HomeMy WebLinkAboutSchool Board Comments**UPDATED**
SCHOOL IMPACT REVIEW ANALYSIS
October 20, 2004
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT
TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING AN INCREASE IN
RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY PERMITTED IN THE
EXISTING ZONING CLASSIFICATION,
APPLICATION: Soho
REQUEST; Major Use Special Permit
ZONING: R-4 (Multifamily High -Density Residential) / SD-20 Overlay
(Edgewater Overlay Zoning Districts)
ACRES: 0.64 acre
LOCATION:
NUMBER OF
UNITS:
MSA:
Approximately located between NE 23rd Street and 23rd
Terrace and between NE 6th and 7th Avenue, Miami
95 proposed units (0.64 acre x 150 units/acre = 96
maximum units allowed)
4.7 = 0.22 Multifamily
ESTIMATED STUDENT
POPULATION: 21 students*
ELEMENTARY: 10
MIDDLE: 5
SENIOR: 6
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY: Phillis Wheatley Elementary — 1801 N.W. First Pl.
MIDDLE: Jose de Diego Middle -- 3100 N.W. 5 Avenue
SENIOR HIGH: Booker T. Washington Sr. --1200 N.W. 6 Avenue
*Based on Census 2000 information provided by the Miami -Dade County Department of
Planning and Zoning.
The following population and facility capacity data are as reported by
Information Technology, as of September 2003:
YOPULATON
DESiGN
CAPACITY
PERMANENT
FISH DESIGN
CAPACITY
PERMANTENT
Phillis Wheatley 379/ 59%/
Elementary 389* 637 61 o/ *
Jose De Diego
Middle
Booker T.
Washington Senior
1322/
1036
128%/
1,327* 128%*
1477/
1,483*
2624
56%/
57%*
OF
PORTABLE
STUDENT
STATIONS
0
0
0
* Increased student population as a result of the proposed development
the Office of
% UT L;ZAT ON
FISH DESING
CAPACITY
PERMANENT
AND
RELOCATABLE
59%/
6 1 %*
128%!
128%*
56%I
57%*
Note:
1) The cumulative effect of other approved or proposed developments in the vicinity is
not included as part of this analysis.
2) Figures above reflect the impact of the class size amendment.
3) Pursuant to the Interlocal Agreement, only Jose De Diego Middle School meets the
review threshold.
ADDITIONAL SCHOOL INFORMATION: The following information was provided by
school site personnel or other data sources in September 2003:
Phillis Wheatley Elementary
Access to computers: In each classroom, special computer Tabs
and Media Center
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
None
M-DCPS School Recognition Silver Award
for exceptional gains in math and writing
None
Begins at 10:30 a.m. — ends at 12:15 p.m.
None
None
Jose de Diego Middle
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
Booker T. Washington Senior High
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
In each classroom (6th 8th grade), special
computer labs and Media Center.
New school (1999)
None
None
Begins at 11:40 a.m. — ends 1:55 p.m.
Auditorium is used for Social Studies
classes. Cafeteria is used for SCSI. Room
207 is used for an EH class and it is a
teacher planning room.
Four (Spanish, ESOL, Math and Social
Studies)
In each classroom, special computer labs
and Media Center
Gymnasium and classrooms (converted
from a middle school to a high school in
2001)
None
Enrichment classes and community classes
Begins at 10:30 a.m. — ends at 12:30 p.m.
None
None
PLANNED RELIEF SCHOOLS IN THE AREA (Information as of October 2004):
School Status Occupancy Date
None
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade
students amounts to $5,833 per student. The total annual operating cost for additional
students residing in this development, if approved, would total $122,493.
CAPITAL COSTS: Based on the State's October 2004 student station cost factors*.
capital costs for the estimated additional students to be generated by the proposed
development are:
ELEMENTARY 10 X $13,337 = $133,370
MIDDLE 5 X $15,406 = $ 77,030
SENIOR 6 X $20,387 = $122,322
Total Potential Capital cost $332,722
*Based on Information provided by the Florida Department of Education, Office of
Educational Facilities Budgeting. Cost per student station does not include land cost.