided, the applicant shall provide the Department of Planning and Zoning with all subordinate Class I Special Permit plans and detailed requirements for final review and approval of each one prior to the issuance of any of the subordinate approvals required in Page 5 of 6 order to carry out any of the requested activities and/or improvements listed in this development order or captioned in the plans approved by it. 10. If the project is to be developed in phases, the Applicant shall submit an interim plan, including a landscape plan, which addresses design details for the land occupying future phases of this Project in the event that the future phases are not developed, said plan shall include a proposed timetable and shall be sub- ject to review and approval by the Director of Planning and Zoning. 11. Pursuant to the review of the Design Review Committee, the applicant shall meet the following conditions: (a) the applicant shall provide additional land- scaping along the Miami River, utilizing shade trees in order to provide ade- quate shade for pedestrians. Refer to the City of Miami Design Standards and Guidelines for the RiverwalklBaywalk areas for more specific information; (b) the applicant shall provide a tree survey and tree disposition plan in the next project submittal and shall maintain the existing large street trees along SW 3rd St.; (c) If habitable space cannot be provided lining the garage of the Phase IV building, the applicant shall provide a well -designed facade concealing the ga- rage portion of the building along SW 3`d Street and shall consider the use of glass to cover the openings of the garage, possibly continuing the pattern of window openings from the rest of the facade on this area, or create an artistic treatment for the garage elevation; (d) the applicant shall provide details and material samples of the metal louvers proposed to cover the garage openings along the west side of the property, indicating how the parked cars are hidden from view; (e) the applicant shall meet with the City of Miami Transportation Of- fice regarding traffic circulation and access to the site. (f) Due to the large den- sity of the project, the applicant shall consider incorporating connections to various forms of transit as part of the proposal, including a possible Metrorail connection to a new Metrorail station at the site, and a water taxi landing along the Miami River. 12. Pursuant to HEPB Resolution 2003-89, the applicant shall meet the following conditions: (a) Archeological monitoring shall be provided in accordance with recommendations set forth in the archeological management plan submitted by Robert S. Carr, dated February 2000, revised November 2003; (b) Additional testing in the north end of Parcel I shall be conducted after the parking lot use ceases, as recommended by Mr. Carr. 13. Pursuant to UDRB Resolution 9-15-04-5, the applicant shall meet the following conditions: (a) Re -work the pedestal connections that are currently shown above roadways, driveways and pathways; (b) Consider the treatment of the towers so that they are expressed at the ground plane and reinforce the importance of the boulevards that provide access to them either vehicular or from a pedestrian standpoint; (c) Re -think the gating of the entrances to some other means of providing security that is not a gated secured area; and (d) Create a grand space along the waters edge or in the boulevard. 14. Within 90 days of the effective date of this Development Order, record a certi- fied copy of the Development Order specifying that the Development Order runs with the land and is binding on the Applicant, its successors, and assigns, jointly or severally. Page 6 of 6