Loading...
HomeMy WebLinkAboutexhibit8COMM1SION CHAMBERS LIGHTING AND SOUND IMPROVEMENTS 3500 Pan American Drive Miami, Florida 33133 Project No. 02-3162 R.J. Heisenbottle Architects, P.A. 340 Minorca Avenue, Suite 10 Coral Gables, FL 33134 Phone: (305) 446-7799 Fax: (305) 446-9275 ADDENDUM "No. 2" July 12, 2002 The following Amendments to the Specifications and Drawings are now in effect and are to be complied with as a part of the original Contract Documents on the project. Drawings and Specifications not specifically mentioned in this Addendum are not altered by any changes, amendments, deletions or additions. SPECIFICATIONS ISSUED WITH THIS ADDENDUM: DOCUMENT 00030 — INVITATION FOR BIDS DOCUMENT 00120 — PROPOSAL SECTION 01023 — CONTINGENCY ALLOWANCE REVISIONS TO SPECIFICATIONS: DOCUMENT 00030 — INVITATION FOR BIDS: Delete in its entirety the original "Document 00030 — Invitation for Bids" and insert new "Document 00030 — Invitation for Bids". DOCUMENT 00120 — SUPPLEMENTARY INSTRUCTIONS TO BIDDERS: Insert the following paragraph prior to ARTICLE 1 DEFINITIONS: "The following supplements modify, change, delete from or add to "The Instructions to Bidders", A.I.A. Document A701, 15th edition (1997 Edition). Where any Article of the Instructions to Bidders is_ modified or any Paragraph, Subparagraph or Clause thereof is modified or deleted by these Supplementary Instructions to Bidders, the unaltered provisions of that Article, Paragraph, Subparagraph or Clause shall remain in effect. Delete in its entirety the original "Document 00120 — Supplementary Instructions to Bidders" and insert new "Document 00120 — Supplementary Instructions to Bidders"." DOCUMENT 00120 —PROPOSAL: Delete in its entirety the original "Document 00120 — Proposal" and insert new "Document 00120 — Proposal". ('1'I'1 OI' \111\II I'rojrct No. 112 3162 (CO\l \1IS 1ON ('H;1 N11iEltti .•1I)I)I•:N1)lu\1 #2 I.IGHI'i'IN(, ,\N1) SCRIM) I\II'RO\ I;\II:NTs 7/24/112 1 ill \fi;rnn. 1:I(rriLia 3 '13.3 Insert "Section 01023 — Contingency Allowance". • REVISION TO DRAWINGS: None DRAWINGS ISSUED WITH THIS ADDENDUM: None CLARIFICATIONS: 1. Responsibility of Electric Subcontractor: Furnishing supervision, scheduling, coordination and related general condition items for installation of Theatrical Lighting and Dimming Systems equipment and Sound Systems equipment was bid to the City of Miami for purchasing and installation of the purchased equipment and is being assigned to the General Contractor for administrating the installation phase of the work. The General Contractor shall provide other electrical work in connection with the purchased Theatrical Lighting and Dimming Systems and Sound Systems equipment indicated in the drawings and specifications. 2. Assignment of Work - Lighting and Dimming Systems: Miami Stagecraft, Inc. - $52,585.00 3, Assignment of Work — Sound Systems: MAVCO, Inc. - $53,455.82 4. Standard Contract Documents and Specification: Contractor's attention is called to the City of Miami, Department of Public Works' letter "TO ALL BIDDERS" on the first page of this Project Manual. The letter requires that the Contractor acquire a set of "STANDARD CONTRACT DOCUMENTS AND SPECIFICATIONS FOR PUBLIC WORKS PROJECTS" (Revised October 2001) when preparing a bid or performing actual work. 5. Liquidated Damages: Contractor shall refer to "Standard Contract Documents and Specifications for Public Works, Division 1, Section 6-9 — FAILURE TO COMPLETE THE WORK ON TIME, for the amount of liquidated Damages per day. 6. Permits: All City of Miami building permits fees pursuant to Ordinance No.11795, have been waived for this Project B-3285. A copy of Building Department — Public Works Department Memo of June 20, 2002, is enclosed with this Addendum. 7. Asbestos Report: "Bulk Sample Analysis Report" provided to the City by ATC and HYGEIA Laboratories, Inc., indicating "None Detected" analysis of the acoustic ceiling tile and mastic on the Second Floor ceiling, is enclosed with this Addendum. ('I'I'1 or h11.111I Project No. 112 3162 ('O1I11ISION CI I N1BERS AI)IWNI)l1rtl tf2 1.1(;II"I'INt; AND SOUND 1111'11O1.I•:111•;;N'I S 7/24/02 I)risL' Pop.. 2 or 3 \1i.1nit.l ltnulu ;.:I?.; 8. Lighting and Dimming Systems Control Wiring: Technical specification Section 11063 — STUDIO LIGHTING AND D[MMING, PART 1 — GENERAL, 1.3 WORK INCLUDED, Subparagraph "F', states, "The Contractor (Miami Stagecraft, Inc.) shall provide, install and terminate all system control wires." 9. Remote HID Dimming Ballasts: Remote HID dimming ballasts and emergency batteries serving Commission Chambers' "house" lighting fixtures are located in the "New Dimmer/Electric Room". Refer to Sheet E.03. 10. New Mechanical Requirements: Refer to Sheet E.03 for new mechanical requirements for the "New Dimmer/Electric Room". 11. COW Room Lighting: Contractor shall furnish and install the following COW Room ceiling Tight fixtures in locations as directed by Owner: Two (2) — T-Series Model Prefix "T4/45" ("front light") and one (1) - T-Series Model Prefix "T040" ("back light") as manufactured by brightline, 33-4 McGovern Boulevard, Crescent, PA 15046, Phone: 724.457.0717, Fax: 724.457.2247. All fixtures shall be non -dimming, rotating type, operating voltage by Facility, lamp type by Owner, fixture color — white. 12. Cutting and Patching: Contractor shall exercise extreme care when demolishing or removing items in building so as to cause the least amount of patchwork and repair. Existing finishes and other materials to remain, that are damaged by the Contractor during the demolition and removal process, shall be repaired or replaced at no additional cost to the Owner. Contractor shall anticipate cutting and patching existing columns, wails, and ceiling areas, as maybe required to affect the hidden installation of all new lighting and sound equipment service conduit, junction boxes, and related equipment. 13. Plaster Repair: Following the demolition and removal of existing acoustical ceiling tiles and mastic material, Contractor shall anticipate the provision of a plaster skim coat applied to the coffered ceiling areas to facilitate proper installation of muslin canvas ceiling panels. END OF ADENDUM #2 - July 12, 2002 N11:11111 Pridt.c•t No. 02 3162 ('O131IISIO\ ('I11;11I4E1(S AI)I)ENI)lJM #2 Li(;ii I'I^G AND SOt'NI) I!111'Il1)VI:NII•:vI'ti 7/24/1)2 !'.111-1mrri,..di1 I )rit 1)1 ir, nil i RII ILi:l :. l