Introduction
Urbanea is a proposed mixed -use development to be located at on a 0.76 acre property at
1600 Douglas Road, in the City of Miami, Miami -Dade County, Florida (see Site
Location Map -Fig 1). Currently, a strip mall exists on the center of the subject property.
For the purposes of this development, all existing structures will be demolished. The
Urbanea project includes a residential tower with ground floor retail, constructed on a
parking garage structure It will consist of approximately 100 residential condominium
apartments units, 6,516 S.F of retail and approximately 202 parking spaces. Table 1,
below depicts the details of the proposed project.
Table 1:
Project Summary
Occupancy
Units
Floor Area
(st)
Retail
-
6,516
Residential
100
90,594
Total
-
97,110
Parking
202
95,276
I. Drainage
Existing Drainage
There are two existing drainage inlets visible within the property to serve the existing
strip mall. These inlets most likely connect to an onsite drainage system consisting of
Urbanea
Site Utility Study
Page 2
•
•
either drainage wells and/or French drain. Construction of the proposed development will
require that the existing storm water management system be demolished.
Figure 1:
Site Location Map
'ANT, LLA 'v
S DONiA AV
SALAMANCA `A`J
E.NOFr S AVL
ME_NJOZA AV
ZAM0RA AV PBnP_OSED SW8
PROJECT
MADE2A V...-
1
Urbanea
Site Utility Study
1, 81-H S
S`dt1 84
H: ST
Page 3
•
•
•
Proposed Drainage System
The drainage system for the proposed development will consist of drainage wells and
exfiltration trench, if possible, to facilitate on -site disposal of storm water runoff. The 5-
year design storm event will be used to design the storm water management system, in
accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County
Public Works Manual.
Based on preliminary calculations, it is anticipated that three (3) 24" drainage wells will
provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff
generated by the proposed development. Preliminary drainage computations for the
project areas are provided in Attachment "A" Preliminary Drainage Well Calculations,
which includes the basis for design.
The final drainage design for the project should be in conformance with the requirements
of the Miami -Dade County DERM Water Control Section, Florida Department of
Environmental Protection, and other local, State and federal regulatory agencies having
jurisdiction over the project.
II. Water Distribution System
The water mains owned and operated by the Miami -Dade Water and Sewer Department
(NIDWASD) in the vicinity of the project are shown in the Table 3.
Urbanea
Site Utility Study
Page 4
•
•
•
Table 3:
Existing Water Mains
Location
Between Water Maims)
Douglas Road
S.W. 15th St. and S.W. 16th St.
16" DJ.
Douglas Road
S.W. 15`h St. and S.W. 16th St.
8" D.I.
S.W. 15t St
Douglas Road and S.W. 36th Ave.
4" D.1.
S.W. 16`h St.
Douglas Road and S.W. 36th Ave.
8" D.I.
Per the MDWASD Water Atlas Sheet, a 16-inch water main, which has yet to be
conveyed to MDWASD forces, fronts the property along Douglas Road. In accordance with
Miami -Dade Water and Sewer Department (MDWASD) criteria, the developer may be
required to construct a new 12-inch ductile iron (DI) water main along the frontage of the
property either on SW 15th St or SW 16th normally requires. A final determination of the
points of connection and requirements will not be provided by MDWASD until a Water
and Sewer Agreement is requested by the owner. Water service meters will be installed
by MDWASD forces at owner's expense. Service lines for domestic water, fire sprinkler
systems and irrigation could be connected to the on -site water distribution system. Water
service meters would need to be purchased and installed by MDWASD forces.
See Attachment "B" for a copy of the MDWASD water atlas sheet for the project area.
III. Sanitary Sewer Collection System
Table 4 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and
Sewer Department (MDWASD), within the vicinity of the project.
Urbanea
Site Utility Study
Page 5
•
•
Table 4:
Existing Sanitary Sewer Mains
Location
Between Sanitary Sewer Main(s)
S.W. 151 St.
Douglas Road and S.W. 36th Ave.
8" Gravity Main
S.W. 16th St. Douglas Road and S.W. 36th Ave.
10" Gravity Main
The proposed on -site sanitary sewer system for the property can be connected to the either
of the existing mains abutting the property. However, connecting to the existing 10-inch
mains is preferable, provided that they have the capacity to handle existing flows plus the
additional flows contributed by the proposed project. A letter of availability and further
coordination with MDWASD is recommended to verify the proposed sanitary sewer
service connection points and requirements for this project. MDWASD may require
upgrades to the sanitary sewer system, but this can not be determined without a request
for a water and sewer agreement. A copy of the MDWASD Sewer Atlas sheet has been
attached (See Attachment B).
The flows from the existing MDWASD sanitary sewage mains on SW 15th Street and
SW 16th Street are received by MDWASD Regional Pump Station #152. As of April 06,
2004, this pump station is operating over capacity as established by the USEPA and is
currently under a moratorium (see Attachment "C" Pump Station Monthly Information).
Improvements to the existing regional pumping and/or transmission systems may be
required to connect the proposed project. However, a final deteiinination regarding the
status of the existing transmission system and the need for possible improvements will
not be made until construction plans are submitted to the Miami -Dade County DERM
Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued.
The flows created by this project have been determined and are shown in Table 5.
Urbanea
Site Utility Study Page 6
•
Table 5:
Water & Sewer Flow Generation
Type of
Occupancy
Apartment
Retail
Quantity Usage rate
100 units
200 gpd per unit
Total
Average
Daily Flow
(gpd)
20,000
6,516 sf j 5 gpd per 100sf
Total Anticipated Flow
326
20,326 gpd
IV. Solid Waste Generation
Solid waste generated by this project will be collected in standard on -site containers for
refuse and recyclables. Regular pick-up service will be provided either by private hauling
companies and/or by the City of Miami Solid Waste Department, who will transport the
waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of
solid waste projected to be generated by the project are shown in Table 6.
Urbanea
Site Utility Study
Table 6:
Solid Waste Generation
Type of
Occupancy
Phase I
Quantity
Usage Rate
'total Solid
Waste
Generated
(Tons/Day)
0.250
Apartment
100 units
5lbs/unit/day
Retail
6,516 sf
6lbs/1000 sf/day
0.020
Total Anticipated Solid Waste Generated
0.270
Page 7
•
•
Urbanea
Site Utility Study
Attachment A
Preliminary Drainage Well Calculations
Page 8
URBANEA
City of Miami, Florida
410
•
DRAINAGE CALCULATIONS:
DRAINAGE WELLS
(MASS DIAGRAM - DERM CRITERIA)
1. Site Data:
A. Average October Water Table Elevation =
B. County Flood Criteria Elevation =
C. F.I.R.M. Base Flood Elevation =
D. Average Crown Elevation =
E. Average Existing Onsite Grade Elevation =
-'F. Proposed drainage inlet grate elevation =
3.00 NGVD
7.00 NGVD (County Flood Criteria Map, see Appendix A)
N/A Zone X (Map No. 12025C01 831, see. Appendix A)
8.27 NGVD
8..15 NGVD
7.50 NGVD
2. Total Contributing Drainage Area (A): 0.92 Acres
A. Impervious Areas:
a) Asphalt and concrete pavement =
b) Roof areas + 1/3 NE building corner =
0.12 Acres
0,67 Acres
Total Impervious Area (Al) = 0.79 Acres (86%)
B. Pervious areas:
a) Green Areas = 0.13 Acres (14%)
3. Weighted Runoff Coefficient (C):
Runoff Coefficient Impervious (CI) "--
Runoff Coefficient Pervious (C2) _
C = [(Al x C1) + (A2 x C2)] / A;
C x A = Total Contributing Area;
C=
CxA=
0.9(0
0.30
0.82
0.75 Acres
4. Time required to generate one inch of runoff (per DERM Water Control Section D-4)
Rainfall Intensity (I) = 308.5 / [(48.6 x F°11) + t (0.5895 + F-26)
Frequency (F) = years - Frequency Curve
Q = CIA, V = Qt; Vll = Qt(1 gin.), to ) = Time to generate 1 inch of runoff
V(1 in.) = CIAt(1 .)
1" x A = CIAt(I h.)
Solving for to in.), t( > = 1" / (IC)
Time to Generate one inch of run-off t(in)
Time to reach the inlet (tc.)
Total Time required to generate 1 in of runoff:
= 12.49 Min.
= 10.00 Min.
= 22.49 Min.
DRAINAGE WELLS
BA81 N
•
•
•
5. Cumulative Runoff (Inflow Mass Diagram)
Time
CxA
(acres)
1
inches)
Q
(CIS)
Accurnuiated
Storm
Runoff
(CI')
{Ivlin.)
(See.)
8
480
0.750
6.405
4.80
2,306
10
600
0.750
6.166
4.62
2,775
15
900
0.750
5.641
4.23
3,808
22.49
1349
0.750
5.003
3.75
5,063
30
1800
0.750
4.493
3.37
6,066
40
2400
0.750
3.956
2.97
7,122
50
3000
0.750
3.534
2.65
7,952
60
3600
0.750
3.193
2.40
8,622
90
5400
0.750
2.477
1.86
10,032
120
7200
0.750
2.023
1.52
10,924
180
10800
0.750
1.480
1.11
11,992
6. Drainage Well Design Discharge Rate:
Based on well discharge rate of:
450 GPMfft. Head
�Lowest
Well
No.
inlet
Rim Elev.
(NGVD)
Oct. Water
Table elev.
(NGVD)
fleadtoss due
to Higher SC
of Salt Water
(ft.)
Head Acting
on Well (ft_)
Well Discharge
Rate (CFS)
Well Structure Dimensions
Well Structure
Storage Volume
(CF)
Width (i$.j
Length (ft. )
DW-1
7.50
3.00
1.60
2.90
2.91
4.0
6.0
69.6
DW-2
7.50
3.00
1.60
2.90
2.91
4.0
6.0
69.6
DW-3
7.50
3.00
1.60
2.90
2.91
4.0
6.0
69.6
Well Discharge Rate (CFS) I 8.
7. Detention Time:
otal Storage tLF) 208.
The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge.
Qd = Design Runoff Rate (CFS) =
Vd = Detention Volume (CF) = Qd x 90 sec. =
Vdt = Detention Volume Per Well (CF) =
W = Width of Well Structure (ft.) =
L = Length of Well Structure (ft.) =
3.75 CFS
337.70 CF
112.57 CF
4.0 ft.
6.0 ft.
H,,,;, . is the minimum depth required from the top of well casing to the tloor of the well box to achieve 90 second detention time:
11„ir, (ft.) = Vdl 1( W x L) = 4.70 ft.
Top of Well Casing Elev. = 5.50
Elevation at Floor of Well Box (NGVD) _ Top of Well Casing Elev. - H,„;,, = 0.80
•
8. Excess storm water runoff excluding well structure storage:
Time
Well
Discharge
Rate
(CFS)
Accumulated
Well
Discharge
Volume
(Cis
Accumulated .
Storm Runoff
.CF)
1 otai Overflow i
Volume
ti"1`')
4Sec.)
8
480
8.72
4,/87
2,306
-1,881
10
600
8.72
5,234
2,775
-2,459
15
900
8.72
7,851
3,808
-4,043
22.49
1,349.33
8.72
11,771
5,063
-6,708
30
1800
8.72
15,702
6,066
-9,636
40
2400
8.72
20,936
7,122
-13,814
50
3000
8.72
26,170
7,952
-18,218
60
3600
8.72
31,404
8,622
-22,781
.90
5400
8.72
47,106
10,032
-37,074
120
7200
8.72
62,807
10,924
-51,883
180
10800
8.72
94,211
11,992
-82,220
9. Excess storm water runoff including well structure storage:
Safety Factor
Time
Accumulated
Storm Runoff
t.CF)
Storage in
Well
Structure
(CT'
Accumulated
Well
Discharge
Volume
(CF)
Total Overflow
Volume
iCF)
(Min.)
(Sec.)
8
480
2,306
209
4,187
-2,090.21
10
600
2,775
209
5,234
-2,667.89
15
900
3,808
209
7,851
-4,251.93
22.49
1,349.33
5,063
209
11,771
-6,916.31
30
1800
6,066
209
15,702
-9,844,86
40
2400
7,122
209
20,936
-14,023.06
50
3000
7,952
209
26,170
-18,426.58
60
3600
8,622
209
31,404
-22,990.25
90
5400
10,032
209
47,106
-37,282.83
120
7200
10,924
209
62,807
-52,091.92
180
10800
11,992
209
94,211
-82,428.45
•
f 2.32%
Safety Factor
2.42%
20
Lincoln Road
Suite 353
Miami Beach, Florida 3313
Phone: 305-673-2025
Fax: 305-673-4882
URBANEA
DOUGLAS RD. B/W SW 15th ST. & SW 16th ST.
LOCATION MAP
•
Kimiey-Hom and Associates, Inc.
420 Lincoln Road
Suite 353
Miami Beach, Florida 33139
Phone: 305--673-2025
Fax: 305-673-4882
URBANEA
SW 37 AVE B/W SW 15 ST. & SW 16 ST.
F.I.R.M. FLOOD INSURANCE
RATE MAP
0.1 am
Kimley-Horn and Associa es, Inc.
4111 pr mis
420 Lincoln Road
Suite 353
Miami Beach, Florida 33139
Phone: 305-673--2025
Fax: 305-673--4882
URBANEA
ALONG SW 37 AVE B/W SW 15 ST. & SW. 16 ST.
FLOOD CRITERIA MAP
Y011 oti IN-rt-Ji';AL ,O-.E,)Ci,.
(E c, T iriL#ice4d)
2. ry W MEAt, SEA s L
or ci-ri
Kimley-Horn and Associates, ,1
420 Lincotn Road
Suite 353
Miami Beach, Florida 33139
Phone: 305-673-2025
Fax: 305-673-4882
URBANEA
ALONG SW 37 AVE BIW SW 15 ST. & SW 16 ST.
AVERAGE OCTOBER GROUND
WATER LEVEL 1960-75
•
Attachment B
Existing Utility Records
•
5.
A AAA
•
4"-
r-6
- 1238
234
7364
6 jpi„j3IVL
-4*
4'
2364 'N
3
.4-
)
j
J
40
-4'
( 7364
\ 3
(7364 \
4
A
7a41
,
1540
1 ,
/ W7
-1
:7362 135,
/
364
4
•
2 .
7 5,2 2
3
"f 757-,
Cfli4F!
iE.H
HORN DADE LAND
U K.13A,ANe
{ ^^
2
992
\ 13
S2
13
"is
330
992
17
223
318
102
2 )
2
3
L
5
(602
17
^ , e
992
20
I 1 7
902
SW 14 ST
--•
eia72
(324 323 329 '
(902 \\''
7
ua
992
20
4w, is al ,
•
1 59
28
10" les
1 3 312
„
5284
314 -
31 315
es
Bran 19*
319 3-09
1in 9
las 11
\ 2 7
„ —
302 30
189 )
25 )
\ /
( 1 BS
10
•
Attachment C
Pump Station Monthly Information
•
•
ApR 6. )604 Pump Station Monthly
Atlas Pg.-715
MIRMI DADE WATER & SEWER DEPARTMENT
Rddr..3215 SW 27 ST
Sec-Township-Range........„..16-54-41
ET clook,Y Telm.N 4Pumps. 3
PType.D Stn Class.L. Speed.1 Mrspwr.4-
Res
Plans..
Plats..
Extens.
flow(gpd)
410,783
0
0
Proj Nepot
5.94 hrs
4.99 hrs
4.99 hrs
% Cap
59.40
49.90
49.90
Date
02/11/2004
01/14/2004
12/10/2003
11/12/2003
10/08/2003
09/10/2003
08/13/2003
Ready.
•
•
Mo.NRPOT Rvg Daily Flaws
3.77
3.93
4.36
5.13
5.74
7.54
7.85
3.76
10.26
11.48
0.00
0.00
0.00
0.00
0.00
5.13 10.26 0.00
4.20 8.39 0.00
Signature..RGUIRRE_G
Information W L',un Revieu
Moratoriom..0
Moratorium effective since 06/19/199E5
Yearly NRPOT (hrs),........... 4,9
Stn Gross Capeoiry(gpC).. 12,240,000
Station Reduction Factor...-. 0.85
Stn Net Cap Cartif(gpd)..
Stn Net Capacitg(gpd),.,. 10,404.000
Indicated Flows(gpd).,... 2,163,155
Rgd # Comments
Fig Pmp
Y 3
Y 3
Y 3
Y 3
Y
Y 3
Y 3
Sign Date..06/19/1996 10:30:00.71