Loading...
HomeMy WebLinkAboutSite Utility Study• • SOHO MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY Prepared for: Loft Development, Ltd. Prepared by: Bermello, Ajamil & Partners 2601 S Bayshore Drive, Suite 1000 Miami, FL 33133 (305) 859-2050 July 15, 2004 SOHO • SITE UTILITY STUDY • • • DRAINAGE A. Drainage Area The site is located east of Biscayne Blvd., west of Biscayne Bay, approximately located between NE 6th & NE 7tr Avenues, bounded on the north by NE 23r` Terrace and bounded on the south by NE 23rd Street. The site consists of one parcel, consisting of a total property area of ±0.64 acres. After development, approximately 95% of the site will be impervious areas and approximately 5% of the site will remain as pervious areas. The storm water discharge will consist primarily of building roofs, driveways and landscape areas run-off. The coefficient of run-off is arrived at as follows: 0.95 (impervious) x 0.90 +0.05 (pervious) x 0.30 overall coefficient 0.855 0.015 0.87 B. Existing Drainage System The City of Miami presently maintains a roadway drainage system in both adjacent streets. The site is presently vacant. The existing roadway system appears to be of sufficient capacity to handle the present conditions. C. Proposed Drainage System The primary drainage system of this building will consist of drainage wells which will allow the stormwater runoff to be fully contained on -site. No off -site runoff is expected from this building. It is anticipated that two drainage wells will be sufficient to handle the runoff (See Table 1 for drainage calculations). The stormwater will be collected thru a system of catch basin inlets and transported by pipes to the well locations. The wells will allow the stormwater to flow into the Biscayne Aquifer. The wells will be designed to handle the stormwater runoff and tested for capacity as they are installed. Runoff from driving surfaces such as driveways and parking areas will be diverted thru detention structures which will capture the oils and greases prior to flowing into the wells. Page 2 • • • Table 1 Sample Drainage Calculations (Phase 1 only) Runoff Generations 1. Total Area a. Impervious b. Pervious 2. Average Runoff Coefficient 3. Design Storm 4. Time of Concentration 5. Rainfall Intensity 6. Peak Runoff (Q) - C;A 0.64 Acres 95% or 0.95 Acres 5% or 0.05 Acres (.95) (.9) + (.05) (.3) = 0.87 5 years 10.00 min 6.10 in/hr (.87) (6.10) (0.64) = 3.40 CFS Assume each 24" diameter drainage well flows at 750 gpm per foot of head - using 2 feet of head: 2 x 750 gpm = 1,500 gpm per well 1,500 gpm = 3.34 CFS (Peak runoff) (Flow per well) 3.40 CFS 3.34 CFS 1.02 Wells Provide 2 - 24" diameter wells Detention Tank: Providing 11/2 minute detention time of storage in tank. Volume of tank required to handle 1,500 gpm for 1.5 min. 1,500 gpm x 1.5 min = 2,250 gal/tank or 300 ft3 each Provide 2 tanks, each one with the following interior dimensions: 5' (width) x 5' (height) x 12' (length) = 300 ft3 Provide 2 tanks with 300 ft3 volume each Page 3 • • • IL WATER DISTRIBUTION The Miami Dade Water and Sewer Department owns and operates a 6" water main located on NE 23`d Street. This project proposes to design and construct a new 12„ water main extension tying in to an existing 12" water main at NE 4th Avenue and extending it along NE 23rd Street to the east end of the subject property. The water connections to serve the buildings will be done from the proposed 12" water main. The connections will consist of fire line supply, domestic water and irrigation water. No on -site wells are planned for this project. The calculations for anticipated water volumes required for this project are shown below, in Table 2. Table 2 Water Volumes ResidentialApartments 95 units @ 200gpd/unit 19,000 gpd III. SANITARY SEWER The Miami Dade Water and Sewer Department owns and operates a 8" gravity sewer system along NE 23`d Street, fronting the subject property. It is anticipated that multiple gravity sewer laterals connecting to the existing 8" gravity sewer main will be sufficient to serve this project. No pump station will be built on -site to serve the project. Table 3, below, shows the anticipated sewage flow calculations. Table 3 Sewage Flows Average Flow (from Table 2) 19,000 gpd Average Flow 13.19 gpm Peak Flow (13.2 x 3.5) 47 gpm Page 4 • IV. SOLID WASTE GENERATION Solid waste generated by this project will be collected in standardized on -site containers for refuse and recyclables. Regular pick-up service will be provided by either private hauling companies and/or The City of Miami Solid Waste Department, which will transport the waste to Metro -Dade County's Disposal or Recycling facilities. The projected daily volumes of solid waste generation are shown in Table 4, below. • • Table 4 Solid Waste Generation Residential Apartments (95 units @ 1.42 tons/units x 2,000 Ibs/ton)/365 days 740 Ibs Page 5