Loading...
HomeMy WebLinkAboutSection5City of Miami, Florida RFP No. 03-04-151 SECTION 5 5.0. INSTRUCTIONS FOR SUBMITTING A RESPONSE Proposal Format Proposals must follow the format prescribed herein and must include the requested information contained in the RFP and in the following downloadable files: ERP-SI Questionnaire http://ci.miami.fl.us/orocurementIERP/ERP-SI Questionnaire.xls ERP Pricing Work Sheet http://ci.miami.fl.us/procurement/ERP/ERPSIPRICE.XLS ERP-SI Functionality Response http://ci.miami.fl.uslprocurement/ERP/ERP-SI Functionality Response.xls. ERP-SI must submit both hard copies and soft copies of their responses as described herein. All electronic and hard copy pages of the proposal must include the ERP-SI's name in either the header or footer. Include a transmittal letter signed by a corporate officer who is an authorized company representative. The transmittal letter should not exceed three pages. The transmittal letter should include a statement that the ERP-SI understands the Scope of Work as previously defined. ERP-SI must also submit a copy of their standard contract with the proposal. Proposals must follow the format prescribed below and must include the requested information for each section, and the enclosed Proposal Response Forms. It is understood that exhibits may be included for financial statements, resumes, etc. Failure to complete and furnish all information requested in the form and format specified may result in disqualification. Statement of Work Using the following outline, please provide a proposed statement of work in your proposal. If subcontractors will be utilized, the Prime ERP-SI must indicate how the subcontractors will be integrated into the proposed approach and project plan. • ProJect Background • Project Scope • Project Organization o Structure (e.g., ERP-SI and City teams) o Staffing (e.g., additional staffing and backfill requirements, etc.) o Roles and Responsibilities (e.g., job description, titles, etc.) o Other Resource Requirements (e.g., site preparation facilities, electrical, work space, etc.) Project Methodology o Phase (e.g., Project Preparation) o Implementation and Task Plans for Project Planning o Deliverables (e.g., Detailed Project Schedule) o Assumptions (e.g., time required of team members) • ProJect Management o Project Meetings (e.g., status meetings —frequency and attendance) o Reports (e.g., status reports —frequency of reports, contents) o Project Issues Resolution (e.g., issues database —description of approach to issue identification, evaluation, resolution, etc.) o Project Management process o Configuration Management o Risk Management o Communication o Change Management • ProJect Change Control Approach • System Acceptance — User Acceptance and Technical Training o Methodology o Document Deliverables Section 5 31 City of Miami, Florida RFP No. 03-04-151 o Application Deliverables (e.g. system acceptance test and approval process) • Project Schedule o Payment Schedule based on deliverables and/or milestones o The City additionally requests that ERP SI provide hourly rates by position • Project Training o Train the trainer training o End -User Training o Training Strategy and Approach Company Information (ERP-SI Questionnaire) ERP-SI must provide background information about their company's financial health, research and development commitment, ability to perform, information on product support, company vision, etc. The ERP-SI must provide this information by completing all questions in this spreadsheet document. Note that if the ERP-SI's proposal includes resources from other companies (subcontractors), additional company information must be completed for each company. Failure to adhere to these requirements shall deem your proposal non -responsive. Once the City short-lists firms for oral presentations, only the ERP-SI and sub- consultant(s) included in the proposal will be allowed to be part of the presentation. Any sub-consultant(s) or partner(s) added to its ERP-SI team after the presentation by the proposer must receive approval by the City. The City reserves the right to approve, disapprove, remove or include any partner(s) or sub- consultant(s) from this project. Contract Related Information (ERP-SI Questionnaire) ERP-SI must provide information regarding contractual guarantees and warranties. The ERP-SI must provide this information by completing all questions in this spreadsheet document. Failure to adhere to these requirements shall deem your proposal non -responsive. References (ERP-SI Questionnaire) ERP-SI must provide up to eight (8) customer references. At least one (1) reference must be a US Local Government client of a similar size and complexity as the City of Miami that has implemented an ERP solution within the last five (5) years. At least one (1) reference must be a client that has implemented Oracle E-Business Suite within the last two (2) years. Note that if the ERP-SI's proposal includes resources from othercompanies (subcontractors), additional references must be completed for each company. In addition to the above, the City requires that ERP-SI provides a list of all its Oracle ERP clients, for the past three (3) years. Failure to adhere to these requirements shall deem your proposal non -responsive. Exceptions Identify any exceptions taken to the RFP. All exceptions must be documented here regardless if they are referred to elsewhere in the proposal. Technical Requirements Response The following responses should be developed using Microsoft Word or PDF and must follow the format detailed below, including section reference numbers. The ERP-SI must provide a background and scope of work section preceding the responses to detailed technical requirements. The City requires that the prime ERP-SI take responsibility for providing project management and implementation services for all selected systems and applications. The prime ERP-SI is expected to guarantee the successful, timely completion of the project. The prime ERP-SI Is responsible and accountable for all contractors it utilizes throughout the life of this project. The City intends to take responsibility for meeting its obligations as defined in an agreed upon project implementation plan. The prime ERP-SI will be required to conform to the City's Project Management standards. Section 5 32 City of Miami, Florida RFP No, 03-04-151 Prolect Schedule 1. The ERP-SI must provide a proposed Project Schedule 2. The Project Schedule shall be represented in a Gantt Chart showing proposed start and end dates or all tasks and subtasks 3. The Project Schedule shall show for each deliverable the time period for City review and comment, the subsequent time period for correction by Contractor prior to final submission and deadline for acceptance of the Final version of the deliverable. 4. The Project Schedule shall provide dates of system migration and City responsibilities and timeframes. The schedule should be based upon the number of months after contract signing and should represent "not to exceed" or guaranteed completion dates. Any contingencies, such as tasks requiring City effort, should be identified. 5. The ERP-SI must describe its method(s) for accurately tracking project progress. Configuration Management: The ERP-SI shall describe the proposed software configuration management activities to be performed during the life cycle of the project. The response shall include the following: 1. The responsibilities and authorities for accomplishing the planned software configuration management activities. 2. Identify the required coordination of software configuration management activities with other activities of the Project and identify the tools and the resources required for the execution of the plan. 3. The methods, procedures and automated software and system tools the ERP-SI will use to track software inventories and site -based hardware and software configurations. Issue Management Issue Management shall be performed with an issues database. Work Standards The ERP-SI shall describe its proposed approach, including specific tools, for the development and maintenance of City specific documentation (e.g. business process maps, business rules). Protect Deliverables The ERP-SI shall describe its internal deliverable review processes for assurance of deliverable quality. In addition to describing the deliverable development process, the ERP-SI shall include all internal checks and reviews performed prior to deliverable submission and indicate the staff responsible at each stage of review. ERP-Sl shall provide a list of deliverables associated with the project by project phase using the table below. Include a description of the deliverable with a suggested table of contents, and when the deliverable will be available. 1,4-11111111 Provide samples for all deliverables that will be produced as part of the integration services proposal. These deliverables should be identified in the Integration Services Costs portion of this document with its respective cost and payment schedule. In addition, the hourly rates per resource must be disclosed. Prolect Organization and Staffing The City anticipates that the ERP-SI will propose a project team composed of the best -qualified staff for the Project. Given the size, scope and complexity of the Project, it is important that the Project be staffed and Section 5 33 City of Miami, Florida RFP No. 03-04-151 organized to work most effectively. The City reserves the right to interview each member of the proposed project team, The ERP-SI shall provide the following information on the proposed project team for the Project, including all Subcontractor staff: 1. Provide name(s) and resume(s) of the individual(s) who would potentially be designated as staff for this project, including roles and responsibilities of each recommended resource. 2. Provide assumptions for estimating the staff resources necessary to meet the needs of the Project, including total number of full time equivalent staff in the various positions proposed, summaries of the number, level and type of staff for each task and subtask in the project work plan. 3. Provide a list of the names, role/positions, responsibilities, onsite hours per month and duration of assignment for each of your personnel that may be assigned to the Project. Person Role/Position ROLirS Per Mo Duration 4. Attach or reference section of resumes showing professional experience and educational qualifications of personnel to be assigned directly to the project team. Indicate the number of years experience with implementing similar systems in large local government implementation and include project references. In addition, use the following table to summarize their qualifications. System Integrator Proposed Role/Position Staff Name Tenure with Years Company I xpei ience (i.e., Years, In Proposed Months) Rote Years Experience With Oracle E- Busi{less Suite and Version Assigned Years Experience With local or State Governm0rrt 5. Describe your plan in maintaining continuity in the composition of the project team. 6. ERP-SI shall not remove and/or change the following key ERP-SI positions without the express written consent of the City Project Manager: a. Project Manager b. Technical Lead c. Functional Lead d. Database Administrator 7. Provide a project organization chart that shows all project staff members, staff assignments and the proposed lines of authority and communication within the proposed project team. The project organizational charts must clearly identify the relationship between ERP-SI and Subcontractor staff. City personnel should be included In the organization chart. 8. Describe the ERP-SI's management structure and the methods to ensure adequate oversight and executive direction for the Project. 9. Identify how the project team will interact with the City project team members. 10. Provide a list of City project team members required to assist in the implementation of the proposed system(s). Include team role, number of people assigned to role type, a brief description of tasks, estimated number of staff hours per role per month, and duration of assignment required. Section 5 34 City of Miami, Florida RFP No. 03-04-151 City Project Team Role Quantity MINIM tasks Duration (weeks, Hours Per Mo, months) 111111111111 11. Describe the skills required and minimum level of experience of the City staff. 12. Describe your proposed approach to knowledge transfer. Risk Management The ERP-SI shall describe its proposed approach to risk management for the Project. The ERP-S1 shall identify significant risks to project success including risks to functionality, performance, schedule and cost, and definitive approaches to mitigate those risks. Prolect Communication The ERP-SI shall describe its proposed approach to project communication for the Project. Change Management The ERP-SI shall provide a detailed description of its proposed approach to change management during implementation. Implementation Methodology/Approach The City of Miami has recently rolled out collaborative workgroup tools in the form of Microsoft Project Server 2002. The selected ERP-SI will be required to create and continuously update a project schedule using Microsoft Project 2002 software for the purpose of resources and reporting to the City's Project Manager. 1. Describe the nature and extent of the services to be provided in this area. 2. Provide a copy of the overview document for this methodology and the process flows supported by the proposer software. 3. Given the information in this document, as well as the ERP-SI's experiences with local government, the ERP-SI should recommend the implementation strategy the City should employ. Include rationale and assumptions. The City would like to evaluate the ERP-SI's understanding of the rollout issues facing the project team. Deployment The ERP-SI shall describe its proposed approach to system deployment. Description should include, but not be limited to, the proposed methods, tools and techniques to facilitate deployment and a process for deployment verification. Oracle E-Buslness Suite Customizations & Interface Development 1. The ERP-SI shall describe its approach to validating the customizations to the Vendor's standard packages to meet the requirements of the City. Customizations will be made only when absolutely necessary. A list of possible customizations is included in Appendix B. 2. Describe the proposed approach to developing any required customization and how the Software Vendor and ERP-SI would be involved. 3. Describe the proposed approach to developing system interfaces. 4. The ERP-SI shall describe the tools used to develop software modifications and interfaces. 5. The ERP-SI shall cite three examples of significant customization around the Oracle E-business Suite's standard package in the Public Sector space. The ERP-SI should identify any assurances provided to the ERP-SI's clients that the code in the examples cited would migrate easily to the next release of the product. Section 5 35 City of Miami, Florida RFP No. 03-04-151 System Security The ERP-SI shall describe its proposed approach to system security, security configuration and security administration. Failure Recovery The ERP-SI shall describe its proposed approach to failure recovery. Disaster Recovery The ERP-SI shall describe its proposed approach to disaster recovery. System Capacity The ERP-SI shall describe its proposed approach to system capacity, including: 1. The process to be utilized to ensure appropriate capacity of all components of the system, including hardware, software and network components. 2. The methodology, tools and type(s) of data required to conduct periodic and ongoing capacity planning. This includes a description of whether the ERP-SI is using automated tools or an established industry standard capacity methodology or model. 3. The content and source(s) of data to be utilized for capacity planning. 4. The proposed approach for data archival based upon the ERP-SI's experience. State the reason for the approach. 5. Past and ongoing experience with capacity planning. The ERP-SI shall describe what lessons have been learned and how such lessons have been applied to the current methodology. System Performance The ERP-SI shall describe its proposed approach to system performance. Approach should address how system performance will be measured throughout the life of the Project, including the proposed methods, tools and techniques for performance measurement. The ERP-SI shall identify any significant performance challenges as relates to batch processing in Oracle E-Business Suite. ERP-SI shall describe its approach to resolving these challenges and maximizing batch processing performance. System Operations The ERP-SI shall describe its proposed approach to system operations. Description should include, but not be limited to, a description of the proposed system operation process that includes implementation, testing and user support. System Maintenance The ERP-SI shall describe its proposed approach to system maintenance. Description should include, but not be limited to, the proposed process for transition to the maintenance phase, problem and modification analysis, modification implementation, maintenance review and acceptance and deployment. Backup and Restore Capabilities The ERP-SI shall describe its proposed approach to Backup and Restore the Oracle E-Business Suite and its related data. The proposal should include the following: 1. Fully describe the backup approach including ERP-SI recommendations, and explain any restrictions on access or system functions during this process. 2. Are all system functions (inquiry and update) available during backup? Explain. 3. Can the system perform incremental backup? 4. Can the system backup specified data or applications (as opposed to complete disk image)? 5. Provide benchmarks for a complete backup of all data. 6. Describe all circumstances under which the system is unavailable to users. 7. Describe if the software and hardware currently owned by the City will be sufficient to support the new Oracle E-Business Suite. Section 5 36 City of Miami, Florida RFP No. 03-04-151 Data Conversion and Archiving The ERP-SI shall provide a detailed description of its proposed approach to data conversion. The City will assist the selected ERP-SI in identifying the automated links and key fields associated 'with the files to be converted. The City will identify the best way to provide data in the most recommended format. The ERP- SI must rearrange the City's data format to match the new DBMS file organization. All associated conversion costs shall be included in Integration Services Costs portion of this document. Testing The ERP-SI shall describe its proposed approach to System Testing. The selected ERP-SI for the Project must anticipate extensive participation in the testing process by representatives from the City. The City will participate in conducting the tests and assessing test results. In addition, complete the table below based on your proposed approach. f-RP Software Systems Integrator Installation/Integration/Testing Services Describe Services Below Application Software flours On -Site Application Software Flours Off -Site Total Installation/Integration/Testing Services Pro.osed The ERP-SI should recommend any automated tool to be used for intensive system testing. Training A train the trainer approach will be used for training of the City's end -users. The City has determined that training will include separate Module -based and Process -based training classes. Module -based training includes all generic training materials and tools related to function level knowledge of Oracle E-Business Suite. Process -based training includes all custom training materials and tools related to functional level knowledge of Oracle E-Business Suite, tailored to meet the City's specific Oracle E-Business Suite configuration and processes. Module -based training will be provided directly by Oracle Corporation. Core project team members will receive module -based training after selection of the ERP-SI. The ERP-SI shall describe its proposed approach to Process -based training and should include its approach to maintaining training materials and curriculum online, training quality control, post - implementation training, and cut -over training per application module, including the following: 1. Any pertinent details, limitations, exceptions concerning the services offered for training. 2. List or catalog of optional classes or training available but not included in this proposal. 3. On-line training courses and on-line evaluation tests provided. 4. Identification of customized training for government entities and your approach to customized training needs identified during implementation. 5. Maintenance of training materials and curriculum online. 6. Alternative training approaches. 7. Quality control on proposed training. 8. Additional training provided. 9. Post -implementation training. 10. Pre -implementation training. 11. Cut -over training services per application module. 12. Knowledge management capabilities. Section 5 37 City of Miami, Florida RFP No. 03-04-151 The ERP-SI is not responsible for delivery of the Process -based training, but will ensure that the City identified trainers have all the tools, documentation and resources necessary to successfully deliver training to the City's end -users. The City expects all training to be relevant specifically to government and to be modified to include quality control, best practices and agreed upon standard operating procedures. All users are expected to be thoroughly trained, certified and evaluated to accomplish specific job duties and to have substantial ERP education. Ali classes should have agreed upon curriculum with assessment tests, hands -on -exercises to be provided before, during and after all said classes including suggested follow-up materials. Materials developed in this process will be maintained by the ERP-SI or provided in full to the City with customizations for exercises, testing, online help and follow-up material. Areas of training to be developed in conjunction with the project plan should include but not be limited to: 1. Pre -Implementation: ERP Education, manager coaching, technical training 2. Pre -Installation: User training per module 3. implementation: Helpdesk, online help customization, on the job (floor) training 4. Post -Implementation: Refresher and cross -over training. Describe how your proposed training and implementation services will meet these objectives and complete the table below based on your approach. Add any additional services areas not listed in the table below: CRP Software Training Services S stem Software/Utilities Systems ntegrator Total Hours Provided On -Situ _ total 1 sours Provided Otf-Sito Allowed li of Attendees S stem Administration DBMS Administration Technical Su• •ort Trainin! Application System Administration Trainin! ,1.1.1111.11 Other describe Total System Administration/ Management Trainin. Hours Provided Human Resources MIIIIIMIIIINIIMMIIIIMI Pa roll Finance General Led • er Accounts Receivable Accounts Pa able Fixed Assets IMMVIIMIIMI Pro'ect Accountin! Grants Budget Re. ort Writin! Tool IIMMININIE Total Application Software Training Hours Pro•osed NEM Related Hardware and System Software System Architecture 1. The ERP-SI shall provide a recommended system architecture for the City's implementation of Oracle E-Business Suite Human Resources Management, Financials, Payroll, Budget and Section 5 38 City of Miami, Florida RFP No. 03-04-151 Purchasing. The proposed architecture must leverage existing City assets (SANS, Tape Silos, Servers, ect.) where feasible. 2. Provide a high-level description, and attach a diagram, of the overall proposed system architecture that clearly illustrates the following: a. All proposed hardware (e.g., servers, end user devices, peripherals, etc.). b. All software including system software, RDBMS, client software, Oracle E-Business Suite, and other required third party applications and their interrelationships. c. Recommended configurations for e-government related services such as eprocurement and on-line recruiting. d, Security features required for e-government related services (i.e., firewalls, DMZ, etc.). Related Hardware This section pertains to the procurement of the ERP system's central processor(s), new peripheral devices and requisite system software as required based on the selected ERP-SI's approach. ERP-SI must recommend the central processors and related peripherals, including system printers, tape drives/optical disk, cash drawers, cash registers, special check printers and bar code readers, system software SAN (Storage Area Network) and/or client/server software necessary for the normal operation of the proposed system(s). The City will be responsible for providing all approved hardware. The major hardware components for CPU, disk, etc., are to be specified by the ERP-SI. The City requires that all hardware specification be fully compatible and proven with the proposed Oracle E-Business Suite. ERP-SI shall provide vendor independent hardware components. ERP-SI shall further provide vendor specific hardware components and proposed pricing. The City may, at its discretion, purchase said hardware and software components from the ERP-SI. System Software The City requires that system software is considered state-of-the-art technology and represents the most current version in production at the time of installation. The City further requires that all software run in a Windows Operating System environment. No other operating systems shall be considered for this project. List all system software proposed or available with the system. Include all system software necessary to operate the proposed hardware components. Indicate by a letter code "I" if the software is included in this proposal, or letter code "0" if optional with this system. Code Response I or 0 Operating system: Name Release Level Database Management System (DBMS): Name Release Level Languages/Compilers Report writer programs Other (list) Cost Proposal The cost proposal must be completed as outlined. The City is State Sales Tax exempt. Notwithstanding, ERP-SI should be aware of the fact that all materials and supplies which are purchased by the ERP-SI for Section 5 39 City of Miami, Florida RFP No. 03-04-151 the completion of the contract is subject to the Florida State Sales Tax in accordance with Section 212.08 Florida Statutes as amended and all amendments thereto and shall be paid solely by the ERP-SI. The ERP-SI will provide firm, not to exceed Price by completing the pricing sheets. The ERP-SI is expected to provide its lowest pricing in the initial response to this RFP. The costing considerations of the ERP-SI selection process will be based on the total integration price contained in the RFP response. Failure to adhere to these requirements shall deem your proposal non -responsive. The City is interested in obtaining the best possible price for the selected services and product(s). Prices should be itemized as to number of labor hours and cost on a per task basis. To assist in the comparison of the proposals received, the City requires two types of cost information to be submitted. These are defined below: • Integration Services Cost: Describe and list all costs that would be associated with your proposed integration services. Costs not otherwise identified will not be accepted in a final contract. • Optional Costs: List and describe all optional cost items that could be associated with your. proposed integration services Exceptions must not be included in the response; however, it is not our intention to preclude any reasonable solution and we will discuss any exceptions that the Proposer brings to the City. The price quotation should be all-inclusive; that is, it should contain all costs associated with the proposed services necessary to effect a successful installation and all costs associated with the warranty period. Cost evaluations will be based on the price quotation submitted in the response. hardware The City of Miami desires the ERP-SI to propose an optimal hardware platform/n-tier configuration for the ERP. Each application tier should be the best fit for the specific function and should fit within the City of Miami's Technical Architecture. When defining an optimal solution, please consider the following criteria: • Ability to process the City's business transaction volumes • Degree to which the proposed solution is consistent with ERP industry trends • Cost (including one-time cost, maintenance costs, and other ongoing licensing impacts). Please describe your proposed optimal hardware platform/configuration (servers, workstations, printers, etc.). Be sure to include all environments required for a system of this size and complexity, including, but not limited to, Development, Quality Assurance, Test, Production and Reporting environments. This description must include a detailed layout of individual servers - Application, Database, Web, etc. Enterprise, Application, File and Print servers must also be Windows 2000 or greater (the City prefers to utilize 2003), provided by top tier hardware vendors. The City of Miami envisions three types of users. Please indicate your proposed platform for each user type. Thin client configurations should be Microsoft Internet Explorer Browser based or use Microsoft Terminal Server. Section 5 40 City of Miami, Florida RFP No. 03-04-151 City of Miami Operations Statistics The following statistics are provided to help understand the operation of the City of Miami and as an aid for the ERP-SI in providing a price estimate: Number of W2's issued 2002 4,372 Total Number of Employees as of 3/31/03 4,069 Number of Fire employees as of 3/31/03 690 Number of Police employees as of 3/31/03 1,448 Number of unions 4 Pay Period Basis Biweekly Number of 1099's issued 2002 1,606 Average number of vendor checks issued weekly 850 Number of vendors 29,483 Annual operating budget $416M Number of accounts in chart of accounts 125,978* Number of PO's issued annually 5,819 Number of recruitments performed annually 150 Average annual turnover rate for employees 14% Number of applications submitted annually 7,500 Average number of deductions per person/ per pay period 8 Average number of deductions per pay period 145 Number of Retirees 3,293 Number of Locations 100 Number of Shifts 15 A new Chart of Accounts is currently under development. This number should be used as guidance only. Users By Module Cost estimates should be based on the number of users by functional area shown in the following table where each row represents key functions for the future ERP software. The column headings describe the type of user access that is anticipated for each key function. Human Resources Position Control Cam • ensation Benefits Administration Trainin• Administration Pa roll Recruitin Em • to ee Self -Service A. •licant Self -Service General Led • er Accounts Pa able Billin• / Order Mana!ement Accounts Receivable 50 10 20 10 10 30 30 35 10 30 1500 1500 1500 30 30 1500 1500 1500 4000 1500 20 80 30 40 1500 1500 1500 30 30 1500 1500 1500 4000 1500 450 450 25 450 Section 5 41 City of Miami, Florida RFP No. 03-04-151 Fixed Assets 5 5 45 Cash Management 25 5 5 Treasury 5 5 5 Project Costing 5 25 30 Customer Portal Up to 400,000 0 0 Ex'ense Ent Self -Service 925 75 0 Budget and Forecasting 100 75 450 Balanced Scorecard 15 -- 15 Grant Administration 35 15 15 Grant Accountin! 20 15 15 Requisitioning 50 200 50 Purchasing 75 5 50 Inventory 25 5 25 Employee Requisitioning Self -Service -- 1000 1000 Su. 'tier Portal 8000 5 8000 OW / Business intelligence 50 -- 50 Overview of the Cost Areas and Format for Responses To assist in the comparison of the cost proposals, the City has developed the associated Excel file ERPSIPRICE.XLS. This file is to be downloaded from the City's website: http://ci.miami.fl.us/procurement/ERP/ERPSIPRICE.XLS and must be used to respond to the pricing requirements. In addition, where additional information has been requested or deemed necessary that provides an explanation of a pricing approach, include a supplementary MS Word format response (not within the Excel file) the explanations that provide additional detail to your cost proposals. The explanations should reference the structure established above, Explain your pricing approach Including any thresholds that may be relevant to our decision process. General Assumptions To ensure comparability between cost proposals, the City has included the following assumptions for guidance: • Implementation timeframe is 18 months or less • Estimated Number of Users (refer to previous page) • Assume a 5% growth rate in users for a period of 5 years • Total number of City employees is approximately 4,500 Using the General Assumptions above, provide us with your best pricing. When submitting your electronic responses for costs, proposers must rename the "ERPSIPRICE.XLS" file to "(yourname) ERPPRICE.XLS". The price spreadsheets must also be included in the printed copies of your proposals. Should any 3rd party solutions be part of the proposed solution to meet the City's requirements, a separate copy of the price worksheet should be completed for each and party solution. If any 3rd party solutions are required, please name the additional price worksheet files to"(yourname)ERPPRICE(addendumX).XLS", where X should be used to enumerate the number of 3rd party price sheets being provided. The City may, at its discretion, purchase third -party software from ERP-SI if reselling agreements are in place and the pricing is advantageous to the City, Section 5 42 City of Miami, Florida RFP No. 03-04-151 Price Worksheet The ERPSIPRICE.XLS file is divided into four (4) worksheets: • Summary — No Entry Required: Includes summary tables of cost information entered in the subsequent worksheets. ERP-SI should not enter information on this worksheet. Information here is automatically populated from the other worksheets. • Integration Costs: Includes pricing for installation, implementation, temporary interfaces, permanent interfaces, project management, testing, training, out-of-pocket expenses, data conversion, performance bond, business intelligence, storage management, change management, post go -live support, other. ERP-SI must provide # of Resources, # of Hours, Cost per Hour and Extd Cost for each of the services provided. The successful ERP-SI shall provide the City actual hours worked per resource on a weekly basis once the project commences. The Integration Costs section also includes costs for training, 3rd Party Tools and Hardware to support the ERP system. Services Description # of Resources # of Hours Cost i Hour Pricing Software Installation 30 Software Configuration $0 Customization - Reports $0 Customization - Interfaces $0 Customization - Conversions $0 Customization'- Extensions $0 Training $0 Change Management $0 BI (Business Intelligence) so Travel $0 Out -of Pocket Expenses $0 Post Go -Live Support $0 Performance Bond $0 Total Integration Services Costs $0 • Optional Services Costs: Includes pricing for any optional services provided in the proposal Optional Services Costs List Detail Unit Type # of Units $IUnit Pricing $0 $0 $o $0 Total Optional Services Costs $0 Section 5 43 City of Miami, Florida RFP No. 03-04-151 • Payment Schedule: List all deliverables with their respective costs and estimated payment date. Deliverable Cost Payment Date Total Integration Services Costs To fill out the Price Worksheet, enter data into the YELLOW cells in the Excel worksheet. Do not edit, add, or delete any other cells. Hourly Rates For any item of service and unexpected charge that falls outside this contract, what are your hourly rates? The rates must be fixed for the implementation period. Provide hourly rates for the type of service, as well as for all project roles. Services Description Hourly Rate Training Programming Design Testing Installation and Configuration System Administration Database Administration Quality Assurance Change. Management Post Go -Live Support Management _Project Other (Please specify) Section 5 44 City of Miami, Florida RFP No. 03-04-151 Training Training pricing is for project team training and is divided into two parts: technical training and application training. The training pricing should be consistent with the training philosophy described by the ERP-SI in any other area of their proposal. To ensure the comparability between ERP-SI's, use these assumptions when pricing training even though your training philosophy may recommend different numbers: Number of database administrators to receive training: 2 Number of software developers to receive training 10 Number of system/web administrators to receive training: 3 Number of application/functional team members to receive training: 40 The City is looking for your recommended approach for training by module. Consider the size of the City and your experience in accounts of this nature. The City is also interested in the ERP-SI proposing any software/tools that would leverage the development of end user training for the implementation of the ERP solution. The ERP-SI should describe the proposed software/tools (e.g. training aids, appropriate manuals, quick reference guides or templates, computer based training, on line help) and how these tools could be used to develop the end user training for the implementation. Response Format Two (2) complete soft copies on two (2) CD's, eight (8) complete hard copies, one (1) original and one (1) copy of all required City Forms in response to this RFP must be delivered to: Ms. Priscilla A. Thompson, City Clerk City of Miami Office of the City Clerk 3500 Pan American Drive First Floor Miami, Florida 33133 Responses must be clearly marked on the outside of the packaae referencing: RFP NO. 03-04-151 ENTERPRISE RESOURCE PLANNING (ERP) SOFTWARE SYSTEM INTEGRATOR Responses received after the date and time stated in the RFP will not be accepted and shalt be returned unopened to Proposer. Responses received at any other location than the aforementioned or after the Proposal submission date and time shall be deemed non -responsive. Responses should be signed by an official authorized to bind the Proposer to the provisions given in the Proposal. Responses are to remain valid for at least 180 days. Upon award of a Contract, the contents of the Proposal of the Successful Proposer(s) may be included as part of the Contract, at the City's discretion. Proposers must provide a response to each issue. Responses should be prepared in a concise manner with an emphasis on completeness and clarity. Packaging Instructions Proposals must be packaged In clearly marked separate sealed envelopes (or boxes). One package must contain the overall proposal and the other for pricing information only. The envelopes must contain the ERP-SI's name and the project name (ERP Software System Integrator) with the due date and time marked in the lower left hand corner. Submittal Guidelines Any and all Responses that do not follow the prescribed format are subject to immediate disqualification. When responding to this RFP, all Proposers shall adhere to the guidelines defined below: Section 5 45 City of Miami, Florida RFP No. 03-04-151 Completed Response forms, including all required forms included with this RFP. Refer to the Checklist(s) for guidance on the information and documentation to be provided with Response. Forms and Acknowledgments that Proposers shall complete and submit as part of its Proposal are discussed under Section 6.0, RFP Response Forms which include all of the following forms and/or documents. 6.1 RFP Information Form 6.2 Certificate of Authority 6.3 Indemnification and Insurance Requirements 6.4 Local Office Location Affidavit 6.5 Debarment and Suspension Certificate 6,6 Statement of Compliance with Ordinance 12271 — First Source Hiring 6.7 Proposer's Qualifications Statement 6.8 MIWBE Participation Form, plus proof of current Miami MIWBE Certification, if applicable 6.9 No Conflict of Interest, Non -Collusion Certification 6.10 Complete Proposal, including all required documentation and licenses, etc, FAILURE TO SUBMIT ALL OF THE ABOVE REQUIRED FORMS/DOCUMENTATION MAY DISQUALIFY PROPOSER. Throughout this RFP, the phrases "must" and "shall" will denote mandatory requirements. Any Proposer's proposed system that does not meet the mandatory requirements is subject to immediate disqualification. Section 5 46