Loading...
HomeMy WebLinkAboutSchool Board Comments**UPDATED** SCHOOL IMPACT REVIEW ANALYSIS October 20, 2004 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING AN INCREASE IN RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY PERMITTED IN THE EXISTING ZONING CLASSIFICATION, APPLICATION: Soho REQUEST; Major Use Special Permit ZONING: R-4 (Multifamily High -Density Residential) / SD-20 Overlay (Edgewater Overlay Zoning Districts) ACRES: 0.64 acre LOCATION: NUMBER OF UNITS: MSA: Approximately located between NE 23rd Street and 23rd Terrace and between NE 6th and 7th Avenue, Miami 95 proposed units (0.64 acre x 150 units/acre = 96 maximum units allowed) 4.7 = 0.22 Multifamily ESTIMATED STUDENT POPULATION: 21 students* ELEMENTARY: 10 MIDDLE: 5 SENIOR: 6 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: Phillis Wheatley Elementary — 1801 N.W. First Pl. MIDDLE: Jose de Diego Middle -- 3100 N.W. 5 Avenue SENIOR HIGH: Booker T. Washington Sr. --1200 N.W. 6 Avenue *Based on Census 2000 information provided by the Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by Information Technology, as of September 2003: YOPULATON DESiGN CAPACITY PERMANENT FISH DESIGN CAPACITY PERMANTENT Phillis Wheatley 379/ 59%/ Elementary 389* 637 61 o/ * Jose De Diego Middle Booker T. Washington Senior 1322/ 1036 128%/ 1,327* 128%* 1477/ 1,483* 2624 56%/ 57%* OF PORTABLE STUDENT STATIONS 0 0 0 * Increased student population as a result of the proposed development the Office of % UT L;ZAT ON FISH DESING CAPACITY PERMANENT AND RELOCATABLE 59%/ 6 1 %* 128%! 128%* 56%I 57%* Note: 1) The cumulative effect of other approved or proposed developments in the vicinity is not included as part of this analysis. 2) Figures above reflect the impact of the class size amendment. 3) Pursuant to the Interlocal Agreement, only Jose De Diego Middle School meets the review threshold. ADDITIONAL SCHOOL INFORMATION: The following information was provided by school site personnel or other data sources in September 2003: Phillis Wheatley Elementary Access to computers: In each classroom, special computer Tabs and Media Center Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for Instructional purposes: Teachers required to float/travel: None M-DCPS School Recognition Silver Award for exceptional gains in math and writing None Begins at 10:30 a.m. — ends at 12:15 p.m. None None Jose de Diego Middle Access to computers: Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for Instructional purposes: Teachers required to float/travel: Booker T. Washington Senior High Access to computers: Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for Instructional purposes: Teachers required to float/travel: In each classroom (6th 8th grade), special computer labs and Media Center. New school (1999) None None Begins at 11:40 a.m. — ends 1:55 p.m. Auditorium is used for Social Studies classes. Cafeteria is used for SCSI. Room 207 is used for an EH class and it is a teacher planning room. Four (Spanish, ESOL, Math and Social Studies) In each classroom, special computer labs and Media Center Gymnasium and classrooms (converted from a middle school to a high school in 2001) None Enrichment classes and community classes Begins at 10:30 a.m. — ends at 12:30 p.m. None None PLANNED RELIEF SCHOOLS IN THE AREA (Information as of October 2004): School Status Occupancy Date None OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $5,833 per student. The total annual operating cost for additional students residing in this development, if approved, would total $122,493. CAPITAL COSTS: Based on the State's October 2004 student station cost factors*. capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 10 X $13,337 = $133,370 MIDDLE 5 X $15,406 = $ 77,030 SENIOR 6 X $20,387 = $122,322 Total Potential Capital cost $332,722 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.