HomeMy WebLinkAboutaddendums123CITY OF MIAMI. BEACH
1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33130
• hpp:Ilcl.mlamhbeach.0.us •
PROCUREMENT DIVISION
INVITATION TO BID
ADDENDUM NO. 1
March 31, 2004
Telephone (305) 573-7450
Facsimile f305) 673.76111
JOB ORDER CONTRACT: ITB 12-03/04 PUBLIC WORKS DEPARTMENI;JOB ORDER
CONTRACT: ITB 13-03/04 CITY WIDE; JOB ORDER CONTRACT: ITB 14-03/04
CAPITAL IMPROVEMENTS PROJECTS is amended as follows:
I. The Mandatory Pre -Bid Conference that was advertised In Volume 1- Project Manual of the
CD has been amended as follows:
• A Mandatory Pre -Bid Conference has been scheduled for 9:30 A.M., April 8th, 2004, at the
City of Miami Beach Convention Center, 4th Floor Executive Offices Conference Room
located at, 1900 Convention Center Drive, Miami Beach, FL 33139. Intending Bidders must
attend the Mandatory Pre -Bid Conference. The Mandatory Pre -Bid Conference is held forthe
purpose of discussing the JOC concept and the•Contract Documents, the City's construction
program, and bid considerations. Bidders must be represented by a person that will be directly
involved preparing the JOC bid and responsible for executing the construction work. Any
Bidder submitting a bid and who was not represented and signed in at the Mandatory Pre Bid
Conference may be deemed non -responsive.
Bidders are required to acknowledge receipt of this Addendum or the bid may
be considered non-rpsoonsive,
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
CITY OF MIAMI 'BEACH
1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33130
http,15c1.m isml.baach.Fl.us
PROCUREMENT DIVISION
INVITATION TO BID
ADDENDUM NO. 2
April 12, 2004
Telephone (305) 873 7490
Facsimile (306) e73-7851
JOB ORDER CONTRACT: ITB 12-03/04 PUBLIC WORKS DEPARTMEN'I;JOBORDLR
CONTRACT: ITB 13-03104 CITY WIDE; JOB ORDER CONTRACT: ITB 14-03/04
CAPITAL IMPROVEMENTS PROJECTS is amended as follows:
I. Clarifications:
1. A bid guaranty is REQUIRED to be submitted with your bid response, and the amounts are
as follows:
ITB 12-03/04 Public Works Department = $25,000
- ITB 13-03/04 - City Wide = $25,000
- ITB 14-03/04 - Capital Improvement Projects - $50,000
2. Correct line 4, of Bid Form 2, to read as follows:
- 4. Multiply Line 3 by .2160 (.90 x.80 x.30)
Attached are amended Bid Form 2, for all three projects, discard originals in the
Project Manual and replace with attached amended pages.
3. Deadline for receipt of questions for all three projects have been changed to 5:00PM
on Thursday, April 15, 2004.
Bidders are required to acknowledge receipt of this Addendum or the bid may
be considered non -responsive.
CITY OF MIAMI BEACH
Gus Lopez, CPPO
Procurement Director
rm
BID FORM 2
COMBINED ADJUSTMENT FACTOR WORKSHEET .
FOR CONTRACT NUMBER ITB 12-03/04 CITYWIDE
For the purposes of determining the low bid the Contractor Shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor
2. Multiply Line 1 by .5040 (.90 x.80 x.70)
3. Normal Working Hours•Construction Adjustment Factor with
Architectural and Engineering Services
4. Multiply Line 3 by .2160 (.90 x.80 x.30)
5. Other Than •Normal Working Hours Construction Adjustment Factor
6. Multiply Line 5 by .1260 (.90 x.20 x.70). '
7. Other Than Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services
8. Multiply line 7 by .0540 (.90 x.20 x.30)
9. Normal 'Working Hours Construction using Davis Bacon Wages
10 Multiply Line 9 by .0560 (.10 x .80 x.70)
11. Normal Working Hours Construction using Davis Bacon Wages with
Architectural and Engineering Services
12 Multiply Line 11 by .0240 (.10 x .80 x.30)
13 Other Than Normal Working 'Hours Construction using Davis Bacon...
14. Multiply line 13 by .0140 (.10 x .20 x.70)
15 Other Than Normal Working Hours Construction using Davis Bacon with
Architectural and Engineering Services
16. Multiply line 15 by .0060 (.10 x .20 x.30)
17. Add lines 2+4+6+8+10+12+14+16
(Combined Adjustment Factor)
BID FORM 2
• COMBINED ADJUSTMENT FACTORWORKSHEET
FOR CONTRACT NUMBER ITB 13.03104 PUBLIC WORKS DEPARTMENT'
For the purposes of determining the' low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor _
2. Multiply Line 1 by .5040 (.90 x.80 x.70)
3. Normal Working Hours Constructioh'Adjustment Factor with
Architectural and EngineeringServices
4. Multiply Line 3 by .2160 (.90 x.80 )00)
5. Other Than Normal Working Hours Construction Adjustment Factor
6. ' Multiply Line 5 by .1260 (.90 x.20 x.70).
7. Other Than 'Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services
8. Multiply line 7 by .0540 (.90 x.20 x.30)
9. Norma! Working Hours Construction using Davis Bacon Wages...,
10 Multiply Line 9 by.0560 (.10 x .80 x.70)
11. Normal Working Hours Construction using Davis BaconWages with
Architectural and Engineering Services
12 Multiply Line 11 by .0240 (.10 x .80 x.30)
13 Other Than Normal Working Hours'Constructlon using Davis Bacon
14. Multiply line 13 by .0140 (.10 x .20 x.70) ....
15 Other Than Normal Working Hours Construction using Davis Bacon with
Architectural and Engineering Services
16. Multiply line 15 by .0060 (.10 x .20 x.30)
17. Add lines 2+4+6+8+10+12+14+16
(Combined Adjustment Factor)
'BID FORM 2
COMBINED ADJUSTMENT FACTOR WORKSHEET
FOR CONTRACT NUMBER !TB 14.03104 CAPITAL IMPROVEMENT
PROJECTS
For the purposes of determining the low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor
2. Multiply Line 1 by .5040 (.90 x.80 x.70)
3. Normal Working Hours Construction Adjustment Factor with
Architectural and Engineering Services •
4. Multiply Line 3 by ,2160 (.90 x.80 x.30)
5. Other Than Normal Working Hours Construction Adjustment Factor
6. Multiply Line 5 by .1260 (.90 x.20 x:70).
7. Other Than Normal Working Hours Construction AdJustrnent Factor
with Architectural and Engineering Services
8. Multiply fine 7 by .0540 (.90 x.20'x.30)
9. Normal Workirg Hours Construction using Davis Bacon Wages
10 Multiply Line 9 by .0560 (.10 x .80 x.70)
11. Normal Working Hours Construction using Davis Bacon Wages with
Architectural and Engineering 'Services
12 Multiply Line 11 by .0240 (.10 x .80 x.30)
13 Other Than Normal Working Hours'Cbnstructlon using Davis Bacon
14. Multiply line '13 by .0140 (.10 x .20 x.70)* •
15 Other Than Normal Working Hours' Construction'using Davis Bacon with
• Architectural and Engineering Services
.16. Multiply line 15 by .0060 (.10 x .20 x.30)
17. Add lines 2+4+5+8+10+12+14+16
(Combined Adjustment Factor)
CITY OF MIAMI BEACH
9700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33130 •
hltp:holm lamLbeach.fl,ua
' PROCUREMENT DIVISION
INVrFATION TO BID
ADDENDUM NO. 3
April 19, 2004
Telephone (905) 673 74s0
Facsimile (305) 5734851
JOB ORDER CONTRACT: ITB 12-03/04 PUBLIC WORKS DEPARTMENT; JOB ORDER
. CONTRACT: ITB 13-03/04 CITY WIDE; JOB ORDER CONTRACT: ITB 14-03/04 CAPITAL
IMPROVEMENTS PROJECTS is amended as follows:
I. Questions and Answers:
Q: On the bid questionnaire it asks, how many years the organization has been in business while
possessing one of the licenses (General Contractor). Our company has been operating since
1997 doing business 'as General Contractors but our current license is dated from 2000 (with a
. different qualifier). Do we meet the minimum requirement as stated in the bid documents which
read?
"Only .General Contractors with a minimum of five (S)' years of General Contracting
construction experience are eligible to submit bids':
A: As long as your company has been in business and licensed as a 'Genera! Contractor for
Jive (5) years, your company meets the above stated minimum requirements.
The invitation to bid, for the mentioned projects, states that the bidder must hold a Florida
Certified General Contractor's License. If the work being performed in ITB 12-03/04 is primarily
for site/civil/utility type projects, why is it necessary for the bidder to hold a valid Florida Certified
General Contractor's License? Will a contractor holding an engineering license be allowed to bid
on the project?
A: A Florida Certified General Contractor's License Ls necessary because of the complexity
and diversity of the protects that will be performed under this contract. A contractor
holding an engineering license will not be allowed to perform under this contract; only
contractors who have a State ofFlorida Cei Lifted General Contractor's License willbe
allowed to perform under this contract.
Pitge 2
. 'Addendum 3
.11. The attached page 136 of the Project Manual has been antended; please
in the Project Manual and replace with attached page.
or et:lab::: PtIge
Bidders are reayired to acknowledge receipt of this Addendum
be considered n9n-resuonsiv91
cal' OF MIAMI BEACH
Gus Lopez CPPO
• Procurement Director