Loading...
HomeMy WebLinkAboutexhibit25 6 6 6 -F A -L -C -6 -•N # -B -U -E -N -O -PROPOSAL 1111 ARCHITECTURE LANDSCAPE ARCHITECTURE S U I T s 5 To: Sandra Vega and Alvaro Alonso, City of Miami From: Teresita Falcon, Falcon + Buena Date 17 June 2004 Re: Memorial Boulevard Southwest 13 Avenue from Caile Ocho to Coral Way APPROVED BY±*ft( o/Date13/0¢ E 3 1 8 We are pleased to resubmit our proposal for landscape architectural, and civil and electrical engineering additional services for revisions to Memorial Boulevard construction drawings due to requested wider traffic lanes, and extended curbs and gutters. The amount of the compensation has been revised to 5 5 include the production of the newly required base drawings and to eliminate duplication of services among the disciplines. LE JEUNE ROAD CORAL CABLES FLORIDA 3 3 1 3 4 TELEPHONE 3 9 5. 4 4 5. 7 5 7 5 FACSIMILE 3 0 5. 4 4 5. 3 5 5 0 FEARO CATT.NET REGISTRATION Construction Documents Phase Grading, drainage, and pavement plans. Memorial Boulevard from Calle Ocho to Coral Way Irrigation water distribution plans. Memorial Boulevard median at or near Coral Way only. Irrigation and planting plans. Memorial Boulevard median at or near Coral Way only. Furnishings plans. Memorial Boulevard median at or neer Coral Way only. Lighting plans, Memorial Boulevard median at or near Coral Way only. The Professional Services Proposal is attached. Should you have any questions, please feel free to contact us. A A 2 5 7 A, F A -L -C -6 -N * -B -U -E -N -O PROPOSAL -218 ARCHITECTURE EXHIBIT A LANDSCAPE ARCHITECTURE Breakdown of work effort by Falcon + Buena based on total Scope of Work and (A/E) Professional Services. Staff/Category 1. Principal in charge 2. Project manager 3. Landscape architect 4. CAOD 5. Clerical Total amount this service )14130101i*- Hours Hourly Rate Total 10 $160 $1,600 10 110 1,100 30 85 2,550 122 . 75 9,150 0 27 0 $14,400 APPROVED 001/1mityi Date. 7/i3/oh T rP.iti Falan Falcon + Buena .F A -L -C -b -N + -B -U -E -N -O -PROPOSAL 316 ARCHITECTURE EXHIBIT B LANDSCAPE Breakdown of work effort by Sub-Consurtant based on total Scope of Work and Professional Services. ARCHITECTURE Palm Engineering Group, inc., Civil Engineering Staff/Category 1. Principal In charge 2. Project manager 3. Engineer 4. Inspector 5. CADD operator 6. Clerical Total Hours Hourly Rate Total 0 $160 $ 0 32 110 3,520 74 85 6,290 0 85 0 124 75 9.300 0 30 0 $19,110 Teresita Falcon. Fa on + Ruenn Q -F-L-C-6 •N + -B-U-E-N-O ARCHITECTURE EXHIBIT C LANDSCAPE ARCHITECTURE Fee Schedule for 100% Complete Deliveries Submittal Phase Phase l Phase 11 Phase ill Phase IV Phase V Phase Vll Reimbursable Total Amount Programming Schematic Design Design Development Construction Documents and Permitting Bidding and Negotiation Construction Administration Post -Construction Administration Expenses "Not to Exceed" Fixed Fee Additional Services "Not to Exceed" Fixed Fee -PROPOSAL -416 not part of this proposal not part of this proposal not part of this proposal not part of this proposal not part of this proposal not part of this proposal not part of this proposal 4,, $33,E10 APPROVED ces, -7//3/0- u By) Date Teresita Falcon. Falcon + Bueno -F A -L -C -6 -N # -B -U -E -N -O -PROPOSAL 516 ARCHITECTURE - EXHIBIT ANDSCAP E Total Project Drawings and/or Deliveries. Sheet Number Drawing Name or Activity Total Hours ARCHITECTURE Landscape architecture Project administration 10 Document checking/discipline coordination 10 Preliminary construction cost estimate 24 Base drawings 33 L 1-2 Tree Protection Plans Memorial Boulevard median at or near Coral Way only, L 16-17 Irrigation Plans Memorial Boulevard median at ar near Coral VVay only. L 19-20 Planting Plans Memorial Boulevard median at ar near Coral Way only. L 34-45 Decorative paving, site furnishing, lighting layout plan Memorial Boulevard median. 10 15 22 48 Sheet Number Drawing Name or Activity Total Hours Civil engineering Project coordination Site re -investigation Preliminary construction cost estimate C 1-32 Demolition plans Memorial Boulevard from Calle Ocho to Coral Way C 1-32 Typical section preparation C 1-32 Geometry plans Memorial Boulevard from Calle Ocho to Coral Way 22 12 14 50 10 52 C 1-32 Paving and drainage analysis and calculation 22 Memorial Boulevard from Calle Ocho to Coral Way C 1-32 Paving and drainage plans 48 Memorial Boulevard from Calle Ocho to Coral Way F -1 _C -C -b N + -B -tJ -E -N -Q -PROPOSAL •6f6 ARCHITECTURE EXHIBIT E LANDSCAPE ARCHITECTURE Project Schedule ID # Task NarrfefActivity Description Duration Start Date Finish Date Ph l Programming & Schematic Design Ph If Design Development Ph ill Construction Documents 50% Ph Elf Construction Documents 100% City Review Ph IV Bidding and Negotiations Ph V Construction Contract Administration Ph VI Post -Construction Administration Not part of this proposal Not part of this proposal Not part of this proposal 25 days 21 Jun 04 26 Jul 04 10 days 26 Jul 04 9 Aug 04 Not part of this proposal Not part of this proposal Not part of this proposal Teresita Faiccan Falcon + Bueno