To: Sandra Vega and Alvaro Alonso, City of Miami
From: Teresita Falcon, Falcon + Buena
Date 17 June 2004
Re: Memorial Boulevard
Southwest 13 Avenue from Caile Ocho to Coral Way
APPROVED
BY±*ft( o/Date13/0¢
E 3 1 8 We are pleased to resubmit our proposal for landscape architectural, and civil and electrical engineering
additional services for revisions to Memorial Boulevard construction drawings due to requested wider
traffic lanes, and extended curbs and gutters. The amount of the compensation has been revised to
5 5 include the production of the newly required base drawings and to eliminate duplication of services
among the disciplines.
LE JEUNE ROAD
CORAL CABLES
FLORIDA 3 3 1 3 4
TELEPHONE
3 9 5. 4 4 5. 7 5 7 5
FACSIMILE
3 0 5. 4 4 5. 3 5 5 0
FEARO CATT.NET
REGISTRATION
Construction Documents Phase
Grading, drainage, and pavement plans.
Memorial Boulevard from Calle Ocho to Coral Way
Irrigation water distribution plans.
Memorial Boulevard median at or near Coral Way only.
Irrigation and planting plans.
Memorial Boulevard median at or near Coral Way only.
Furnishings plans.
Memorial Boulevard median at or neer Coral Way only.
Lighting plans,
Memorial Boulevard median at or near Coral Way only.
The Professional Services Proposal is attached. Should you have any questions, please feel free to
contact us.
A A 2 5 7
A,
F A -L -C -6 -N * -B -U -E -N -O PROPOSAL -218
ARCHITECTURE EXHIBIT A
LANDSCAPE
ARCHITECTURE
Breakdown of work effort by Falcon + Buena based on total Scope of Work and (A/E) Professional
Services.
Staff/Category
1. Principal in charge
2. Project manager
3. Landscape architect
4. CAOD
5. Clerical
Total amount this service
)14130101i*-
Hours Hourly Rate Total
10 $160 $1,600
10 110 1,100
30 85 2,550
122 . 75 9,150
0
27 0
$14,400
APPROVED
001/1mityi
Date. 7/i3/oh
T rP.iti Falan Falcon + Buena
.F A -L -C -b -N + -B -U -E -N -O -PROPOSAL 316
ARCHITECTURE EXHIBIT B
LANDSCAPE Breakdown of work effort by Sub-Consurtant based on total Scope of Work and Professional Services.
ARCHITECTURE
Palm Engineering Group, inc., Civil Engineering
Staff/Category
1. Principal In charge
2. Project manager
3. Engineer
4. Inspector
5. CADD operator
6. Clerical
Total
Hours Hourly Rate Total
0 $160 $ 0
32 110 3,520
74 85 6,290
0 85 0
124 75 9.300
0 30 0
$19,110
Teresita Falcon. Fa on + Ruenn
Q
-F-L-C-6 •N + -B-U-E-N-O
ARCHITECTURE EXHIBIT C
LANDSCAPE
ARCHITECTURE
Fee Schedule for 100% Complete Deliveries Submittal
Phase
Phase l
Phase 11
Phase ill
Phase IV
Phase V
Phase Vll
Reimbursable
Total Amount
Programming Schematic Design
Design Development
Construction Documents and Permitting
Bidding and Negotiation
Construction Administration
Post -Construction Administration
Expenses "Not to Exceed" Fixed Fee
Additional Services "Not to Exceed" Fixed Fee
-PROPOSAL -416
not part of this proposal
not part of this proposal
not part of this proposal
not part of this proposal
not part of this proposal
not part of this proposal
not part of this proposal 4,,
$33,E10
APPROVED
ces,
-7//3/0- u
By)
Date
Teresita Falcon. Falcon + Bueno
-F A -L -C -6 -N # -B -U -E -N -O -PROPOSAL 516
ARCHITECTURE - EXHIBIT
ANDSCAP E Total Project Drawings and/or Deliveries.
Sheet Number Drawing Name or Activity Total Hours
ARCHITECTURE Landscape architecture
Project administration 10
Document checking/discipline coordination 10
Preliminary construction cost estimate 24
Base drawings 33
L 1-2 Tree Protection Plans
Memorial Boulevard median at or near Coral Way only,
L 16-17 Irrigation Plans
Memorial Boulevard median at ar near Coral VVay only.
L 19-20 Planting Plans
Memorial Boulevard median at ar near Coral Way only.
L 34-45 Decorative paving, site furnishing, lighting layout plan
Memorial Boulevard median.
10
15
22
48
Sheet Number Drawing Name or Activity Total Hours
Civil engineering
Project coordination
Site re -investigation
Preliminary construction cost estimate
C 1-32 Demolition plans
Memorial Boulevard from Calle Ocho to Coral Way
C 1-32 Typical section preparation
C 1-32 Geometry plans
Memorial Boulevard from Calle Ocho to Coral Way
22
12
14
50
10
52
C 1-32 Paving and drainage analysis and calculation 22
Memorial Boulevard from Calle Ocho to Coral Way
C 1-32 Paving and drainage plans 48
Memorial Boulevard from Calle Ocho to Coral Way
F -1 _C -C -b N + -B -tJ -E -N -Q -PROPOSAL •6f6
ARCHITECTURE EXHIBIT E
LANDSCAPE
ARCHITECTURE
Project Schedule
ID # Task NarrfefActivity Description Duration Start Date Finish Date
Ph l Programming & Schematic Design
Ph If Design Development
Ph ill Construction Documents 50%
Ph Elf Construction Documents 100%
City Review
Ph IV Bidding and Negotiations
Ph V Construction Contract Administration
Ph VI Post -Construction Administration
Not part
of this proposal
Not part
of this proposal
Not part
of this proposal
25 days 21 Jun 04 26 Jul 04
10 days 26 Jul 04 9 Aug 04
Not part
of this proposal
Not part
of this proposal
Not part
of this proposal
Teresita Faiccan Falcon + Bueno