Loading...
HomeMy WebLinkAboutEconomic Impact Study• • • ONYX 2 MAJOR USE SPECIAL PERMIT ECONOMIC IMPACT STUDY Prepared for: 02, LLC Prepared by: Sharpton, Brunson & Company June 7, 2004 ONYX 2 EEc no. is Impact Analysis. Submitted to: City of Miami Prepared For: BERMELLO AJAM►L & PARTNERS Prepared by: SHARPTON, BRUNSON & COMPANY, P.A. One Southeast Third Avenue Suite 2100 Miami, Florida 33131 (305) 374-1574 • • • ONYX 2 TABLE OF CONTENTS THE PROJECT OVERVIEW EXECUTIVE SUMMARY Introduction Summary of Benefits PAGE(S) 3 4 OBJECTIVES AND DEFINITIONS Objectives 6 Definition of Economic and Tax Impact 6 Direct and Indirect Effects 6 Measures of Economic Impact 7 Description of Results 8 DISCUSSION OF THE RESULTS BY ECONOMIC INDICATORS Impact Indicators 9 Results of Indicators 9 Impact of Construction 9 Impact of Ongoing Operations 10 Impact on Local Tax Revenues 10 Analysis by Economic Indicators 10 Employment 10 Wages 11 Output 11 Local Taxes 12 Public Sector Cost 13 Impact Fees 13 EXHIBITS Exhibit 1: Summary of Economic Impact Exhibit II: Impact and Other Fees 14 15 • • • Project Overview ONYX 2 is located at NE 28th Street and Biscayne Bay in the city of Miami, Florida (the Project). The Project consists of 117 condominium units and 163 parking spaces. The gross lot area is 89,180 square feet (2.05 acres) and the net lot area contains 51,060 square feet (1.17 acres). ONYX 2, a landmark, luxurious residential, 49 story high-rise waterfront development project with direct vistas to Biscayne Bay is unique in its design for its sleek design and the incorporation of a passive park within one of its parcels for the use not only of the residents but of the general public. This effort starts to address the need for urban open spaces in fast changing Edgewater Area in the City of Miami. The signature residential tower is geared to attract the empty -nesters, young professionals, second home buyers, retirees and newly relocated families from Latin America. The Project is located at the end of NE 28th Terrace facing North Bayshore Drive and Biscayne Bay. Access to the property is from NE 28th Terrace which also divides the parcels where the residential tower is located, from the parcel developed as the passive park. Views of the bay are preserved for the neighborhood by developing the parcels to the north of NE 28th Terrace and providing an open space and passive recreational area on the parcel south of NE 28th Terrace, The property is just north of Downtown Miami in the Performing Arts District. The Project is situated in an area that is currently undergoing a significant urban renewal process, north of the Performing Arts Center and in close proximity to Margaret Pace Park, Bicentennial Park, American Airlines Arena as well as many other mixed - use and upscale residential developments. The development of the Performing Arts Center promises to make Miami Dade County the leader in performing arts around the world as it will provide opportunity to being world -class art and culture as well as showcase other local South Florida art organizations. This Arts Center as well as the other amenities in the area start to change and establish an urban living style in the central areas of the City of Miami and as such will have a dramatic impact on the economic vitality of the District and the compatible developments that will follow. Geographically, ONYX 2 is located just minutes away from Biscayne Boulevard, 1-95 and SR 836 offering convenient access to the County's major expressways. Miami International Airport is only a fifteen minute drive from the property and other major employment centers in the Downtown area. This exceptional location will allow residents to quickly commute to and from employment in the Dade and Broward county region. 1 • • • Project Overview The building includes liner units buffering the garage, some of which will be accessible directly from NE 28th Terrace, one bedroom loft units and two and three bedrooms units with view of the bay and the City. Offering unique style and quality, each unit will be delivered as finished residences and designed with a sleek and elegant amenity package. Specific finishes include: kitchens with granite countertops, European cabinetry and stainless steel appliances; bathrooms complete with marble flooring, marble countertops, free-standing glass showers and double sinks and bidets (depending on the unit size); and floors may range from hardwood floors to marble tile or laminated concrete. All the units will have over -sized windows and sliding glass doors that lead out to large balconies with glass railings. The generous use of glazing will draw in the sunlight and feature the views of Biscayne Bay during the day and Downtown Miami at night. The building's amenities will include 24-hour manned security, with electronic access into the parking garage with access from NE 28th Terrace and a single point of entry into the residential tower from the main entrance which will include valet service. The recreational deck on the 8th floor will include an infinity -edge, heated swimming pool with a jacuzzi nestled on the lush landscaping, a state-of-the-art indoor and outdoor fitness facility with TVs on the cardio machines, steam room and sauna. The floor plates for the building consist of the following: The ground level includes a water entrance feature, entry lobby and reception, mailroom and building offices the building's service and loading areas and parking. The second through seventh floors will contain parking, loft units and nee -bedroom units with lofts. The eighth floor features an indoor and an outdoor fitness center with spa facilities, a beautiful garden deck with an urban style backyard that has colorful planters and tropical landscaping, a pool and a jacuzzi. The ninth floor includes a game and arcade room as well as a mezzanine. From the tenth to the 26th floor the tower includes lofts, one bedroom and lofts, two and three bedroom units. Two full floor penthouses are located at the 47th and 48th floor. 2 • • • Intro c uct on This document represents an in-depth economic and tax benefits analysis of the developmental and operation of a first class condominium building and retail facilities. The Project currently contemplated is comprised of the following components: ❑ 117 units of high -quality residential. ❑ 163 parking spaces. This analysis encompasses the entire Project and estimates the economic and tax benefits for both its developmental and operational phases. 3 • • • Su ary of Benefits The Project will bring significant economic benefits to the city of Miami (the City). This section summarizes the impact of the project on employment, public sector revenues and other economic benefits as a result of the development. Employment Employment considerations include the direct employment resulting from the Project. Average developmental construction phase employment will be for approximately 103 employees and the Project management is expected to employ 10 people for on -going maintenance and operations of the facilities. Wages To compute the wages associated with the new employment we started with budgeted data directly related to the developmental and operational phases of the Project, and we incorporated data from our research on retail sales. Total direct and indirect impacts expected from wages associated with the new development approximate the following: One Time $19,975,896 Annual $ 563,760 Tax Revenue The estimate of the public sector revenues associated with the development includes taxes and other revenues generated directly by the Project. Although public sector costs are important elements in measuring fiscal impact, these benefits have not been quantified in this document. This analysis only measures the benefits derived from the development. Annual tax revenue expected to be created totals $1,636,839. Output The estimate of total economic impact is measured by total output. This analysis measures the economic impact of developmental costs and ongoing, operational expenditures. To determine the effect of respending within the City, we utilized a multiplier to compute total direct and indirect benefits. Total output expected to be generated, as a result of the developmental and operational phases of the Project will approximate the following: One Time $ 99,932,765 Annual $ 1,428,192 4 • • Summary of Benefits Significant Community Benefits: Jobs Wages • Taxes • Economic Activity Residents' Spending Impacting Local Businesses: D Food ➢ Recreation/Entertainment D Transportation ➢ Retail The following table and charts summarize the economic impact of the ONYX 2 development. CONSTRUCTION PERIOD ANNUAL IMPACT RECURRING Economic Activity Stimulated Output $ 99,932,765 $ 1,428,192 Wages 19,975,896 563,760 Taxes 1,636,839 $ 3,628,791 Jobs Created $ 119,908,661 103 10 5 • • • Objectives And Definitions Objectives The objective of this analysis is to provide information on the various benefits created by the Project and to prepare an estimate of such benefits to the City. Our analysis is based on an economic model, which estimates economic and tax impacts of various projects on a designated area. The model is specifically tailored to the City of Miami (the City). Definition of Economic and Tax Impact The construction and subsequent operation of the Project will create important benefits within the City. These benefits include new income, new jobs, new tax revenue and new economic activity impacting upon every sector of the local economy. Moreover, through the multiplier effect of respending and reinvesting, indirect economic benefits are added to the direct benefits brought about by initial construction expenditures, the expenditures from ongoing operations and new spending at the retail enterprises. Direct and Indirect Effects The total economic impact of public and private projects and policies on a region does not end with the impact from the initial construction expenditures; the continued benefits to the local economy must also be considered. Income to firms furnishing construction materials and services is subsequently converted into employee salaries, material purchases, investment in plant and equipment, savings, profits, purchases of services, and a variety of other economic activities. Income to laborers is subsequently respent for purchasing of food, housing, transportation, education, entertainment, medical and dental services, clothing, personal services, and a wide variety of other goods and services_ Furthermore, income to the governmental unit is respent as salaries, purchases, and support of a variety of programs, including education, transportation, and social services. In turn, individuals, firms, and governments furnishing these goods and services again spend their income for more purchases, salaries, investments, and savings. In this manner, indirect benefits result each time the initial sum is respent, and the additional sum available in the local economy induces further job creation, business development and savings. Quantification of these indirect benefits has been the object of considerable economic study. Because economic relationships are so complex in our modern society, no single area or political unit is a completely self-contained economic unit. Therefore, purchases from other areas and political units are necessary, and goods services are exported in return. As purchases are made from other units, some of the benefits of economic respending are lost to the local economy. Ultimately, a smaller and smaller portion of the initial sum would remain, until, after several rounds of respending, an insignificant sum is left. 6 • • • objectives And Definitions The indirect effects can be viewed as a set of "ripples" in the economy. Indirect, like direct, resources require labor, materials, equipment and services for their production to induce further job creation and spending of wages. The "ripple" of the indirect effect multiplies the original impact of the purchase. The common measure of the magnitude of the "ripple" effect is called a multiplier. A multiplier measures the total magnitude of the impact on each particular economic indicator as a multiple of the initial, direct effect. For instance, a multiplier of "1" would signify no "ripple" effects as the total impact is 1 times the initial impact, while a multiplier of "2" would imply that the total impact is 2 times the direct effect. The actual magnitude of a multiplier depends on the likelihood the goods and services purchased in a region would be produced in, or provided from the region. The model we used to estimate the total economic impact incorporates a multiplier developed by utilizing past consumption and production patterns in the City. There will be significant economic benefit derived from the expenditures of the residents of the Project on eating, drinking, grocery, recreation, retail etc. This report does not include the economic impact of such expenditures. Measures of Economic Impact Various measures can be used to indicate the impact of a policy or project on a region. Specifically, for this study, they are the increases in local employment, wages, tax revenue and output that result. Definitions of these measures are as follows: Employment is measured full-time equivalent jobs. Wages include wages, salaries, and proprietor's income only. They may include non -wage compensation, such as pensions, insurance, and other fringe benefits. Wages are assumed to be expended by households in the area at which the wage-earner works. Local taxes include additional revenues from both ad valorem and non ad valorem assessments. Direct expenditures include those sums expended for land acquisition, site preparation and all hard and soft costs associated with a project. Indirect expenditures are those sums expended within the local economy as a result of the "ripple" effect described earlier. Output describes total economic activity, and is essentially equivalent to the sum of direct and indirect expenditures (exclusive of wages and taxes). 7 • • • Objectives ves And Definitions Description of Results For the purpose of describing the total economic benefits of the Project, the related expenditures and economic activity stimulated have been broken into two categories: Developmental Annual Recurring Developmental expenditures include those expenditures related to the design and construction phase of the Project and related amenities. Annual recurring activities stimulated are those expenditures incurred in connection with the ongoing operation of the Project. 8 • • • Discussion Of The Results By Economic Indicators Impact Indicators We measured the Project's impact on four commonly used indicators of economic activity. Those indicators are: • Jobs • Wages • Total output y Local taxes Results of Indicators Exhibit l details the Project's direct and indirect impact on the above economic indicators for Miami. A summary of such impact follows: DEVELOPMENT fOne Time) OUTPUT Direct Indirect $ 53,178, 355 46,754,410 $ 99.932.765 ANNUAL Operational: Direct $ 760,000 Indirect 668,192 $ 1.428.192 The economic indicator most commonly measured, and publicly reported on to gauge the economic impact of a public project is output. The impact of a project on the indicator output is often referred to as the project's economic impact. Impact of Construction The site preparation and construction expenditures, including soft costs and impact fees are estimated at $145 million. Such activity will create approximately 103 new full time equivalent jobs and employ a maximum of 163 workers during peak periods. The workers will earn approximately $10.6 million in direct wages. WAGES TAXES EMPLOYMENT $ 10,630,000 9,345,896 103 $ 19.975.896 103 $ 300,000 $1,636,839 10 2R3,760 $ 563,760 $1,636,839 10 9 • • • Discussion Of The Results By Economic Indicators Impact of Ongoing Operations As a result of the on -going operation and maintenance of the Project, Miami will gain approximately 10 new, permanent, full-time equivalent jobs. The wages of the workers who obtain these positions will provide an impact of approximately $564 thousand annually. The total expenditures for the Project's operations, will provide a new, permanent impact of $1.4 million annually to the City's economy. This impact consists of the effects of the direct expenditures from the maintenance, security and day-to-day operation of the Project, and the multiplied effects of such spending thus creating indirect benefits. Impact on Local Tax Revenues As a result of the construction and operation of the Project, various state, city and city governments and agencies would gain an estimated annual tax benefit of $1.6 million. Analysis by Economic Indicators Our analysis of the economic and tax benefits of the Project was done by each major phase of the Project. We identified the major phases to be developmental and operational. This analysis determines the economic benefits to the City by identifying such benefits for each of the phases. The effects on economic indicators used to measure benefits (employment, wages, output and taxes) were computed for each phase. Em ployment Employment is one of the most important economic benefits of the Project. It is one of the most accessible and direct benefits for the City's residents and it's residents and is a primary means by which developmental, operational and maintenance expenditures generate indirect economic benefits. A portion of this employment occurs on -site as a result of new spending at the retail enterprises, and a portion is derived from on -going operations of the Project. Further employment is generated off -site by the expenditures of employees of the Project and businesses located in the Project, at area businesses. As can be seen in Exhibit I, total short-term (developmental) employment will average 103 employees over an seventy-two month period and a total on -going employment will average 10. The total on -going positions can be summarized as follows: • Management • Security • Parking Maintenance/Facilities 10 • • • Discussion Of The Resu Indicators ks By Economic Wages The analysis deemed wages are a direct by-product of employment. As discussed in the above section, both on -site and off - site jobs are created. There were both temporary and permanent in nature. To compute the wages associated with the new employment we started with budgeted data directly related to the developmental and operational phases of the Project. Employment, such as construction related employment, was obtained directly from construction estimates. These numbers were tested for reasonableness. Output The output generated, as a result of the development and operations of the Project, is caused by the following type of expenditures: • Development costs expended in the City (100%) • Annual operational expenditures of management company • New spending in the locality by employees of businesses located in the Project To incorporate the impact of dollars being respent and/or reinvested in the City, a multiplier was applied to total direct output. A multiplier of 1.8792 was used to determine total direct and indirect output created by the Project. This multiplier indicates that for every $100 spent in Miami, another $187.92 will be respent or reinvested in Miami. This multiplier was obtained from the Dade City Planning Department. Direct output from the developmental phase of the Project is primarily a result of developer costs. These costs include land acquisition, site preparation and soft and hard costs relating to the Project's construction. To determine the total output we determined what development costs were expected to be or had been spent in Miami. Total direct output during the development phase is $53 million. Total indirect output created by the direct respending in Miami is $47 million. Thus total Miami Output from the development of the Project is $100 million. The final component of output results from the direct operating expenditures of the Project, and the indirect benefits created as a result of the multiplier effect on direct output. The Developer provided us with an annual operating budget for the Project. An overall assumption was made that all expenditures would be spent initially in the City. 11 • • • Discussion Of The Results By Economic Indicators Output (Contd.) The total operating expenditures incorporate all estimated expenses of the ongoing operation of the Project. The impact of the retail enterprises was measured separately as an economic indicator. To incorporate the potential respending and reinvesting in Miami, the multiplier effect was measured. By applying a multiplier of 1.8792 to the total direct output from operating expenditures and the retail enterprises, we determined total output (direct and indirect) from on- going operating expenditures and retail sales. Local Taxes A key and significant benefit generated from the development and operation of the Project is taxes. Several types of tax revenue will be generated from this project including ad valorem taxes. Specific ad valorem taxes include real and personal property taxes. Other taxes include occupational taxes and community development taxes. New real property taxes will be assessed on the Project. The assessment is based on a predetermined mileage rate being applied to the taxable value of the real property. We computed real property taxes for the developmental phase based on the cost of the development of the Project. This assessment base is very conservative since tax on real property typically is assessed on appraised values and not actual cost. The basis for ongoing taxes is also overall cost. The mileage rate was obtained from the City Tax Collectors office relative to the Project's location. The projected annual real property taxes are approximately $106 million. Total ad valorem taxes assessed by Miami -Dade County are allocated based on mileage rates to certain governmental entities. Listed below is the allocation of projected tax revenue. City Operating School Operating County Operating Debt Service - City Debt Service -County South Florida Water Library Operating School Debt Service Florida Inland Navigation Environmental Projects Children's Trust TOTAL $ 532,833 511,885 362,965 65,673 17,330 36,303 29,553 41,471 2,341 6,081 30,404 $ 1,636,839 12 • • • Discussion Of The Results By Economic Indicators Local Taxes (Contd.) Although not quantified, the City, through its receipt of allocated state sales taxes will receive an additional benefit as a result of the development and operation of the Project, and from the retail enterprises. Public Sector Costs Impact fees Very significant factors in measuring the economic impact on a specific region of a project are impact and other required development fees. A summary of these fees are listed below: • City of Miami Developmental Impact Fee • City of Miami Developmental Admin Fee • Miami -Dade County Roadway Impact Fee • Miami -Dade County School Impact Fee • Building Permit Fee • Installation Energy Fee • Other Fees For the purpose of this economic impact analysis, fees are included as a part of the direct development cost (output). Impact fees total approximately $474 thousand and other fees total approximately $320 thousand. These fees are shown in detail in Exhibit 11. 13 • • • Exhibit List Exhibit I Exhibit 11 Summary of Economic Impact Impact and Other Fees • • Exhibit OUTPUT WAGES EMPLOYMENT TAXES DIRECT DEVELOPMENTAL $ 53,178,355 $ 10,630,000 103 OPERATIONAL 760,000 300,000 10 $ 1,636,839 TOTAL DIRECT 53,938,355 10,930,000 113 1,636,839 INDIRECT DEVELOPMENTAL 46,754,410 9,345,896 OPERATIONAL 668,192 263,760 TOTAL INDIRECT 47,422,602 9,609,656 TOTAL BENEFITS $ 101,360,957 $ 20,539,656 113 $ 1,636,839 TOTAL DEVELOPMENTAL $ 99,932,765 $ 19,975,896 103 TOTAL OPERATIONAL 1,428,192 563,760 10 $ 1,636,839 TOTAL BENEFITS $ 101,360,957 $ 20,539,656 113 $ 1,636,839 14 • • • Exhibit - II IMPACT AND OTHER FEES: A. Development Square Footages: 1) Total gross building area (with parking) 2) Maximum development area (FAR) 3) Gross parking area Square Footage 479,160 228,820 89,740 B. Impact Fees: Amount 1) City of Miami Developmental Impact Fee 2) Developmental Impact Administration Fee 3) Miami -Dade County Roadway Impact Fee 4) Miami -Dade County School impact Fee Total of all Impact Fees C. Non -Impact Fees: 1) Miami Dade W.A.S.A. "connection fees" 2) Building Permit Fee 3) Installation Energy Fee 4) Major Use Special Permit Application Fee 5) Miami -Dade County Code Compliance 6) Radon Gas Fee 7) Fire Plan Review Fee 8) Ground Cover Fee 9) Land Use/Zoning 10) Zoning Review for Building Permit Fee 11) Certificate of Occupancy Fee 12) Application Fee 127,539 3,826 102,609 239,759 $ 473,733 $ 163,566 54,583 47,916 30,000 15,500 2,396 4,552 253 511 60 250 35 Total of all Non -Impact Fees $ 319,622 Total of all Fees for Project $ 793,355 Source: City of Miami Planning, Building and Zoning Department. Miami Dade County Impact Fees 15