Loading...
HomeMy WebLinkAboutTransportation Comments• • • OFFICE OF PLANNING - DISTRICT SIX 602 SOUTH MIAMI AVENUE, MIAMI, FLORIDA 33130 PHONE: {305) 377-5910 (SC) 452-5910 FAX: (305) 377-5684 (SC) 452-5684 Memorandum From: Karen McGuire, Transportation Planner To: Kevin Walford RE: Bayview Market Date: May 26, 2004 We have reviewed the Traffic Impact Analysis (TIA) for the `Lofts at Mayfair development, submitted by Jackson M. Ahlstedt, P.E. (dated April 2004). The proposed development is located on the west side Virginia Street between Florida Avenue and Oak Avenue in the City of Miami, Florida, and will consist of 98 dwelling units, 6,079 square feet of restaurant, and 110 on -site parking spaces. The estimated site vehicle trip generation is shown in the following table: Trip Type Total Trips Daily 1,178 AM Peak PM Peak 56 105 Internal Capture 0 0 0 a Pass -by 0 0 0 0 Vehicle Occupancy Reduction 0 0 0 0 Transit or Walk 5 -59 -3 -6 Net New External Trips 1,119 53 99 • • The following table is an indication of the intersections analyzed and the existing (2004), future (2006), and future including site (2006) level of service (LOS) values: Intersection 1 2004 Existing 2006 w/o project 2006 with project AM PM AM PM AM PM Virginia Street & Oak Avenue A A A B B B Mary Street & Grand Avenue B B B B B B Mary Street & Oak Avenue E D F E F E Virginia Street &Florida Avenue WB = A, EB=A WB = B, EB=B WB = A, EB=B WB = B, EB=B WB = A, EB=B WB = B, EB=B Virginia Street & Grand Avenue B B B B B B General traffic access to the site will be via a two-way driveway located on Virginia Street. A service driveway is also located on Virginia Street. The analysis concluded that site traffic will have a minimal impact on traffic conditions in 2006, and that no added off -site roadway impacts would be triggered by the project. However, the intersection of Mary Street and Oak Avenue is expected to operate at unacceptable levels of service in 2006, regardless of site traffic. The traffic impact analysis was performed thoroughly, however there are some questions and required clarifications. These are as follows: Comment #I Page 19 — 4.4 Mass Transit Identify the location of existing bus stops along Grand Avenue. Comment #2 Page 22 --- 5.0 Trip Generation A 5% reduction in site traffic due to transit and walk trips is identified. Discuss the proximity of the site to bus stops in the area (Grand Avenue), sidewalk availability, and trip attractions in the area within walking distance. Comment #3 Page 32 — 9.0 Future Traffic Conditions with Project Traffic Identify what improvements at the Mary Street/Oak Avenue intersection are needed to provide an adequate level of service. Given the poor LOS "F" at the Mary Street/Oak Avenue intersection, mitigation should be discussed with the agency responsible for these roads. • Comment #4 Page 41-12.1 Project Driveways Identify the available sight distance at the site driveway on Virginia Street, and identify any deficiencies and required mitigation. We currently find the traffic impact analysis for the 5th Avenue Lofts' development insufficient and require the corrections and clarifications listed above_ •