HomeMy WebLinkAboutTraffic Impact Analysis II• • • APPENDIX A Existing Intersection Levels of Service HCS2000: Signalized Intersections Release 4.1d • Analyst: J. 7ELSTEDT Agency: Date: 6/22/2004 Period: TM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 8TH STREET No. Lanes LGConflg Volume Lane Width RTOR Vol Inter..: 2244 Area Type: All other areas Jurisd: Year : EXISTING N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L. T R 0 3 0 LT 348 1673 11.0 0 0 0 0 3 0 TR 348 61 11.0 0 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combinat.7on 1 2 3 4 I 5 6 7 8 EB Left P I NB Left Thru P Thru A Right 1 Right A Peds 1 Peds WB Left 1 SB Left Thru I Thru Right 1 Right Peds i Peds NB Right ; EB Right SB Right I WB Right Green 71.0 21.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT 3082 4341 0.74 0.71 10.5 B 10.5 B Westbound Northbound TR 896 4269 0.59 0.2.1 36.7 D 36.7 D Southbound ln°Lessection Delay = 15.5 (scc/veh) Intersection LOS = B PREMIERE TOWERS Appendix A June 22, 2004 Page A-1 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 8TH STREET No. Lanes LGConfig Volume Lane Width RTOS Vol_ Inter.: 2244 Area Type: All other areas Jurisd: Year : EXISTING N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound westbound Northbound Southbound 1 T R 0 3 0 LT 230 737 11.0 0 0 0 0 3 0 TR 651 28 11.0 0 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations_ 3 Phase Combination 1 2 4 5 6 EB Left P Thru P Right Peds WB Left Thru Right Peds NB Right SB Right Green 34.0 38.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 80.0 intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS NB Left Thru A Right A Peds SB Left Thru Right Peds EB Right WB Right secs Eastbound LT 1845 4341 Westbound Northbound TR 2070 4357 Southbound 0.91 0.43 29.4 C 29.4 0.41 0.47 13.9 0 13.9 Intersection Delay = 24.2 (sec/veh) Intersection L05 = C PREMIERE TOWERS Appendix A June 22, 2004 Page A-2 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Inter.: 3449 Agency: Area Type: All other areas Date: 6/22/2004 Juuri_sd: Period: AM PEAK HOUR Year : EXISTING Project ID: PREMIERE TOWERS E/W St: SE 7TH STREET N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Eastbound Westbound Northbound L No. Lanes IGConfig Volume Lane Width ! RTOR Vol 1 Southbound 0 0 0 0 2 1 T R 486 28 11.0 11.0 0 1 2 0 L LT 167 435 11.0 11.0 fl 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 j 5 6 7 8 EB Left NB Left A Thru 1 Thru A Right Right Peds I Peds WB Left f SB Left Thru P Thru Right P 1 Right Peds j Peds NB Right l 55 Right SB Right i WB Right Green Yellow All Red 31.0 60.0 4.0 4.0 1.0 0.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity s) v/c g/C Delay LOS Delay LOS Eastbound Westbound 3 1050 3388 0.57 0.31 31.2 C 30.8 C R 470 1516 0.09 0.31 24.9 C Northbound L T 1 0 , /- r) g r. iJ V 6 � 9. 1 ..A. U S_ 0 J' LT 2033 3388 0.31 0.60 10.0-- A 9.8 A Southbound tersection Delay - 18.9 (sec/veh) Intersection LOS = L PREMIERE TOWERS Appendix A June 22, 2004 Page A-3 HCS2000: Signalized Intersections Release 4.1d • • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 7TH STREET No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 3449 Area Type: All other areas Jurisd: Year : EXISTING N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound ! Westbound 0 0 0 0 2 1 T R 996 55 11.0 11.0 0 Northbound 1 Southbound iF T R L T R 1 3_ 2 0 1 0 0 0 1 L LT ; 1 538 344 1 I 11.0 11.0 I 1 I ? Duration 0.25 Area Type: All other areas Phase Combination 1 EB Left Thru Right Peds WB Left Thru P Right P Peds NB Right SB Right Green 36.0 Yellow 4.0 All Red 1.0 Signal Operations 2 3 4 5 6 7 NB Left A Thru A Right Peds SR Left Thru Right Peds EB Right WO Right 35.0 4.0 0.0 Cycle Length: 80.0 secs Intersection. Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity s) v/c g/C Delay LOS Delay LOS Eastbound Westbound T 1.525 3388 0.76 0.45 22.0 C 21.4 C R. 682 1516 0.12 0.45 13.1 B Northbound L 711 1601 09 n F! V J V_- 33.1 a L LT 1482 3388 0.34 0.44 15.0 B 25.2 C Southbound Intersection Delay = 23.3 (sec/veh) Intersection LOS = C PREMIERE TOWERS Appendix A June 22, 2004 Page A-4 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project, ID: PREMIERE TOWERS E/W St: SW 7TH STREET Inter.: 2.240 Area Type: All other areas Jurisd: Year : EXISTING N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastboind I Westbound j Northbound L R I L T R I L T R I I 1 No. Vanes I 0 0 0 I, 0 3 0 1 0 0 0 LGConfi_g 1 LT Volume f 163 665 Lane Width 11.0 RTOR Vol Southbound .1, R 0 2 1.. T R 237 82 12.0 12.0 0 Duration 0.25 Area Type: A11 other areas Signal_ Operations Phase Combination 1 2 3 4 I 5 6 7 8 EB Left 1 NB Left Thru 1 Thru Right Right Peds 1 Peds WB Left P 1 SB Left Thru P I Thru A Right I Right A Peds 1 Peds NB Righ_ ALB Right SB Right 1 WB Right Green 38.0 51.0 Yellow 4.0 4.0 All Red 2.0 1.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound LT 1846 4858 0.46 0.38 24.1 r 24.1 C Northbound Southbound 1841 3610 0.17 0.5:1 13.2 B 1.3.1 13 824 1615 0.14 0.51 13.0 B IntersectIon Delay = 20.4 (sec/ veh) Intersection. LOS PREMIERE TOWERS Appendix A June 22, 2004 Page A-5 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS F/W St: SW 7TH STREET. Inter.: 2240 Area Type: All other areas Jurisd: Year : EXIST'NG N/S St: SW .1ST AVENUE SIGNALIZED INTERSECTION SUMMARY I Eastbound I Westbound 1 Northbound 1 Southbound L T R I h T R 11 R I L T R I I No. Lanes 1 0 0 0 0 3 0 ! 0 0 0 I 0 2 1 LGConfig 1 I LT 1 T R Volume I 193 1561 I I 271 225 Lane Width I I 1.1.0 1 1 12.0 12.0 RTOR Vol 1 I ' 1 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combinaton 1 2 3 4 1 5 6 "7 8 I NB Left Thru Right { Peds p I SB Left p Thru A EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green 36.0 Yellow 4.0 All Red 1.0 Appr/ Lane Adj Sat Ratios Lane Group Flow Rate Grp Capacity (s) v/c Eastbound Westbound LT Right A Peds EB Right We Right 35.0 4.0 0.0 Cycle Length: 80.0 secs intersection Performance Summary Lane Group Approach g/C Delay LOS Delay LOS 21.88 4862 0.96 0.45 33.4 C 33.4 Northbound Southbound 1.579 361.0 0.23 0.44 14.1 B 14.8 B 707 1615 0.39 0.44 15.6 9 Intersection Delay 29.1 (sec/ven) Intersection LOS = C PREMIERE TOWERS Appendix A June 22, 2004 Page A-6 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAR HOUR Project ID: PREMIERE TOWERS E/W St: SW 8TH STREET No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound 1 I' Inter.: 2245 Area Type: A11 other areas Jurisd: Year : EXISTING N/S St: SW 2ST AVENUE SIGNALIZED INTERSECTION 0 3 0 TR 1869 260 11.0 1 Westbound 1 1 1 1 0 1 R 0 0 0 1 1 S UMMARY Northbound Southbound 1 L _ R 0 0 0 1 1 2 0 L LT 1157 143 112.0 12.0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 EB Left Thru P Right P Peds WB Left Thru Right Peds NB Right SE Right Green 69.0 23.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle intersection Performance Summary Appr/ Lane Grp Lane Group Capacity NB Left Thru Right Peds SB Left A Thru A Right Peds Right Right WB Adj Sat Ratios Lane Group Plow Rate (s) v/c g/C Delay LOS Length: 100.0 secs Approach Delay LOS Eastbound TR 2969 4303 Westbound Northbound Southbound L 415 LT 830 0.82 0.69 13.7 B 13.7 B 1805 0.44 0.23 33.7 C 3610 0.24 0.23 31.5 C 32.6 C into section Delay = 16.3 (sec/veh) Int.ersectio0_ L0S = H PREMIERE TOWERS Appendix A June 22, 2004 Page A-7 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 8TH STREET Inte.r..: 2245 Area Type: All other areas Jurisd: Year : EXISTING N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound 1 Westbound Northbound h Southbound 1.3 T R. No. Lanes 1 0 3 0 LGConfig I TR Volume I 877 120 Lane Width 1 11.0 RTOR Vol I 0 0 0 0 0 0 0 1. 2 0 L LT 81 283 12.0 12.0 Duration 0.25 Area Type: A11 other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru P Thru Right P Right Peds Peds WB Left SB Left A Thru Thru A Right Right Peds Peds NB Right EB Right SB Right WB Right Green 34.0 38.0 Yellow 4.0 4.0 A11 Red 0.0 0.0 Cycle Length.: 80.0 secs Intersection. Performance Sumr ary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c q/C Delay LOS Delay LOS Eastbound TR Westbound. 1829 4304 0.68 0.43 20.8 Northbound Southbound T. 857 LT 1715 C 20.8 C 1805 0.1.2 0.47 11...8 B 3610 0.22 0.47 12.4 8 12.2 B intersection Delay = 18.4 (sec/veh) Intersection LOS � E3 PREMIERE TOWERS Appendix A June 22, 2004 Page A-8 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY Inter.: 2257 Area Type: All other areas Jurisd: Year : EXISTING N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Eastbound Westbound Northbound 1 L T R L T R L T R I Southbound L T R No. Lanes 1 0 2 0 0 2 0 0 1 0 LGConfig 1 TR LT LTR Volume 1 1017 34 15 331 16 0 16 Lane Width 1 11.0 11.0 11.0 RTOR Vol l 0 0 1 1 1 L T R 93 66 175 11.0 11.0 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A Thru P Thru A Right P Right A Peds Peds WE Left P SB Left A Thru P Thru A Right Right A Peds Peds NB Right EB Right SB Right WE Right Green 36.0 16.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 2021 3368 0.56 0.60 8.4 A 8.4 A Westbound LT 1807 3012 0.23 0.60 5.8 A 5.8 A Northbound LTR 386 1449 0.18 0.27 17.1 B 17.1 Southbound L 339 1271 0.37 0.27 18.6 B T 475 1783 0.18 0.27 17.1 B 23.7 C R 404 1516 0.75 0.27 27.7 C Intersection Delay = 11.9 (sec/veh) Intersection LOS = B PREMIERE TOWERS Appendix A June 22, 2004 Page A-9 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2257 Area Type: All other areas Jurisd: Year : EXISTING N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L T R 0 2 0 TR 446 49 11.0 0 0 2 0 LT 14 1028 11.0 0 1 0 LTR 81 0 21 11.0 0 1 1 1 L T R 55 125 302 11.0 11.0 11.0 0 Duration 0.25 Area Type: All other areas Signal. Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A Thru P Thru A Right P Right A Peds Peds WB Left P SB Left A Thru P Thru A Right Right A Peds Peds NB Right EFL Right SB Right WB Right Green 33.0 19.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 1832 3331 0.28 0.55 7.6 A 7.6 A Westbound LT 1745 3173 0.69 0.55 12.0 B 12.0 B Northbound LTR 338 1068 0.45 0.32 17.3 3 17.3 Southbound L 391 1234 0.22 0.32 15.4 B T 565 1783 0.27 0.32 15.6 B 21.1 C R 480 1516 0.75 0.32 24.9 C Intersection Delay = 13.6 (sec/veh) Intersection LOS = B PREMIERE TOWERS Appendix A June 22, 2004 Page A-10 HCS2000: Signalized Intersections Release 4.1d • Analyst: U. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R SIGNALIZED Inter.: 2256 Area Type: All other areas Jurisd: Year : EXISTING N/S St: MiIAMI AVENUE INTERSECTION SUMMARY Westbound Northbound L T R L T R Southbound L T R 0 2 0 LTR 331 776 46 11.0 0 0 2 0 LTR 5 304 101 11.0 0 0 2 0 LTR 20 309 53 11.0 0 0 2 0 LTR 24 61 23 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 I 5 6 7 8 EB Left P 1 NB Left A Thru P 1 Thru A Right P '•, Right A Peds 1 Peds WB Left P 1 SB Left A Thru P Thru A Right P 1 Right A Peds 1 Peds NB Right 1 EB Right SB Right 1 WB Right Green 32.0 18.0 Yellow 4.0 4.0 All Red 1.0 1.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 1281 2402 1.04 0.53 51.6 D 51.6 D Westbound LTR 1590 2981 0.29 0.53 8.2 A 8.2 A Northbound LTR 923 3075 0.53 0.30 18.0 B 18.0 B Southbound LTR 803 2677 0.20 0.30 15.7 B 15.7 B Intersection Delay - 34,4 (sec/veh) Intersection LOS = C PREMIERE TOWERS Appendix A June 22, 2004 Page A-11 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAR HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: 2256 Area Type: All other areas Jurisd: Year : EXISTING N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound Northbound L T R L T R Southbound L T R 0 2 0 LTR 96 413 40 11.0 0 0 2 0 LTR 21 895 136 11.0 0 0 2 0 LTR 55 142 31 11.0 0 0 2 0 LTR 12 125 168 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations 6 7 8 Phase Combination EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green Yellow All Red 1 P P P P P P 33.0 4.0 1.0 Appr/ Lane Grp Lane Group Capacity 2 3 4 Intersection Adj Sat Flow Rate NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right 5 A A A A A A 17.0 4.0 1.0 Cycle Length: 60.0 Performance Summary secs Ratios Lane Group Approach (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 1151 Westbound LTR 1709 Northbound LTR 725 Southbound LTR 813 2093 0.50 0.55 10.0- A 10.0- A 3107 0.71 0.55 12.5 B 12.5 B 2560 0.41 0.28 17.8 B 17.8 B 2870 0.53 0.28 18.8 5 18.8 B Intersection Delay = 13.6 (sec/veh) Intersection LOS = B PREMIERE TOWERS Appendix A June 22, 2004 Page A-12 APPENDIX B Future Intersection Levels of Service Without Project • HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: Aid PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 8TH STREET Eastbound SIGNALIZED Inter.: 2244 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: MIAMI AVENUE INTERSECTION SUMMARY Westbound Northbound ! Southbound No. Lanes 1 0 3 0 LGConfig ! LT Volume 1408 1921 Lane Width. 11.0 RTOR Vol 1 0 0 0 0 3 0 1 0 0 0 TR ! ! 808 92 1 ! 11.0 0 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 2 EB Left P j NB Left Thru 1 Thru A Right 1 Right A Peds 1 Peds WB Left SS Left. Thru 1 Thru Right ! Right Peds 1 Peds NB Right 1 EB Right SB Right 1 WB Right Green 71.0 21.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 100.0 secs tersection performance Summary _.__......_ ....—_ ..--_.....---.. . Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate —_.. Grp Capacity Hs) v/c g/C Delay LOS Delay LOS Eastbound LT 3081 4340 0.85 0.71 13.9 B 13.9 Westbound Northbound TR 904 4304 1.28 0,21 175.4 L175.4 Southbound .:AntersectioI Delay 63.3 (sec/veh) Intersection LOS E PREMIERE TOWERS Appendix June 22, 2004 Page B-1 HCS2000: Signalized Intersections Release 4_ld Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 8Th STREET No. Lanes LGC o n f i q Volume Lane Width RTOR Vol Teter.: 2244 Area Type: All other areas Jurisd: Year. : FUTURE W/O PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound L 5 RIL Westbound I Northbound 1 Southbound T R I L T R 1 L T R I 0 3 0 1 0 0 0 I 0 3 0 LT TR 307 857 1 1 1041 47 11.0 f l 11.0 0 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left Thru P Thru A Right Right A Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right. SB Right WE Right Green 34.0 38.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 80.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT 1843 4337 1.08 0.43 70.4 E 70.4 E Westbound Northbound TR 2069 4355 0.66 0.47 16.9 B 1.6.9 B Southbound Intersection Delay = 48.6 (sec/veh) intersection LOS = 0 PREMIERE TOWERS Appendix B June 22, 2004 Page B-2 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE 'POWERS E/W St: SE 7TH STREET No. Lanes LGConfig Volume Lane Width RTOR Vol } Eastbound L T R { ( 0 0 0 Inter.: 3449 Area Type: A11 other areas Jurisd: Year : FUTURE w/o PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound ! Northbound L T R I h T R l Southbound I+I R 0 2 1 1 1 2 0 I' R I L LT 595 30 1432 680 11.0 11.0 I11.0 11.0 0 0 0 0 Duration 0.25 Phase Combination 1 EB Left Thru Right Peds WB Left Thru P Right P Peds NB Right SB Right Green 31.0 60.0 Yellow 4.0 4.0 All Red 1.0 0.0 Cycle Intersection Performance Summary Appr/ Lane Grp Lane Croup Capacity Eas �Lbound Westbound T 1050 R 470 Northbound 016 1 l G LT 2033 Southbound Area Type: All other areas Signal Operations 2 3 4 NB Left Thru Right Peds SB Lett Thru Right Peds EB Right WB Right 5 A A 6 7 8 Length: 100.0 secs Adj Sat Ratios Lane Group Flow Rate (s) v/c Approach Delay LOS Delay LOS 3388 0.70 0.31 34.3 C 1516 0.10 0.31 25.0 C r n 2 1694 i! �>G 0.60 1G1 3388 0.49 0.60 11.5 B Intersection Delay - 19.2 (sec/veh) 33.7 Intersection LOS - 5 PREMIERE TOWERS Appendix B June 22, 2004 Page B-3 HCS2000: Signalized Intersections Release 4.1d • • Analyst_: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 7TH STREET Eastbound 1 7' R No. Lanes 1 0 0 0 LGConfia I Volume Lane Width RTOR Vol I Inter.: 3449 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY I Westbound I Northbound I Southbound I L T R I L '' R I, L T R I I t ( 0 2 I I I 2 0 1 0 0 0 T RIL LT I 1206 61 1 "770 577 11.0 11.0 111.0 11.0 0 I Duration 0.25 Area Phase Combination 1 2 EB Left Thru Right Peds WE Left Thru P Right P Peds NE Right SB Right Green 36.0 Yellow 1.0 All Red 1.0 Appr/ Lane Grp Lane Group Capacity Type: All other areas Signal Operations 3 1 Intersection Adj Sat Flow Rate NB Left Thru Right Peds SB Left Thru Right Weds EB Right WB Right 5 A 6 7 8 35.0 4.0 0.0 Cycle Length: 80.0 Performance Summary Ratios Lane Group Approach {s) v/c g/C Delay LOS Delay LOS secs Eastbound Westbound 1' 1525 R 682 Northbound 741 LT 1482 Southk ound 3388 0.92 0.43 31.1 C 1516 0.13 0.43 13.2 B 1694 .1.27 0.44 153.3 3388 0.57 0.44 17.4 Intersection Delay = 62.1 (sec/veh) 30.0 C 88.8 Intersection LOS = E PREMIERE TOWERS Appendix B June 22, 2004 Page B-4 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AI-ILS'T'IO )T Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project TD: PREMIERE TOWERS E/W St: SW 7TH STREET Inter.: 2240 Area Type: All other areas Jurisd: Year : FUTURE W/0 PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY I Eastbound Westbound I Northbound 1 Scuthbound I L T R L T. R L T 2 1 L T R I No. Lanes I 0 0 0 0 3 0 0 0 0 ! 0 2 1 LGConfig I LT 1 T R Volume I 311 1254 ! 433 90 Lane Width 1 71.0 I 12.0 12.0 RTOR Vol_ I 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 EB Left I NB Left Thru 1 Thru Right Right Peds 1 Peds NB Left P I SE Left Thru P Thru A Right 1 Right A Peds ; Peds NE Right EB Right SE Right 1 WB Right 8 Green. 38.0 51.0 Yellow 4.0 4 . 0 All Red 2.0 1.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound LT 1841 4845 1.01 0.38 53.3 I] 53.3 D Northbound Sorthbound T 1841 3610 0.30 0.51 14.3 13 14.1 B R 824 1615 0.15 0.51 13.1. B Intersection Delay ._ 42.8 (sec/veil) Intersection LOS D PREMIERE TOWERS Appendix B June 22, 2004 Page B-5 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. RHT,STEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 7il STREET Inter.: 2240 Area Type: All other areas Jur,isd: Year. : FUTURE w/0 PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Eastbound Westbound Northbound ! Southbound L `1' R L T R L I R L T R 1 No. Lanes 1 0 0 0 0 3 0 0 0 0 1 0 2 1. LGConf i.g IT i T R Volume 1 346 2112 ! 499 246 Lane Width 1 11.0 ! 12.0 12.0 RTCR ,Vol ; 1 0 Duration 0.25 Area Type: All other areas Signal operations Phase Combination .1. 2 3 4 I 5 6 7 8 513 Left 1 NB Left Thru ! Thru Right 1 Right Peds 1 Peds WB Left P 1 SB Left Thru P i Thru A Right 1 Right A Peds 1 Peds ND Right ED Right SB Right 1 WB Right Green Yellow All Red 36.0 35.0 4.0 4.0 1.0 0.0 Cycle Length: 80.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound LT 2184 4853 1.44 0.45 223.1 2 223.1 Northbound Southbound T 1579 3610 0.42 0.44 15.7 3 15.8 13 R 707 1615 0.43 0.44 16.0 B Intersection Delay = 174.6 ( ec/veh) lntersection LOS = 2 PREMIERE TOWERS Appendix B June 22, 2004 Page B-6 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 8TH STREET Inter.: 2245 ,Area Type: All other areas Jurlsd: Year : FUTURE M/0 PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound 1 Northbound j Southbound [ L `T' R L T R 1 L T R [ L T R I I No. Lanes 1 0 3 0 0 0 0 I 0 0 0 1 1 2 0 LGConfig 1 TR I 1 L LT volume I 2283 410 i [458 241 Lane Width I 11.0 I 11.2.0 12.0 RI'OR Vol 1 0 I 1 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4[ 5 6 7 8 EB Left I N13 Left Thru P [ Thru Right P Right Peds I Peds WE Left 1 SE Left A Thru 1 Thru A Right 1 Right Peds I Peds NB Right 1 ER Right SE Right 1 WE Right Green 69.0 23.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Aclj Sat Ratios Lane Group Flow Rate Gro Capacity (s) v/c g Lane Group Approach Delay LOS Delay LOS Eastbound TR 2957 4285 1.05 0.69 46.4 n 46.4 Westbound Northbound Southbound L 415 LT 830 1.805 1.28 0.23 183.7 F 3610 0.41 0.23 33.0 C 125.1 F Intersection Delay = 63.7 (sec/veh) Intersection LOS E PREMIERE TOWERS Appendix B June 22, 2004 Page B-7 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AI'ILSTEDT Agency: Date: 6/22/2004 Period: PM PEAK FOUR Project ID: PREMIERE TOKERS E/W St: SW 8TH STREET Inter.: 2245 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Eastbound [ Westbound Northbound Southbound 1 1 T R 1 L T R I, T R I L T R 1 1 No. Lanes 1 0 3 0 1 0 0 0 0 0 0 LGConfig 1 TR Volume 1 1264 248 Lane Width 1 11.0 1 RTOR Vol 1 0 1 2 0 L LT 1335 475 11.2.0 12.0 1 Duration 0.25 Area Type: Ali other areas Signal Operations Phase Combination 1 2 3 4 1 5 EB Left I NB Left Thru P Thru Right P 1 Right Peds 1 Peds WO Left E SB Left A Thru 1 Thru A Right { Right Peds ° Peds NB Right 1 ER Right SB Right I WB Right Green 34.0 38.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 80.0 secs intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS 7 8 Eastbound TR Westbound 1818 4277 1.05 0.43 60.2 E 60.2 Northbound Southbound L 857 LT 1715 1805 0.51. 0.47 15.1 P 3610 0.36 0.47 13.5 5 14.2 0 Intersection Delay 43.7 (sec/veh) Intersection LOS D PREMIERE TOWERS Appendix B June 22, 2004 Page B-8 HCS2000: Signalized Intersections Release 4.1d • • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: 2257 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound Northbound L T R L T R Southbound L T R 0 2 0 TR 1179 74 11.0 0 0 2 LT 51 422 11.0 0 1 0 LTR 31 0 113 11.0 0 1 1 1 L T R 143 268 249 11.0 11.0 11.0 0 Duration 0.25 Phase Combination EB Left Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green Yellow All Red Area Type: All other areas Signal Operations 1 2 3 4 P P P P 36.0 4.0 0.0 Appr/ Lane Grp Lane Group Capacity Intersection Adj Sat Flow Rate NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right 5 A A A A A A 6 7 8 16.0 4.0 0.0 Cycle Length: 60.0 Performance Summary secs Ratios Lane Group Approach (s) v/c g/C Delay LOS Delay LOS Eastbound TR 2011 3351 Westbound LT 1420 2367 Northbound LTR 226 849 0.68 0.60 10.0- A 10.0- A 0.40 0.60 7.2 A 7.2 A 1.44 0.27 244.4 244.4 F Southbound L 199 747 0.97 T 475 1783 0.71 R 404 1516 1.06 Intersection Delay = 48.6 0.27 76.7 E 0.27 25.0 C 61.8 E 0.27 84.1 F (sec/veh) Intersection LOS = D PREMIERE TOWERS Appendix B June 22, 2004 Page B-9 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2257 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L T R 0 2 0 TR 483 53 11.0 0 0 2 0 LT 15 1111 11.0 0 1 0 LTR 125 0 22 11.0 0 1 1 1 L T R 60 135 326 11.0 11.0 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A Thru P Thru A Right P Right A Peds Peds WE Left P SB Left A Thru P Thru A Right Right A Peds Peds NB Right EB Right SE Right WE Right Green 33.0 19.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 1832 3330 0.30 0.55 7.7 A 7.7 A Westbound LT 1742 3167 0.74 0.55 13.2 B 13.2 B Northbound LTR 304 959 0.72 0.32 26.0 C 26.0 C Southbound L 382 1205 0.25 0.32 15.5 B T 565 1783 0.29 0.32 15.7 B 23.5 C R 480 1516 0.81 0.32 28.8 C Intersection Delay = 15.6 (sec/veh) Intersection LOS = B PREMIERE TOWERS Appendix B June 22, 2004 Page B-10 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AHLSTEDT Agency: ➢ate: 6/22/04 Period: AM PEAK HOUR Project ID: PERMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2256 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L T R 0 2 0 LTR 502 889 50 11.0 0 0 2 0 LTR 6 371 120 11.0 0 0 2 0 LTR 21 433 57 11.0 0 0 2 0 LTR 48 66 25 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left A Thru P Thru A Right P Right A Peds Peds WB Left P SB Left A Thru P Thru A Right P Right A Peds Peds NB Right EP Right SB Right WB Right Green 32.0 18.0 Yellow 4.0 4.0 All Red 1.0 1.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 1182 2216 1.41 0.53 202.6 F 202.6 F Westbound LTR 1500 2813 0.37 0.53 8.8 A 8.8 A Northbound LTR 928 3094 0.69 0.30 20.8 C 20.8 C Southbound LTR 645 2151 0.31 0.30 16.5 B 16.5 B Intersection Delay = 117.1 (sec/veh) Intersection LOS = F PREMIERE TOWERS Appendix B June 22, 2004 Page B-11 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY Inter.: 2256 Area Type: All other areas Jurisd: Year : FUTURE W/O PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L T R No. Lanes 1 0 2 0 LGConfig 1 DefL TR Volume 1237 528 44 Lane Width 112.0 11.0 RTOR Vol 1 0 0 2 0 LTR 22 1018 169 11.0 0 0 2 0 LTR 60 315 34 11.0 0 0 2 0 LTR 28 135 182 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 KB Left P 1 NB Left A Thru F 1 Thru A Right P 1 Right A Peds i Peds WB Left P 158 Left A Thru P Thru A Right P I Right A Peds 1 Peds NB Right 1 EB Right SB Right I WB Right Green 33.0 17.0 Yellow 4.0 4.0 All Red 1.0 1.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound DeLL 123 TR 970 224 2.01 0.55 494.6 8' 1763 0.63 0.55 12.3 B 151.7 F Westbound LTR 1707 3103 0.82 0.55 15.6 B 15.6 B Northbound LTR 743 2621 0.69 0.28 21.8 C 21.8 C Southbound LTR 770 2717 0.63 0.28 20.5 C 20.5 C Intersection Delay = 53.1 (sec/veh) Intersection LOS = D PREMIERE TOWERS Appendix B June 22, 2004 Page B-12 • • • APPENDIX C Future Intersection Levels of Service With Project HCS2000: Signalized Intersections Release 4.1d • Analyst: 3 AHLSTEOT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project TD: PREMIERE TOWERS E/W St: SE 9TH STREET Inter.: 2244 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAF4T AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Eastbound 1 Westbound 1 Northbound I L T R I T, T R 1 L T' R No. Lanes 1 0 3 0 1 0 0 0 1 0 3 0 LGConfig 1 LT I I TR Volume 1408 1921 I I 889 100 Lane Width 1 11.0 1 1 11.0 RTOR Vol 0 Southbound L T 8 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations 1 2 3 4 1 5 6 7 g 0 P Phase Combination EB Left. Thru Right Peds WB Left Thru Right Peds NB Right SB Right Green 71.0 Yellow 4.0 All Red 0.0 NE Left Thru A Right A Peds SE Left Thru Right Peds EB Right WE Right 21.0 4.0 0.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate — —.-. Grp Capacity (s) vic g/C Delay LOS Delay LOS Eastbound LT 3081 4340 0.85 0.71 13.9 B 13.9 B Westbound Northbound TR 904 4304 1.41 0.21 230.3 _ 230.3 1" Soutbbour.d intersection Delay PREMIERE TOWERS Appendix C 4.5 (sec/veh) Intersection LOS June 22, 2004 Page C-1 HCS2000: Signalized Intersections Release 4.1d • • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HC)UR Project ID: PREMIERE TOWERS E/W St: SE 8T'H STREET No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2244 Area Type: All other areas Jurlsd: Year. : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound # Northbound L T R i L T R I L T R I 0 0 0 I 0 3 0 0 3 0 TAT 307 857 11.0 TR 1127 56 11.0 0 Southbound 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 I 5 6 7 EB Left P Thru P Right Peds WB Left Thru Right Peds NB Right SB Right Green 34.0 38.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 80.0 secs intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS NB Left Thru A Right. A Peds SB Left Tt ru Right Peds E8 Right WB Right Eastbound LT 1843 4337 1.08 0.43 70.4 5 70.4 Westbound Northbound TR 2068 4353 0.72 0.47 18.0 B 1.8.0 Southbound intersection Delay = 48.0 (sec/veh) intersection LOS = D PREMIERE TOWERS Appendix C June 22, 2004 Page C-2 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 7TH STREET Eastbound 1 L T R Inter.: 3449 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY I Westbound I Northbound ; Southbound I L T R 1 L T R I L T R 1 1 1 No. Lanes ! 0 0 0 1 0 2 ?. 1 1 2 0 I 0 0 0 LGConfig I 1 T R 1 T, 1.51 1 Volume I I 595 30 1457 736 1 Lane Width I I 11.0 11.0 111.0 11.0 1 RTOR Vol I 0 I Duration 0.25 Area Type: All other areas Signal Operations Phase Co:mbinati..on 1 2 3 4 5 6 7 8 EB Left 1 NB Left A Thru 1 Thru A Right 1 Right Peds I Peds WE Left SB Left Thru P 1 Thru Right P 1 Right Peds ! Peds NB Right I LB Right SB Right 1 WB Right Green 31.0 Yellow 4.0 All Red 1.0 60.0 4.0 0.0 Cycle Length: 100.0 secs Intersection Performance Sem .ary ... �._.... ..........._ Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Floe Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound 1050 3388 0.70 0.31 34.3 C 33.7 C R 470 1516 0.10 0.31 25.0 C Northbound 5. 1016 1694 0.55 0.60 12.6 3 LT 2033 3388 0.53 0.60 12.0 B 12.2 B Southbound Intersection Delay = 19.2 (sec/veh) Intersection. LOS 3 PREMIERE TOWERS Appendix C June 22, 2004 Page C-3 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 7TH STREET No. Lanes LGConfig Volume Lane WidtI RTOR Vol Inter.: 3449 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound ; Westbound I Northbound 1 Southbound L III R L T R I L '1' R I L T R 1 0 0 0 0 2 1. 1 1 2 0 0 0 0 T R 1 L LT 1206 61 1796 637 11.0 11.0 111.0 11.0 1 9 i Duration 0.25 Area Type: All other areas Signal Operations Phase Comb.i..nation 1 2 3 4 I_ 5 6 7 8 EB Left 1 NB Left A Thru 1 Thru A Right 1 Right Peds I Peds WE Left 1 SB Left Thru P [ Thru Right P 1 Right Peds 1 Peds NB Right 1 EB Right SB Right 1 WB Right Green 36.0 35.0 Yellow 4.0 4.0 All Red 1.0 0.0 Cycle Length: 80.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity s) v/c g/C Delay LOS Delay LOS Eastbound Westbound I' 1525 3388 0.92 0.45 31.1 C 30.0 C R 682 1516 0.13 0.45 13.2 B Northbound ;69.44 371.o i741n . �- G J �1 L.. .- U - _. LT 1482 3388 0.63 0.44 18.4 B 96.4 P Southbound Intersection Delay = 61.3 (sec/veh) Intersection LOS = 5 PREMIERE TOWERS Appendix C June 22, 2004 Page C-4 HCS2000: Signalized Intersections Release 4.1d Analyst: J. AEi.LSTEDT Inter.: 2244 Agency: Area Type: All other areas Date: 6/22/2004 Jurisd: Period: AM PEAK HOUR Year : FUTURE WITH PROJECT Project ID: PREMIERE TOWERS - PEAK SEASON E/W St: SE 8TH STREET N/S St: MIAMI AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 3 0 LT 416 1959 11.0 0 0 0 Southbound L T R 3 0 TR 907 102 11.0 0 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left Thru P Thru A Right Right A Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 71.0 21.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 100.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT 3081 4340 0.87 0.71 14.7 B 14.7 B Westbound Northbound TR 904 4304 1.44 0.21 243.0 F 243.0 Southbound Intersection Delay = 89.2 (sec/veh) Intersection LOS = F • HCS2000: Signalized Intersections Release 4.1d Analyst J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: 5E 8TH STREET No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: 2244 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT - PEAK SEASON N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound Northbound L T R L T R Southbound L T R 0 3 0 LT 313 874 11.0 0 0 0 0 3 0 TR 1150 57 11.0 0 0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 EB Left P ! NE Left Thru P Thru A Right Right A Peds Peds WE Left SE Left Thru Thru Right Right Peds Peds NB Right EB Right SE Right WE Right Green 34.0 38.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 80.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) Eastbound LT 1843 4337 Westbound Northbound TR 2068 4353 Southbound 5 6 7 8 v/c g/C Delay LOS Delay LOS 1.10 0.43 78.8 E 78.8 E 0.74 0.47 18.4 B 18.4 B Intersection Delay = 53.0 (sec/veh) • Intersection LOS = D • HCS2000: Signalized Intersections Release 4.1d Analyst: J. AHLS'TEDT inter.: 2240 Agency: Area Type: All other areas Date: 6/22/2004 Jurisd: Period: AM PEAK HOUR Year : FUTURE WITH PROJECT Project ID: PREMIERE TOWERS E/W St: SW 7TH STREET N/S St: SW 1ST AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound I Northbound 1 Southbound [ T. 0 0 0 3 0 1 0 0 0 LT 311 1279 11.0 2 1 T R 491 90 12.0 12.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 NB Left Thru Right Peds SB Left Thru A Right A Peds EB Right WB Right EB Left Thru Right Peds 87B Left P Thru P Right Peds NB Right SB Right Green 38.0 Yellow 4.0 All Red 2.0 51.0 4.0 1.0 Cycle Length: 100.0 secs Intersection Performance Summary _.__.. ...____ ......� Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate ._._._ —..... Grp Capacity (s) v/c g/C Delay LOS Delay DOS Eastbound Westbound 1841 4845 1.02 0.38 57.3 E 57.3 5 Northbound Southbound T 1841 3610 0.34 0.51 14.6 D 14.4 B R 824 1615 0.15 0.51 13.1 B Intersection Delay 45.0 (sec/veh) intersection LOS = D PREMIERE TOWERS Appendix C June 22, 2004 Page C-5 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTE5T Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 7TH STREET No. Lanes LGCon f i. g Volume Lane Width RTOR Vol Eastbound L R -Inter,: 2240 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY 1 Westbound I Northbound L T R j L T R 1 0 0 0 1 0 3 0 LT 1346 2138 11.0 Southbound L _ R 0 0 0 0 2 1 T R 548 246 12.0 12.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 .7 EB Lett 1 NB Left Thru 1 Thru Right Right Peds 1 Peds WB Left P 1 SR Lett Thru P I Thru A Right I Right A Peds [ Peds NB Right 1 E8 Right SB Right I WB Right Green 36.0 35.0 Yellow 4.0 4.0 All Red 1.0 0.0 Cycle Length: 80.0 intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity s) v/c q/C Delay LOS Delay LOS secs Eastbound Westbound LT 2181 Northbound Southbound .t, R 4853 1.46 0.45 229.8 +' 229.8 1579 3610 0.46 0.44 16.0 B 16.0 s 707 1615 0.43 0.44 16.0 B Intersection Delay - 1 r i. (sec/veh) Intersection DOS - PREMIERE TOWERS Appendix C June 22, 2004 Page C-6 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 8TH STREET No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2245 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound 1 Northbound 1 Southbound L T R I L T R I L T R T; T R 1 ! I 0 3 0 1 0 0 0 i 0 0 0 1 _ 2 0 TR i 1 I L LT 2283 436 1 1 1458 299 11.0 1 1 112.0 12.0 0 1 I Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 1 5 6 7 8 EB Left 1 NB Left Thru F 1 Thru Right P Right Peds Peds WB Left SB Left A Thru Thru A Right Right Peds Peds NE Right ED Right SE Right WB Right Green 69.0 23.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 100.0 secs In_tersecI on Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 2953 4280 1.06 0.69 51.2 D 51.2 L Westbound Northbound Southbound L 415 1805 1.28 0.23 183.7 LT 830 3610 0.51 0.23 34.1 0 117.7 F Intersection Delay - 66.7 (sec/veh) Intersection LOS PREMIERE TOWERS Appendix C June 22, 2004 Page C-7 HCS2000: Signalized Intersections Release 4.1d • • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SW 8TH STREET Inter.: 2245 Area Type: All other areas Jur±sd: Year : FUTURE WITH PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY ( Eastbound ! Westbound I Northbound I Southbound IL TR L R I L T R I L T R I 1 I I No. Lanes I 0 3 0 i 0 0 0 I 0 0 0 I 1 2 0 LGConfig 1 TR 1 I L LT Volume 1 1264 269 I ( 1335 524 Lane Width l 11.0 i I 112.0 12.0 RTOR Vol 1 0 I I Duration 0.25 Area Phase Combination l 2 EB Left Thru P Right p Peds WB Left Thru Right Peds NB Right. SE Right Green 34.0 Yellow 4.0 All Red 0.0 Appr/ Lane Grp Lane Group Capacity Type: All other areas Signal Operations 3 4 NB Left Thru Right Peds I SR Left A Thru A Right Peds I EB Right WB Right 5 6 7 Intersection Performance Adj Sat Ratios Flow Rate (s) v/c g/C 8 38.0 4.0 0.0 Cycle Length: 80.0 Summary Lane Group Approach Delay LOS Delay LOS secs Eastbound TR 1815 4270 Westbound Northbound Southbound 857 LT 1715 1805 3610 1.07 0.43 67.1. F 67.1 0.51 0.40 Intersection Delay = 41.7 0.47 15.1 0.4/ 13.8 (scc/veh) Intersection LOS = D PREMIERE TOWERS Appendix C June 22, 2004 Page C-8 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2257 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R Southbound L T R 0 2 0 TR 1216 74 11.0 0 0 2 0 LT 51 422 11.0 0 1 0 LTR 31 0 113 11.0 0 1 1 1 L T R 143 282 285 11.0 11.0 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A Thru P Thru A Right P Right A Peds Peds WB Left P - SP Left A Thru P Thru A Right Right A Peds Peds NB Right HP Right SP Right WE Right Green 36.0 16.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 2011 3352 0.70 0.60 10.3 B 10.3 8 Westbound LT 1403 2339 0.41 0.60 7.2 A 7.2 A Northbound LTR 213 800 1.53 0.27 283.0 F 283.0 F Southbound L 199 747 0.97 0.27 76.7 E T 475 1783 0.75 0.27 26.8 C 89.3 F R 404 1516 1.22 0.27 139.6 F Intersection Delay = 61.0 (sec/veh) Intersection LOS = E PREMIERE TOWERS Appendix C June 22, 2004 Page C-9 HCS2000: Signalized Intersections Release 4.Id • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2257 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: SW 1ST AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 TR 514 53 11.0 0 0 2 0 LT 15 1111 11.0 0 1 0 LTR 125 0 22 11.0 0 Southbound L T R 1 1 1 L T R 60 129 364 11.0 11.0 11.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A Thru P Thru A Right P Right A Peds Peds WB Left P SD Left A Thru P Thru A Right Right A Peds Peds NB Right EB Right SB Right WB Right Green 33.0 19.0 Yellow 4.0 4.0 All Red 0.0 0.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound TR 1833 3333 0.32 0.55 7.8 A 7.8 A Westbound LT 1740 3163 0.74 0.55 13.2 B 13.2 B Northbound LTR 311 983 0.70 0.32 24.9 C 24.9 C Southbound L 382 1205 0.25 0.32 15.5 B T 565 1783 0.27 0.32 15.6 B 30.9 C R 480 1516 0.90 0.32 39.7 D Intersection Delay = 17.3 (sec/veh) Intersection LOS = B PREMIERE TOWERS Appendix C June 22, 2004 Page C-10 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PERMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Inter.: 2256 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound 1 Northbound I Southbound L T R L 1 R I L T R 1 L T R 1 0 2 0 0 2 0 I 0 2 0 1 0 2 0 DefL TR LTR 1 LTR I LTR 539 889 50 6 371 120 121 447 57 148 66 25 12.0 11.0 11.0 I 11.0 I 11.0 0 0 1 0 1 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left P NB Left A Thru P Thru A Right P Right A Peds Peds WB Left P SB Left A Thru P Thru A Right P Right A Peds Peds NB Right EB Right SB Right WB Right Green 32.0 18.0 Yellow 4.0 4.0 All Red 1.0 1.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound DefL 431 TR 944 809 1.37 0.53 196.3 F 1770 1.18 0.53 105.2 F 136.8 Westbound LTR 1608 3015 0.35 0.53 8.6 A 8.6 A Northbound LTR 929 3097 0.71 0.30 21.3 C 21.3 C Southbound LTR 639 2129 0.32 0.30 16.5 B 16.5 B Intersection Delay = 81.8 (sec/veh) Intersection LOS = F PREMIERE TOWERS Appendix C June 22, 2004 Page C-11 HCS2000: Signalized Intersections Release 4.1d • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: PM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: 2256 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound Northbound L T R L T R Southbound L T R 0 2 0 DefL TR 268 528 44 12.0 11.0 0 0 2 0 LTR 22 1018 169 11.0 0 0 2 0 LTR 60 327 34 11.0 0 0 2 0 LTR 28 135 182 11.0 0 Duration 0.25 Phase Combination 1 EB Left P Thru P Right P Peds WB Left P Thru P Right P Peds NB Right SB Right Green Yellow All Red Area Type: All other areas Signal Operations 2 3 4 NB Left Thru Right Peds SB Left Thru Right Peds KB Right WB Right 5 A A A A A A 6 7 8 33.0 17.0 4.0 4.0 1.0 1.0 Cycle Length: 60.0 secs Intersection Performance Summary Appr/ Lane Grp Lane Group Capacity Adj Sat Ratios Lane Group Approach Flow Rate (s) v/c g/C Delay LOS Delay LOS Eastbound DefL 123 224 TR 970 Westbound 1763 LTR 1707 3103 Northbound LTR 745 2631 Southbound LTR 768 2712 2.27 0.55 609.3 F 0.63 0.55 12.3 B 200.1 F 0.82 0.55 15.6 B 15.6 B 0.70 0.28 22.3 C 22.3 C 0.64 0.28 20.5 C 20.5 C Intersection Delay = 67.0 (sec/veh) intersection LOS = E PREMIERE TOWERS Appendix C June 22, 2004 Page C-12 • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL J. AHLSTEDT 6/22/04 PM PEAK HR SW/SE 7 ST West --bound FDOT FUTURE W/O TOWERS Analysis period length ANALYSIS PROJECT Description of Arterial 0.25 hr Seg. Cross street name 0 BRICKELL AVE 1 MIAMI AVENUE 2 SW 1ST AVENUE Length Urban Free of street flow segment class speed (mi) (mph) Running time (sec) Section 0.20 2 40 23.0 0.10 2 40 11.5 Intersection Delay Estimates Seg Cycle Green v/c Lane length ratio ratio cap. C g/C X c PVG Arr. I if type fac- input AT for Unit ext. (sec) 1 2 init. Cntr?. Other Inter. queue delay delay LOS (veh) (sec) (sec) 1 80.0 0.450 0.919 1525 2 80.0 0.450 1.441 2184 Running Seg. Sect. time (sec) 3 1.000 0.0 3 0.274 0.0 Arterial. Level of Service Inter. control. Other delay delay (sec) sec) 0 31.1 0.0 C 0 221.2 0.0 F Sum of Sun. of time by length by section section (sec) (mi) Arterial Arterial LOS by speed section (mph) 1 1 23.0 2 2 11.5 31.1 0.0 221.2 0.0 54.1 0.20 232.7 0.10 13.3 1.5 Total travel time (x) = 286.7 Total length (y) - 0.30 Total travel speed, Sa = 3600 x (y)/(x) = 3.8 Total urban street LOS (Exhibit 15-2) = F sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\S7MAFP.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\S7W1AEP.hCs HCS2000: Signalized Intersections Release 4.1d • • Analyst: J. AHLSTEDT Agency: Date: 6/22/2004 Period: AM PEAK HOUR Project ID: PREMIERE TOWERS E/W St: SE 8TH STREET No. Lanes LGConfL9 Volume Lane Width RTOR Vol Inter.: 2244 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT - MODIFIED TIMING N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound I.: T R 1 L T R 1 0 3 0 I 0 0 0 LT 408 1921 I 11.0 1 I Northbound 1 Southbound I I., T R 1 L T R 1 1 I 0 3 0 1 0 0 0 TR 889 100 1 11.0 1 0 Duration 0.25 Area Phase Combination EB Left Thru Right Peds WB Left Thru Right Peds NE Right SE Right Green Yellow All Red 1 P P 61.0 4.0 0.0 Appr/ Lane Grp Lane Group Capacity 2 Type: All other areas Signal Operations 3 4 1 Intersection 5 6 7 NE Left Thru A Right A Peds SE Left Thru Right Peds EB Right WE Right 31.0 4.0 0.0 Cycle Performance Summary Adj Sat Ratios Flow Rate (s) v/c g/C Length: 8 100.0 secs Lane Group Approach Delay LOS Delay LOS Eastbound LT 2647 4340 Westbound Northbound TR 1334 4304 Southbound 0.99 0.61 35.5 D 35.5 D 0.96 0.31 49.0 D 49.0 Intersection Delay == 39.9 (sec/veh) Intersection LOS =-: D PREMIERE TOWERS Appendix C June 22, 2004 Page C-13 • • • HCS2000: Signalized Intersections Release 4.1d Analyst: J. AHLSTEDT Inter.: 2240 Agency: Area Type: All other areas Date: 6/22/2004 Jurisd: Period: PM PEAK HOUR Year : FUTURE WITH PROJECT Project ID: PREMIERE TOWERS - MODIFIED TIMING E/W St: SW 7TH STREET N/S St: SW 1ST AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound I Westbound Northbound L T R I L T R L T R 1 0 0 0 t 0 3 0 0 0 0 { LT 1346 2138 1 11.0 1 Southbound L T R 0 2 1 T R 548 246 12.0 12.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left Thru Thru Right Right Peds Peds NB Left P SB Left Thru P Thru A Right Right A Peds Peds NB Right EB Right SB Right 1 WB Right Green 51.0 20.0 Yellow 4.0 4.0 All Red 1.0 0.0 Cycle Length: 80.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound Westbound LT 3094 4853 1.03 0.64 38.3 D 38.3 D Northbound Southbound T 903 3610 0.80 0.25 33.2 C 33.9 C R 404 1615 0.75 0.25 35.5 D Intersection Delay = 37.2 (sec/veh) Intersection LOS = D PREMIERE TOWERS Appendix C June 22, 2004 Page C-14 HCS2000: Signalized Intersections Release 4.1d • • • Analyst: J. AHLSTEDT Agency: Date: 6/22/04 Period: AM PEAK HOUR Project ID: PERNIERE TOWERS - ADD EB LT E/W St: CORAL WAY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: 2256 Area Type: All other areas Jurisd: Year : FUTURE WITH PROJECT N/S St: MIAMI AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound 1 Northbound 1 L T R 1 L T R i 1 1 Southbound I L T R 1 L 539 12.0 2 TR 889 50 11.0 0 0 i 0 16 2 0 LTR 1 371 120 121 11.0 0 1 0 2 0 LTR 447 57 11.0 0 148 0 2 0 LTR 66 25 11.0 0 Duration 0.25 Phase Combination 1 EP Left P Thru P Right P Peds WB Left P Thru P Right P Peds NB Right SB Right Area Type: All other areas Signal Operations 2 3 4 NB Left Thru Right Peds SB Left Thru Right Peds ER Right WB Right 5 A A A A A A Green 32.0 18.0 Yellow 4.0 4.0 All Red 1.0 1.0 Cycle Intersection Performance Summary App r / Lane Grp Lane Group Capacity Adj Sat Flow Rate (s) 6 7 8 Length: 60.0 secs Ratios Lane Group Approach v/c g/C Delay LOS Delay LOS Eastbound L 431 TR €794 Westbound LTR 1604 Northbound LTR 929 Southbound LTR 639 809 1.37 0.53 196.3 F 3363 0.62 0.53 11.4 B 75.6 E 3008 0.35 0.53 8.6 A 8.6 A 3097 0.71 0.30 21.3 C 21.3 C 2129 0.32 0.30 16.5 B 16.5 B Intersection Delay = 48.4 (sec/veh) Intersection LOS = D PREMIERE TOWERS Appendix C June 22, 2004 Page C-15 • • • APPENDIX D Transportation Facility LOS Analysis • • • INTRODUCTION A level of service analysis was conducted using the City's person trip methodology and criteria established in the adopted Volume 1 of the Miami Comprehensive Neighborhood Plan dated March 2004. The proposed project has potential impacts on four transportation facilities in or immediately in contact with the study area, The transportation facilities are defined by the following roadways: • SE/SW 7th Street • SE/SW 8th Street ® Coral Way • Brickell Avenue • Miami Avenue • SW 1st Avenue • SW 2nd Avenue These roadways are supported by an extensive transit system including MetroBus and MetroMover routes as well as MetroRail. YEAR 2009 VOLUME TO CAPACITY RATIOS Tables D-1 a and D-1 b present an analysis of the year 2009 volume to capacity ratios provided by each of the transportation facilities. Roadway vehicular capacities were based upon Tables 4-4 and 4-7 of the Florida Department of Transportation 2002 Quality/Level of Service Handbook. Person trip volumes and mass transit capacities were taken from data contained in the Downtown Miami Development of Regional Impact Increment II dated March 2003 ("Downtown DR1'). Maximum allowed volume to capacity ratios (v/c) are based upon Policy TR-1.1.2 of the adopted Volume 1 of the Miami Comprehensive Neighborhood Plan dated March 2004. As can be seen from Table D-1, the existing facilities currently operate with volume to capacity ratios which are less than the maximum allowable. Premiere Towers June 22, 2004 PAGE D-1 • PROJECT TRAFFIC Tables D-2a and D-2b present project traffic and mass transit ridership based upon PM peak hour project traffic. The project site is located in Traffic Analysis Zone (TAZ) 573. The cardinal distribution of the traffic within TAZ 539 was obtained from Miami -Dade County. The distribution is as follows: North -Northeast 18.87% East -Northeast 6.03% East -Southeast 4.21 % South -Southeast 0.96% South -Southwest 4.89% West -Southwest 25.77% West -Northwest 17.82% North -Northwest 21.46% Using this trip distribution, the project trip assignment was determined. This is shown in Figure D-1. YEAR 2009 VOLUME TO CAPACITY RATIOS WITH THE PROJECT Tables D-3a and D-3b present an analysis of the future year 2009 volume to capacity ratios with the project. Roadway vehicular volumes and mass transit volumes were determined by adding the data from Tables D-1a or D-lb (Year 2009 Without Project) and Tables D-2a or D-2b (Project Traffic). As can be seen from Tables D-3a and D-3b, it is estimated that all transportation facilities will operate with volume to capacity ratios which are Tess than the maximum allowable in the year 2009 with the project. Premiere Towers June 22, 2004 PAGE D-2 • • • SW 7thSt SW 8th St } a ww 4,4 ,NiV 5 J� h Q` 37/31 = AM/PM PEAK HOUR PROJECT TRAFFIC Q1 <1 ISE4thSt MfAMI RI t SE 5th St SE6thSt ,Z-- S" sp / l / BISCAYNE E Air N NTS FIGURE D-1 PROJECT TRAFFIC ASSIGNMENT Premiere Towers June 22, 2004 PAGE D-3 • TABLE D-la YEAR 2009 WITHOUT PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTIONAL PERSON TRIPS CLASS ROADWAY TRANSIT TOTAL 1.4 SE 7TH ST SE 7th Street Brickell Avenue SW 141 Avenue PRINC ART 3L-1W 2,249 SW 1st Avenue 1-95 3,132 SE 8TH ST SE 8th Street Brickell Avenue Miami Avenue PRINC ART 3L-1 W 2,868 Miami Avenue SW 1st Avenue 3L-1W 4,351 SW 1st Avenue 1-95 4L-1W 4,664 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4LU 2,465 Miami Avenue SW 1st Avenue 2,525 SW 1st Avenue SW 15th Road 3,858 CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1.6 TRANSIT TOTAL CLASS VPH PPV PAX PAX SE 7TH ST SE 7th Street Bricked Avenue SW 1st Avenue PRINC ART 3L-1W 3,096 4,954 276 5.230 SW let Avenue I-95 3,096 4,954 378 5.332 SE 8TH ST SE 8th Street Ericket Avenue Miami Avenue PRINC ART 3L-1W 3,096 4,954 276 5,230 Miami Avenue SW 1st Avenue 3L-1W 3,096 4,954 810 5,764 SW 1st Avenue 195 4L-1W 3,996 534 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4LU 2,340 3,744 780 4,524 Miami Avenue SW 1st Avenue 2,340 3,744 520 4,264 SW 1st Avenue SW 15th Road 2,340 260 VOLUME/CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED ViC WC SE 7TH ST SE 7th Street Bricket Avenue SW 1st Avenue PRINC ART 31-1W 0.43 120 SW 1st Avenue 1-95 0.59 1.20 SE 8TH ST SE 8th Street Brickell Avenue Miami Avenue PRINC ART 3L-1W 0.55 1.20 Miami Avenue SW 1st Avenue 3L-1 W 0.75 1.20 SW 1st Avenue 1.95 4L-1W 1.20 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4LU 0.54 1,20 Miami Avenue SW 1st Avenue 0.59 1.20 SW let Avenue SW 15th Road 1.20 PREMIERE TOWERS II June 22. 2004 • TABLE D-lb YEAR 2009 WITHOUT PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTIONAL PERSON TRIPS CLASS ROADWAY TRANSIT TOTAL 1.4 BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class iV 8,175 SE 8th Street SE 13th Street 4LD 7,008 SE 13th Street SE 15th Road 5,111 SE 15th Road Rickenbacker 3,994 MIAMI AVE Miami Avenue Flagler Street SE 6th Street MIN ART 3L•1W 2,998 SE 6th Street SE 8th Street 2L-1W 3,153 SE 8th Street SE 12th Street 2L-1W 3,176 SE 12th Street SE 13th Street 2LU 2,967 SE 13th Street SE 15th Road 2LU 1,230 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1W 2,035 SW 7th Street SW 5th Street 2L- 1W 3,817 SW 8th Street SW 13th Street 2L-1W 3.472 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU 4,143 SW 7th Street SW 6th Street 4LU 3,850 SW 8111 Street SW 11th Street 2LU 3,574 SW 11th Street SW 13th Street 2L11 3,537 SW 13th Street SE 15th Road 4LU 950 CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1.6 TRANSIT TOTAL CLASS VPH PPV PAX PAX BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class IV 3,010 4,816 4,792 9,608 SE 8th Street 5E 13th Street 4LD 3,010 4,816 6,938 11,754 SE 13th Street SE 15th Road 3,010 4,816 7,458 12,274 SE 15th Road Rickenbacker 3,010 4,816 612 5,428 MIAMI AVE Miami Avenue Flagler Street SE 6th Street MIN ART 3L-1W 3,096 4,954 534 5,488 SE 6th Street SE 8th Street 21-1W 2,064 3,302 4,419 7,721 SE 8th Street SE 12th Street 2L-1 W 2,064 3,302 4,665 7,967 SE 12th Street SE 13th Street 2LU 1,480 2,368 4,665 7,033 SE 13th Street SE 15th Read 2LU 1,480 2,368 1,920 4,288 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1 W 3,096 4,954 534 5.488 SW 7th Street SW 8th Street 2L-1 W 2,064 3,302 3,459 6,761 SW 8th Street SW 13th Street 2L-1W 2,064 3,302 2,925 6,227 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU 2,064 3,302 2,926 6,228 SW 7th Street SW 8th Street 4LU 2,340 3,744 3,082 6,826 SW 8th Street SW 11th Street 2LU 2,064 3,302 3,082 6,384 SW 11th Street SW 13th Street 2LU 2,064 3,302 2,926 6,228 SW 13th Street SE 15th Road 4LU 2.340 3,744 3,744 VOLUME/CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED V!C V/0 BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class 1V 0.85 1.50 SE 8th Street SE 13th Street 4LD 0,60 1,50 SE 13th Street SE 15th Road 0.42 1.50 SE 15th Road Rickenbacker 0.74 1.50 MIAMt AVE Miami Avenue Flagler Street SE 6th Street MIN ART 3L-1W 0.55 1.50 5E 6th Street SE 8th Street 2L-1 W 0.41 1.50 SE 8th Street SE 12th Street 2L-1 W 0.40 1.50 SE 12th Street SE 13th Street 2LU 0 42 1.50 SE 13th Street SE 15th Road 2LU 0.29 1.50 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 31,-1W 0.37 1.50 SW 7th Street SW 8th Street 2L-1W 0.66 1.50 SW 8th Street SW 13th Street 2L-1W 0.56 1.50 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU 0.67 1.50 SW 7th Street SW 8th Street 4LU 0-56 1.50 SW 8th Street SW llth Street 2LU 0.56 1.50 SW 11th Street SW 13th Street 2LU 0.57 1.50 SW 13th Street SE 15th Road 4LU 0,25 1,50 PREMIERE TOWERS li June 22.2004 TABLE D-2a PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTIONAL PERSON TRIPS CLASS VPH ROADWAY TRANSIT TOTAL 1.4 0.20 SE 7TH ST SE 7th Street Brickell Avenue SW 1st Avenue PRINC ART 3L-1 W SW1stAvenue 1-95 26 36 7 44 SE 8TH ST SE Bth Street Brickell Avenue Miami Avenue PRINC ART 3L-1 W 9 13 3 15 Miami Avenue SW 1st Avenue 34-1 W SW 1st Avenue 1-95 4L-1 W 21 29 6 35 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4413 Miami Avenue SW 1st Avenue 31 43 9 52 SW 1st Avenue SW 15th Road 69 97 20 116 CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1.6 TOTAL CLASS PPV PAX SE 7TH 5T SE 7th Street Brickell Avenue SW 1st Avenue PRINC ART 3L-1 W 4,954 4,954 SW let Avenue 1-95 4,954 4,954 SE 8TH ST SE 8th Street Brickell Avenue Miami Avenue PRINC ART 3L-1W 4,954 4,954 Miami Avenue SW lst Avenue 3L-1 W 4,954 4,954 SW 1st Avenue 1-95 4L-1 W SW 13TH ST SE 13th Street Brickelt Avenue Miami Avenue MIN ART 41U 3,744 3.744 Miami Avenue SW 1st Avenue 3,744 3,744 SW 1st Avenue SW 15th Road VOLUME/CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED VIC SE 7TH ST SE 7th Street Brickell Avenue SW let Avenue PRINC ART 3L-1W 1.20 SW 1st Avenue 1-95 1.20 SE 8TH ST SE Bth Street Srckelt Avenue Miami Avenue PRINC ART 3L-1W 1.20 Miami Avenue SW 1st Avenue 3L-1 W 1.20 SW 1st Avenue 1-95 4L-1 W 1-20 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4L1.1 1.20 Miami Avenue SW 1st Avenue 1.20 SW 1st Avenue SW 15th Road 1-20 PREMIERE TOWERS 11 June 22. 2004 • TABLE D-2b PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTt0t$AL PERSON TRIPS CLASS VPH ROADWAY TRANSIT TOTAL 1.4 0.20 BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class IV 16 22 5 27 SE 8th Street SE 13th Street 4LD 7 10 2 12 5E 13th Street SE 15th Road SE 15th Road Rickenhacker 11 15 3 19 MIAMI AVE Warn' Avenue Flagier Street SE 6th Street MIN ART 3L-1W 60 84 17 101 SE 6th Street SE 8th Street 2L-1W B6 120 25 145 SE 8th Street SE 12th Street 2L-1W 86 120 25 145 SE 12th Street SE 13th Street 2LU 43 60 12 72 SE 13th Street SE 15th Road 2LU 12 17 3 20 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1 W 49 69 14 83 SW 7th Street SW 8th Street 2L-1W 49 69 14 83 SW 8th Street SW 13th Street 2L-1W 70 98 20 118 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU SW 7th Street SW 8th Street 4LU SW 8th Street SW 11th Street 2LU SW 11th Street SW 13th Street 2LU SW 13th Street 5E 15th Road 4LU CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1-6 TRANSIT TOTAL CLASS PPV PAX PAX BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class IV 4,818 4,792 9,608 SE 8th Street SE 13th Street 4L0 4,816 6,938 11,754 SE 13th Street SE 15th Road 4,816 7,458 12,274 SE 15th Road Rickenhacker 4,816 612 5,428 MIAMI AVE Miami Avenue Fiagler Street SE 6th Street MIN ART 3L-1W 4,954 534 5,488 SE 6th Street SE 8th Street 2L-1W 3,302 4,419 7,721 SE 8th Street SE 12th Street 2L-1W 3,302 4,665 7,967 SE 12th Street SE 13th Street 2LU 2,368 4,665 7,033 SE 13th Street SE 15th Road 2LU 2,368 1,920 4,288 SW 1ST AVE SW lst Avenue Miami Avenue SW 7th Street LOCAL 3L-1W 4,954 534 5,488 SVv 7th Street SW 8th Street 2L-1W 3,302 3,459 6,761 SW Bth Street SW 13th Street 21-1 W 3,302 2,925 6,227 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU 3,302 2,926 6,228 SW 7th Street SW 8th Street 4LU 3,744 3.082 6,826 SW 8th Street SW 11th Street 2LU 3,302 3,082 6,384 SW 11th Street SW 13th Street 2LU 3,302 2,926 6,228 SW 13th Street SE 15Ih Road 4LU 3,744 3,744 VOLLJMEJCAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED VIC BRICKELL AVE Brickell Avenue SE 4th Street SE Bth Street PRIN ART Class IV 1.50 SE 8th Street SE 13th Street 4L0 1.50 SE 13th Street SE 15th Road 1.50 SE 15th Road Rickert backer 1,50 MIAMI AVE Miami Avenue Nagler Street SE 6th Street MIN ART 3L-1W 1.50 SE 6th Street SE 8th Street 2L-1W 1.50 SE 8th Street SE 12th Street 2L-1W 1.50 SF 121h Street SE 131h Street 2LU 1.50 SE 13th Street SE 15th Road 2LU 1.50 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1W 1,50 SW 7th Street SW 8th Street 2L-1W 1.50 SW Bth Street SW 13th Street 2L-1W 1.50 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 711-1 Street MIN ART 21.0 1-50 $tAW 7th Street SW 8th Street 4LU 1.50 SW 8th Street SW 11th Street 2LU 1.50 SW 11th Street SW 13th Street 2LU 1.50 SW 13th Street SE 15th Road 4LU 1-50 PREMIERE TOWERS 11 June 22 2004 • TABLE D-3a YEAR 2009 WITH PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTIONAL PERSON TRIPS CLASS TOTAL SE 7TH ST SE 7th Street Brickell Avenue SW 1st Avenue PRINC ART 3L-1W 2,249 SW 1st Avenue t-95 3,176 SE 8TH ST SE 8th Street Brickell Avenue Miami Avenue PRINC ART 3L-1 W 2,883 Miami Avenue SW let Avenue 3L-1W 4,351 SW 1st Avenue i-95 4L-1 W 4,699 SW 13TH ST SE 13th Street Brickell Avenue Miami Avenue MIN ART 4LU 2,465 Miami Avenue SW 1st Avenue 2,577 SW 1st Avenue SW 15th Road 3,974 CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1.6 TRANSIT TOTAL CLASS VPH PPV PAX PAX SE 7TH ST SE 7th Street Brickell Avenue SW 1st Avenue PRINC ART 3L-1W 3.096 4,954 276 5,230 SW lst Avenue 1-95 3,096 4.954 378 5,332 SE 8TH ST SE 8th Street Brickell Avenue Miami Avenue PRINC ART 3L-1W 3,096 4,954 276 5,230 Miami Avenue SW 1st Avenue 3L-1W 3,096 4,954 810 5,764 SW 1st Avenue t-95 4L-1 W 3,996 534 SW 13TH ST SE 13th Street Brickeli Avenue Miami Avenue MIN ART 4LU 2,340 3,744 780 4,524 Miami Avenue SW 1st Avenue 2,340 3,744 520 4,264 SW 1st Avenue SW 15th Road 2,340 260 VOLUME/CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED V/C V/C SE 7TH 5T SE 7th Street Brickell Avenue SW 1st Avenue PRINC ART 3L-1W 0.43 1.20 SW 1st Avenue I-95 0.60 1,20 SE 8TH ST SE 8th Street Brickeii Avenue Miami Avenue PRINC ART 3L-1W 0.55 1.20 Miami Avenue SW 1st Avenue 3L-1W 0.75 1.20 SW 1st Avenue 1-95 4L-1W 1.20 SW 13TH ST SE 13th Street Nickell Avenue Miami Avenue MIN ART 4LU 0.54 1.20 Miami Avenue SW 1st Avenue 0.60 1.20 SW let Avenue SW 15th Road 1.20 PREMIERE TOWERS!' June 22. 2004 • • TABLE D-3b YEAR 2009 WITH PROJECT VOLUME FACILITY ROADWAY FROM TO FUNCTIONAL PERSON TRIPS CLASS TOTAL BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class IV 8,202 SE eth Street SE 13th Street 4LD 7,020 SE 13th Street SE 15th Road 5,111 SE 15th Road Rickenbacker 4,013 MIAMI AVE Miami Avenue Ftagler Street SE 6th Street MIN ART 3L-1 W 3.099 SE 6th Street SE 8th Street 2L-1W 3,298 SE 816 Street SE 12th Street 2L-1W 3.321 SE 121h Street SE 13th Street 2LU 3,039 SE 13th Street SE 15th Road 2LU 1,250 SW 1ST AVE SW let Avenue Miami Avenue SW 7th Street LOCAL 3L-1 W 2,118 SW 7th Street SW 8th Street 2L-1W 3,900 SW 8th Street SW 13th Street 2L-1W 3.590 SW 2Nt) AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 24U 4,143 SW 7th Street SW 8th Street 4LU 3,850 SW 8th Street SW 11th Street 2LU 3.574 SW llth Street SW 13th Street 2LU 3,537 SW 13th Street SE 15th Road 4LU 950 CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL CAPACITY 1.6 TRANSIT TOTAL CLASS VPH PPV PAX PAX BRICKELL AVE Brickell Avenue SE 4th Street SE 8th Street PRIN ART Class IV 3,010 4,816 4,792 9,608 SE 8th Street SE 13th Street 4LD 3,010 4,816 6.938 11,754 SE 13th Street 5E 151h Road 3,010 4,816 7.458 12,274 SE 15th Road Rickenbacker 3,010 4.816 612 5,428 MIAMI AVE Miami Avenue Hagler Street SE 6th Street MIN ART 3L-1 W 3,096 4,954 534 5,488 SE 6th Street SE 8th Street 2L»1 W 2,064 3,302 4,419 7,721 SE 8th Street SE 12th Street 2L-1W 2,064 3,302 4,665 7,967 SE 12th Street 5E 13th Street 2LU 1,480 2,368 4,665 7,033 SE 13th Street SE 15th Road 2LU 1,480 2,368 1,920 4,288 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1 W 3,096 4,954 534 5,488 SW 7th Street SW 8th Street 2L-1W 2,064 3,302 3.459 6,761 SW Bth Street SW 13th Street 2L.-1 W 2,064 3,302 2,925 6,227 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2i.0 2,064 3,302 2,926 6,228 SW 7th Street SW 8th Street 41,U 2,340 3,744 3,082 6,826 SW 8th Street SW 11th Street 2LU 2,064 3,302 3,082 6,384 SW 11th Street SW 13th Street 2LtJ 2,064 3,302 2,926 6,228 SW 13th Street SE 15th Road 4LU 2,340 3,744 3,744 VOLUME/CAPACITY FACILITY ROADWAY FROM TO FUNCTIONAL MAX CLASS ALLOWED Vie VIC BRICKELL AVE Brickeit Avenue SE 4th Street SE 8th Street PRIN ART Class IV 0.85 1.50 SE 8th Street SE 13th Street 4LD 0.60 1.50 SE 13th Street SE 15th Road 0.42 1.50 SE 15th Road Rickenbacker 0,74 1.50 MIAMI AVE Miami Avenue Flagler Street SE 6th Street MIN ART 3L-1 W 0.56 1.50 SE 6th Street SE 8th Street 2L-1W 0.43 1.50 SE 8th Street SE 12th Street 2L-1W 0,42 1.50 SE 12th Street SE 13th Street 2LU 0.43 1.50 SE 13th Street SE 151h Road 2LU 0.29 1.50 SW 1ST AVE SW 1st Avenue Miami Avenue SW 7th Street LOCAL 3L-1 W 0.39 1.50 SW 7th Street SW 8th Street 2L-1W 0.58 1.50 SW 8th Street SW 13t1 Street 21-1W 0.58 1.50 SW 2ND AVE SW 2nd Avenue SW 2nd Street SW 7th Street MIN ART 2LU 0.67 1.50 SW 7th Street SW 8th Street 4LU 0.56 1.50 SW 81h Street SW 11th Street 2LU 0.56 1.50 SW iltti Street SW 13th Street 21.0 0.57 1.50 SW 13th Street SE 15th Road 4LU 0.25 1.50 PREMIERE TOWERS I' June 22. 2004 i • • RAW DATA & CALCULATIONS PROJECT NAME: Traffic Data Collection Notice to Proceed : TIME 12:00 AM 01:00 AM 02:00 AM 03:00 AM 04:00 AM 05:00 AM 06:00 AM 07:00 AM 08:00 AM 09:00 AM 10:00 AM 11:00 AM 12:00 PM 01:00 PM 02:00 PM 03:00 PM 04:00 PM 05:00 PM 06:00 PM 07:00 PM 08:00 PM 09:00 PM 10:00 PM 11:00 PM 1stY, 22 3 2 2 2 12 36 82 121 80 92 122 144 161 144 145 212 142 119 61 41 20 23 NORTHBOUND 2nd % 12 7 2 2 3 2 12 58 105 104 99 99 127 165 130 142 121 171 123 102 40 27 16 32 23 38 25 18 24 Hour Total DAILY TRAFFIC COUNT SUMMARY NORTHBOUND A.M. Peak Hour, Time: 08:15 AM Volume: A.M. "le Factor: 7.0% P.H.F. : A.M. "D" Factor: 100.0% P_M. Peak Hour, Time: 05:00 PM Volume: P.M. "K' Factor: 9.8% P.H.F. : P.M. "D" Factor: 100.0% BOTHWAY: NORTHBOUND and SOUTHBOUND A.M. Peak Hour, Time: 05:15 AM A.M. "K" Factor: 7.0% A.M. Hour "D" Factor: 100.0% P.M. Peak Hour, Time: P.M. "K' Factor: P.M. Hour "D" Factor: MECHANICAL COUNTS LOCATION: COUNT DATE: S. MIAMI AVE BTWNS8&9ST SOUTHBOUND BOTHWAY 3rd % 4th Y TOTAL TIME 1st % 2nd'14 3rd' 4th %4 TOTAL TOTAL 7 5 46 12:00 AM 0 0 0 0 0 46 3 1 14 01:00AM 0 0 0 0 0 14 0 2 6 02:00 AM 0 0 0 0 0 6 0 2 5 03:00 AM 0 0 0 0 0 5 1 4 10 04:00 AM 0 0 0 0 0 10 9 10 23 05:00 AM 0 0 0 0 0 23 34 32 90 06:00 AM 0 0 0 0 0 90 71 87 252 07:00 AM 0 0 0 0 0 252 135 124 446 08:00 AM 0 0 0 0 0 446 99 92 416 09:00 AM 0 0 0 0 0 416 100 109 388 10:00 AM 0 0 0 0 0 388 129 98 418 11:00 AM 0 0 0 0 0 418 116 109 474 12:00 PM 0 0 0 0 0 474 150 143 602 01:00 PM 0 • 0 0 0 0 602 151 110 552 02:00 PM 0 0 0 0 0 552 169 149 604 03:00 PM 0 0 0 0 0 604 151 128 545 04:00 PM 0 0 0 0 0 545 154 148 685 05:00 PM 0 0 0 0 0 685 109 109 483 06:00 PM 0 0 0 0 0 483 72 78 371 07:00 PM 0 0 0 0 0 371 47 42 190 08:00 PM 0 0 0 0 0 190 41 44 153 09:00 PM 0 0 0 0 0 153 97 10:00 PM 0 0 0 0 0 97 98 11:00 PM 0 0 0 0 0 98 6,968 24 Hour Total 0 6,968 SOUTHBOUND 485 A.M. Peak Hour, Time: 12:00 AM Volume: 0 0.90 A.M. "K" Factor: ERR P.H.F.: ERR A.M. "D" Factor: 0.0% 685 P.M. Peak Hour, Time: 12:00 PM Volume: 0 0.81 P.M. "K" Factor: ERR P.H.F.: ERR P.M_ '0" Factor: 0.0% Volume: P.H.F.: 05:00 PM Volume: 9.8% P.H.F.: 100.0% 485 0.90 685 0.81 • • • PROJECT NAME: Tragic Data Collection Notice to Proceed TIME 12:00 AM 01:00 AM 02:00 AM 03:00 AM 04:00 AM 05:00 AM 06:00 AM 07:00 AM 08:00 AM 09:00 AM 10:00 AM 11:00 AM 12:00 PM 01:00 PM 02:00 PM 03:00 PM 04:00 PM 05:00 PM 06:00 PM 07:00 PM 08:00 PM 09:00 PM 10:00 PM 11:00 PM 1 st % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NORTHBOUND 2nd Y. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3rd % 4th O 0 O 0 0 0 O 0 O 0 O 0 0 0 O 0 O 0 O 0 O 0 O 0 O 0 0 0 0 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 O 0 O 0 O 0 0 0 0 0 0 0 24 Hour Total DAILY TRAFFIC COUNT SUMMARY NORTHBOUND AM. Peak Hour, Time: A.M. "K" Factor: A.M. "0" Factor: P.M. Peak Hour, Time: P.M, "K" Factor: P,M. "D" Factor: BOTHWAY: NORTHBOUND and SOUTHBOUND A.M. Peak Hour, Time: 08:15 AM A.M. "K" Factor: 9.5% A.M. Hour "D" Factor: 100.0% MECHANICAL COUNTS LOCATION: SW 1 AVE BTWN SW 8 & 9 ST COUNT DATE; TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 AM Volume: 0 ERR P.H.F.: ERR 0.0% 12:00 PM Volume: 0 ERR P.H.F.: ERR 0,0°/n P.M. Peak Hour, Time: P.M. "K" Factor: P.M. Hour "0" Factor: 05:00 PM 9.0% 100.0% TIME 1st /4 12;00 AM 2 01:00 AM 7 02:00 AM 03:00 AM 04:00 AM 05:00 AM 06:00 AM 07:00 AM 08:00 AM 09:00 AM 10:00 AM 11:00 AM 12:00 PM 01:00 PM 02:00 PM 03:00 PM 04:00 PM 05:00 PM 06:00 PM 07:00 PM 08:00 PM 09:00 PM 10:00 PM 11:00 PM 3 2 1 4 14 32 70 103 62 65 79 81 98 56 70 109 104 65 27 36 26 23 SOUTHBOUND 2nd'/. 15 6 5 2 2 4 37 51 101 93 47 53 68 87 78 57 74 112 83 49 43 38 20 14 3rd % 4th % TOTAL 5 9 31 7 3 23 2 4 14 4 4 12 3 5 11 11 12 31 57 49 157 53 65 201 122 114 407 62 93 351 63 61 233 66 56 240 82 69 298 79 81 328 70 56 302 80 69 262 91 70 305 99 96 416 92 75 354 56 47 217 37 35 142 22 29 125 23 36 105 7 12 56 24 Hour Total 4,621 SOUTHBOUND A.M. Peak Hour, Time: 08:15 AM Volume: 440 A.M. "K" Factor: 9.5% P.H.F.: 0.90 A.M. "0" Factor: 100.0% P.M. Peak Hour, Time: 05:00 PM Volume: 416 P.M. 'K' Factor: 9.0% P.H.F.: 0.93 P,M. "D" Factor: 100.0% Volume: 440 P.H.F.: 0.90 Volume: 416 P.H.F,: 0.93 BOTHWAY TOTAL 31 23 14 12 11 31 157 201 407 351 233 240 296 328 302 262 305 416 354 217 142 125 105 56 4,621 • • • PROJECT NAME: Traffic Data Collection Notice to Proceed : EASTBOUND MECHANICAL COUNTS LOCATION: SW 9 ST W/O N. MIAMi AVE COUNT DATE: WESTBOUND BOTHWAY TIME 1st 14 2nd 14 3rd % 4th % TOTAL TIME 1 st % 2nd'4 3rd % 4th % TOTAL TOTAL 12:00 AM 0 0 0 0 0 12:00 AM 0 1 1 2 4 4 01:00 AM 0 0 0 0 0 01:00 AM 0 0 0 0 0 0 02:00 AM 0 0 0 0 0 02:00 AM 0 0 0 0 0 0 03:00 AM 0 0 0 0 0 03:00 AM 0 0 0 0 0 0 04:00 AM 0 0 0 0 0 04:00 AM 0 0 0 1 1 1 05:00 AM 0 0 0 0 0 05:00 AM 0 0 1 1 2 2 06:00 AM 0 0 0 0 0 06:00 AM 0 1 5 6 12 12 07:00 AM 0 0 0 0 0 07:00 AM 5 6 5 6 22 22 08:00 AM 0 0 0 0 0 08:00 AM 7 4 5 12 28 28 09:00 AM 0 0 0 0 0 09:00 AM 9 6 5 7 27 27 10:00 AM 0 0 0 0 0 10:00 AM 7 6 7 11 31 31 11:00AM 0 0 0 0 0 11:00AM 12 10 15 14 51 51 12:00 PM 0 0 0 0 0 12:00 PM 16 13 11 12 52 52 01:00 PM 0 0 0 0 0 01:00 PM 13 19 6 10 48 48 02:00 PM 0 0 0 0 0 02:00 PM 15 6 6 5 32 32 03:00 PM 0 0 0 0 0 03:00 PM 6 10 7 7 30 30 04:00 PM 0 0 0 0 0 04:00 PM 9 5 6 7 27 27 05:00 PM 0 0 0 0 0 05:00 PM 8 4 4 7 23 23 06:00 PM 0 0 0 0 0 06:00 PM 4 5 2 11 22 22 07:00 PM 0 0 0 0 0 07:00 PM 2 3 4 1 10 10 08:00 PM 0 0 0 0 0 08:00 PM 2 2 2 5 11 11 09:00 PM 0 0 0 0 0 09:00 PM 4 1 2 1 8 8 10:00 PM 0 0 0 0 0 10:00 PM 3 0 4 1 8 8 11:00 PM 0 0 0 0 0 11:00 PM 0 0 1 0 1 1 24 Hour Total 0 24 Hour Total 450 450 DAILY TRAFFIC COUNT SUMMARY EASTBOUND WESTBOUND A.M. Peak Hour, Time: 12:00 AM Volume: 0 A.M. Peak Hour, Time: 11:30 AM Volume: 58 A.M. "tV' Factor: ERR P.H.F.: ERR A.M. "IC Factor: 12.9% P.H.F.: 0.91 A.M. "0' Factor: 0.0% A.M. "D" Factor: 100.010 P.M. Peak Hour, Time: 12:00 PM Volume: 0 P,M. Peak Hour, Time: 12:30 PM Volume: 55 P.M. "K" Factor ERR P.H.F.: ERR P.M. "K" Factor: 12.2% P.H.F.: 0.72 P.M. "D" Factor: 0.0% P.M. "D" Factor: 100.0% BOTHWAY: EASTBOUND and WESTBOUND A.M. Peak Hour, Time: 11:30 AM Volume: 58 A.M. "tV Factor 12.9% P.H.F.: 0.91 A.M. Hour "D" Factor: 100.0% P.M. Peak Hour, Time: 12:30 PM Volume: 55 P.M. "K" Factor: 12.2% P.H.F.: 0.72 P.M. Hour "0" Factor: 100.0% • • • TURNING MOVEMENT COUNT DATA 8 5 2 11 9 16 15 CALC 10 7 6 12 CALC WE WB NB NB NB EB EB NB NB WB WB NB NB T RT LT T RT LT T T RT T RT LT T SW 9 ST SW 9 ST SMA SMA SMA SW 8 ST SW 8 ST SMA SMA SW 7 ST SW 7 ST SMA SMA SMA SMA SW 9 ST SW 9 ST SW 9 ST SMA SMA SW 8 ST SW 8 ST SMA SMA SW 7 ST SW 7 ST 07:00 AM 07:15 AM 30 3 4 51 1 89 30 209 44 10 293 75 7 22 52 156 07:01 AM 07:16 AM 31 4 3 52 1 91 31 207 47 9 294 82 7 25 53 167 07:02 AM 07:17 AM 31 5 3 51 1 91 31 200 46 10 287 87 6 24 53 170 07:03 AM 07:18 AM 32 5 5 52 1 95 32 197 47 10 286 83 5 25 54 167 07:04 AM 07:19 AM 33 5 5 50 2 95 33 199 46 9 287 85 5 25 54 169 07;05 AM 07:20 AM 32 5 6 53 2 98 32 203 49 9 293 86 4 27 54 171 07:06 AM 07:21 AM 31 4 6 51 2 94 31 204 48 7 290 81 4 29 50 164 07:07 AM 07:22 AM 32 4 6 52 2 96 32 202 47 9 290 80 4 28 51 163 07:08 AM 07:23 AM 28 4 6 56 3 97 26 201 53 7 289 81 4 28 53 166 07: 09 AM 07:24 AM 30 4 6 57 3 100 30 212 54 7 303 73 2 29 55 159 07:10 AM 07:25 AM 31 4 5 56 4 100 31 215 52 8 306 74 2 28 55 159 07:11 AM 07:26 AM 28 4 6 53 3 94 28 212 50 7 297 79 3 27 51 160 07:12 AM 07:27 AM 31 5 5 55 3 99 31 207 53 7 298 77 3 25 59 164 07:13 AM 07:28 AM 31 4 5 54 3 97 31 213 50 8 302 73 2 24 57 156 07:14 AM 07:29 AM 30 5 6 51 3 95 30 217 49 7 303 80 4 22 57 163 07:15 AM 07:30 AM 29 5 7 50 3 94 29 214 49 6 298 83 4 23 55 165 07:16 AM 07:31 AM 29 4 7 51 3 94 29 213 48 7 297 76 4 20 57 157 07:17 AM 07:32 AM 27 3 7 54 3 94 27 233 50 7 317 80 3 17 60 160 07:18 AM 07:33 AM 27 3 5 80 5 100 27 234 56 7 324 82 3 18 65 168 07:19 AM 07:34 AM 27 3 5 60 4 99 27 235 55 8 325 87 3 21 61 172 07:20 AM 07;35 AM 31 3 4 63 4 105 31 244 57 9 341 93 4 19 69 185 07:21 AM 07:36 AM 34 2 4 62 4 106 34 233 55 9 331 90 5 21 68 1$4 07:22 AM 07:37 AM 32 2 5 63 4 106 32 242 58 7 339 93 5 20 70 188 07:23 AM 07:38 AM 35 2 6 59 3 105 35 258 54 7 354 91 5 20 69 185 07:24 AM 07:39 AM 32 2 6 58 3 101 32 241 53 7 333 95 6 21 64 186 07:25 AM 07:40 AM 32 2 5 59 2 100 32 249 55 6 342 100 6 24 63 193 07:26 AM 07:41 AM 32 2 4 60 2 100 32 252 55 7 346 93 7 25 62 187 07:27 AM 07:42 AM 29 1 5 58 2 95 29 256 52 7 344 105 7 26 55 193 07:28 AM 07:43 AM 30 1 6 61 2 100 30 262 55 7 354 105 7 27 58 197 07:29 AM 07:44 AM 31 0 5 65 3 104 31 260 58 7 356 96 5 29 60 190 07:30 AM 07745 AM 35 0 4 70 3 112 35 282 63 7 387 106 5 28 70 209 07:31 AM 07:46 AM 40 0 4 72 3 119 40 283 66 6 395 105 5 32 74 216 07:32 AM 07:47 AM 42 1 4 70 3 120 42 273 65 6 386 106 5 33 74 218 07:33 AM 07:48 AM 41 1 4 65 1 112 41 275 60 6 382 101 5 35 66 207 07:34 AM 07:49 AM 41 1 5 69 1 117 41 272 64 6 383 98 5 34 71 208 07:36 AM 07:50 AM 41 1 5 67 1 115 41 275 62 6 384 101 4 33 70 208 07736 AM 07:51 AM 40 1 6 69 1 117 40 288 63 7 396 100 3 32 71 206 07:37 AM 07752 AM 42 1 5 87 1 116 42 298 61 7 408 102 4 32 71 209 07:38 AM 07:53 AM 40 2 4 67 1 114 40 299 61 8 408 102 4 36 65 207 07:39 AM 07:54 AM 41 2 4 69 1 117 41 298 63 8 410 96 3 38 66 203 07:40 AM 07:55 AM 42 2 4 68 1 117 42 304 62 8 416 100 3 36 68 207 07:41 AM 07:56 AM 44 2 5 67 1 119 44 304 62 • 7 417 104 3 34 72 213 07:42 AM 07:57 AM 49 2 4 69 1 125 49 315 63 8 435 94 3 35 77 209 07:43 AM 07:58 AM 52 3 3 68 1 127 52 310 63 8 433 91 3 38 77 209 07:44 AM 07759 AM 52 3 3 72 0 130 52 317 66 9 444 102 3 42 76 223 07:45 AM 08:00 AM 49 3 3 73 1 129 49 316 67 9 441 97 3 42 74 216 07:46 AM 08:01 AM 46 4 4 70 1 125 46 317 63 11 437 100 3 42 67 212 07:47 AM 08:02 AM 46 3 5 69 1 124 46 312 82 10 430 95 3 43 65 206 07:48 AM 08:03 AM 46 3 7 73 1 130 46 300 65 11 422 102 3 40 71 216 07:49 AM 08:04 AM 46 3 7 70 1 127 46 332 62 11 451 100 3 37 71 211 07:50 AM 08:05 AM 46 3 7 67 1 124 46 329 59 11 445 97 4 40 65 206 page 1 • • • TURNING MOVEMENT COUNT DATA 07:51 AM 08:06 AM 45 3 6 67 1 122 45 319 59 11 434 98 4 37 67 206 07:52 AM 08:07 AM 43 4 8 71 1 127 43 317 63 12 435 99 4 37 69 209 07:53 AM 08:08 AM 45 3 8 74 2 132 45 295 66 11 417 98 5 35 76 214 07:54 AM 08:09 AM 43 3 9 75 2 132 43 295 65 13 416 114 5 34 74 227 07:55 AM 08:10 AM 47 3 9 78 2 139 47 305 68 13 433 105 5 32 83 225 07:56 AM 08:11 AM 48 4 8 83 2 145 48 311 71 16 446 107 3 36 83 229 07:57 AM 08:12 AM 50 4 8 $3 2 147 50 321 72 15 458 114 4 34 88 240 07:58 AM 08:13 AM 49 3 8 B7 2 149 49 315 73 17 454 114 4 37 85 240 07:59 AM 08:14 AM 52 3 8 83 2 148 52 321 68 18 459 112 5 37 83 237 08:00 AM 08:15 AM 58 3 9 83 1 154 58 338 68 18 480 108 5 38 88 239 08:01 AM 08:18 AM 55 2 8 89 1 155 55 349 73 18 495 110 5 37 91 243 08:02 AM 08:17 AM 56 3 7 91 1 158 56 372 76 18 522 114 6 35 97 252 08:03 AM 08:18 AM 57 4 7 89 1 158 57 387 75 18 537 107 6 40 92 245 08:04 AM 08:19 AM 57 4 7 92 1 161 57 366 77 19 519 113 7 42 92 254 08:05 AM 08:20 AM 58 4 7 95 1 165 58 378 81 18 535 115 6 40 99 260 08:06 AM 08:21 AM 59 4 7 91 1 162 59 386 76 19 640 121 7 43 92 263 08:07 AM 08:22 AM 63 4 5 86 1 159 63 391 72 18 544 122 7 44 91 264 08:08 AM 08:23 AM 65 4 5 92 0 166 65 408 77 19 569 122 6 41 101 270 08:09 AM 08:24 AM 66 4 4 102 0 176 66 432 89 17 604 115 6 45 110 276 08:10 AM 08:25 AM 63 4 6 112 0 185 63 426 98 18 605 116 6 48 113 283 08:11 AM 08:28 AM 59 3 7 112 0 181 59 425 98 19 599 110 6 49 106 271 08:12 AM 08:27 AM 57 3 9 115 0 184 57 433 99 19 608 104 5 49 107 285 08:13 AM 08:28 AM 60 4 9 117 0 190 60 441 102 19 622 104 6 45 117 272 08:14 AM 08:29 AM 64 4 9 115 0 192 64 442 99 20 625 104 7 40 123 274 08:15 AM 08:30 AM 59 4 9 117 0 189 59 442 101 20 622 106 7 40 120 273 08:16 AM 08:31 AM 59 4 9 124 0 196 59 436 106 22 623 106 7 39 126 278 08:17 AM 08:32 AM 59 3 9 123 0 194 59 446 104 22 631 113 6 39 124 282 08:18 AM 08:33 AM 61 2 8 126 0 197 61 451 105 23 640 113 6 34 132 285 08:19 AM 08:34 AM 59 2 7 129 0 197 59 454 108 23 644 119 7 35 132 293 08:20 AM 08:35 AM 60 3 8 127 0 198 60 458 107 23 648 110 7 35 132 284 08:21 AM 08:36 AM 58 3 8 129 0 198 58 463 110 22 653 107 7 35 133 282 08:22 AM 08:37 AM 58 3 9 131 0 201 58 470 112 22 662 112 8 34 136 290 08:23 AM 08:38 AM 59 3 9 129 0 200 59 471 109 23 662 112 8 36 132 288 08:24 AM 08:39 AM 68 3 9 119 0 199 68 469 100 22 659 114 9 35 133 291 08:25 AM 08:40 AM 66 3 8 109 0 186 66 464 91 21 642 116 10 34 123 283 08:26 AM 08:41 AM 67 3 7 104 0 181 67 461 89 18 635 118 11 32 124 285 08:27 AM 08:42 AM 61 3 8 107 1 180 61 458 92 18 629 134 11 32 121 298 08:28 AM 08:43 AM 59 2 8 104 1 174 59 458 90 16 623 135 10 35 114 294 08:29 AM 013:44 AM 56 2 8 106 1 173 56 459 94 14 623 137 8 37 113 295 08:30 AM 08:45 AM 61 2 7 99 2 171 61 455 85 16 617 140 9 40 106 295 08:31 AM 08:46 AM 62 3 7 94 3 169 62 455 85 12 614 139 9 41 106 295 08:32 AM 08:47 AM 62 3 8 95 3 171 62 451 86 12 611 141 9 41 107 298 08:33 AM 08:48 AM 63 3 8 95 4 173 63 454 88 10 615 141 9 47 104 301 08:34 AM 08:49 AM 66 5 8 89 4 172 66 453 85 9 613 143 7 46 105 301 08:35 AM 08:50 AM 66 4 9 92 4 175 66 451 87 9 613 152 8 49 104 313 08:36 AM 08:51 AM 68 4 10 96 4 182 68 456 89 11 624 149 9 47 110 315 08:37 AM 08:52 AM 71 4 9 103 4 191 71 444 96 11 622 146 7 47 120 320 08:38 AM 06:53 AM 66 4 9 98 4 181 66 430 91 11 598 146 8 54 103 311 08:39 AM 08:54 AM 62 4 9 99 5 179 62 452 92 11 617 146 8 49 105 308 08:40 AM 08:55 AM 68 4 8 102 5 187 68 443 94 12 617 150 7 47 115 319 08:41 AM 08:56 AM 72 4 8 101 5 190 72 457 94 11 634 152 7 53 113 325 08:42 AM 0$;57 AM 76 4 6 100 4 190 76 449 93 11 629 134 8 57 112 311 08:43 AM 08:58 AM 76 4 6 96 5 187 76 458 90 10 634 133 8 54 112 307 08:44 AM 08' 59 AM 75 4 7 98 5 189 75 463 92 10 640 138 8 53 114 313 08:45 AM 09;00 AM 78 4 7 102 5 196 78 457 98 8 641 137 7 51 125 320 MAX 201 662 325 58 3 9 131 0 8:22 58 470 112 22 8:22 152 7 53 113 8:41 page 2 • TURNING MOVEMENT COUNT DATA 8 5 2 11 9 16 15 CALC 10 7 6 12 CALC WB WB NB NB NB EB EB NB NB WB WB NB NB T RT LT T RT LT T T RT T RT LT T SW 9 ST SW 9 ST SMA SMA SMA SW 8 ST SW 8 ST SMA SMA SW 7 ST SW 7 ST SMA SMA SMA SMA SW 9 ST SW 9 ST SW 9 ST SMA SMA SW 8 ST SW 8 ST SMA SMA SW 7 ST SW 7 ST 04:00 PM 04:15 PM 1 21 4 107 0 133 48 164 122 6 340 178 12 108 62 360 04:01 PM 04:16 PM 1 21 4 117 0 143 53 177 131 7 368 195 12 121 83 391 04:02 PM 04:17 PM 1 22 4 120 0 147 45 157 134 8 344 197 14 120 59 390 04:03 PM 04:18 PM 1 21 2 123 0 147 48 162 137 7 354 208 12 124 61 405 04:04 PM 04:19 PM 0 19 2 131 0 152 48 167 143 7 365 217 14 124 67 422 04:05 PM 04:20 PM 0 15 1 136 0 152 52 181 144 7 384 208 12 121 75 416 04:06 PM 04:21 PM 0 17 2 131 0 150 44 160 141 7 352 201 14 126 59 400 04:07 PM 04:22 PM 0 19 2 131 0 152 45 163 143 7 358 216 15 125 63 419 04:08 PM 04:23 PM 0 18 2 137 0 157 50 167 147 8 372 223 14 116 81 434 04:09 PM 04;24 PM 0 16 2 132 0 150 49 179 140 8 376 218 14 110 79 421 04:10 PM 04;25 PM 0 14 2 135 0 151 45 168 141 8 362 208 12 117 69 406 04:11 PM 04:26 PM 0 16 3 130 0 149 44 169 137 9 359 215 11 118 63 407 04:12 PM 04:27 PM 0 14 3 131 0 148 44 173 136 9 362 228 11 103 77 419 04:13 PM 04:28 PM 0 14 2 131 0 147 44 182 136 9 371 235 10 97 83 425 04:14 PM 04:29 PM 0 14 2 134 0 150 40 163 142 6 351 208 10 99 83 400 04:15 PM 04:30 PM 0 14 2 129 0 145 41 176 138 5 360 200 7 105 74 386 04:16 PM 04:31 PM 0 14 3 124 0 141 37 179 134 4 354 201 7 94 77 379 04:17 PM 04:32 PM 0 16 3 126 0 145 37 192 139 3 371 197 6 96 80 379 04:18 PM 04:33 PM 0 21 3 124 0 148 34 182 142 3 361 173 6 101 75 355 04:19 PM 04:34 PM 0 24 3 122 0 149 36 185 141 5 367 177 4 107 70 358 04:20 PM 04: 35 PM 0 31 3 115 0 149 34 188 141 5 368 192 4 106 69 371 04:21 PM 04:35 PM 0 31 3 111 0 145 37 201 138 4 380 195 4 110 65 374 04:22 PM 04:37 PM 0 34 4 108 0 146 35 187 137 5 364 188 4 113 59 364 04:23 PM 04:38 PM 0 35 4 104 0 143 33 181 133 6 353 191 4 119 47 361 04:24 PM 04:39 PM 1 36 4 103 0 144 33 185 132 7 357 212 5 117 48 382 04:25 PM 04:40 PM 1 36 4 102 0 143 34 198 131 7 370 214 6 105 60 385 04:26 PM 04:41 PM 1 37 3 107 0 148 33 191 138 6 368 193 7 113 58 371 04:27 PM 04:42 PM 1 38 3 103 0 145 32 193 133 8 366 197 12 119 46 374 04:28 PM 04:43 PM 1 43 4 103 0 151 34 204 138 8 384 202 13 113 59 387 04:29 PM 04:44 PM 1 43 4 101 0 149 37 214 136 8 395 201 14 120 53 388 04:30 PM 04:45 PM 1 46 5 105 0 157 33 194 143 8 378 193 14 126 50 383 04:31 PM 04:46 PM 1 47 5 107 0 160 36 194 146 8 384 184 14 132 50 380 04:32 PM 04:47 PM 1 47 7 107 0 162 40 190 146 8 384 189 13 131 55 388 04:33 PM 04:48 PM 1 41 8 111 0 161 46 200 144 8 398 194 16 129 61 400 04:34 PM 04:49 PM 1 38 10 107 0 156 41 184 138 7 370 191 17 129 50 387 04:35 PM 04:50 PM 1 33 10 110 0 154 40 191 136 7 374 191 19 125 51 386 04138 PM 04:51 PM 1 31 9 114 0 155 40 192 137 8 377 204 18 113 64 399 04:37 PM 04:52 PM 1 26 8 116 0 151 41 199 135 7 382 200 18 112 64 394 04:38 PM 04:53 PM 1 24 8 114 0 147 36 193 133 5 367 186 18 112 57 373 04:39 PM 04:54 PM 0 25 6 112 0 145 37 191 132 5 365 184 18 110 59 371 04:40 PM 04:55 PM 0 26 9 107 0 142 38 197 128 5 368 195 18 110 56 379 04:41 PM 04:56 PM 0 25 10 101 0 138 37 197 121 5 360 207 19 105 53 384 04:42 PM 04:57 PM 0 24 11 100 0 135 36 179 121 3 339 190 15 108 49 362 04:43 PM 04:58 PM 1 22 10 105 0 138 33 171 123 4 331 197 14 115 41 367 04:44 PM 04:59 PM 1 22 10 106 0 139 32 183 124 4 343 198 13 106 50 367 04:45 PM 05:00 PM 1 20 9 109 0 139 32 194 125 4 355 208 13 104 53 378 04:46 PM 05:01 PM 1 21 8 111 0 141 28 181 128 4 341 211 14 108 48 381 04:47 PM 05:02 PM 1 21 6 117 0 145 28 189 134 4 356 220 15 109 54 398 04:48 PM 05:03 PM 1 22 5 116 1 145 28 193 134 4 359 226 13 105 57 401 04:49 PM 05:04 PM 1 23 3 116 1 144 30 206 136 3 375 222 14 105 61 402 04:50 PM 05:05 PM 1 24 4 125 1 155 31 190 146 3 370 218 12 116 61 407 page 3 • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: OPERATIONAL ANALYSIS J. AHLSTEDT 6/22/04 AM PEAK I-iR SW 1 AVE South -bound FDOT FUTURE W/O PROJECT Project ID: PREMIERE TOWERS Description of Arterial Analysis period length 0.25 hr Seg. Cross street name Length Urban Free of street flow segment class speed (mi) (mph) Running time Section (sec) 0 SW 3 ST 1 SW 7TH STREET 2 SW 8TH STREET 3 CORAL WAY 0.25 0.06 0.31 2 2 2 40 40 40 27.5 6.9 31.4 1 2 3 Seg Cycle Green length ratio C g/C Intersection Delay Estimates v/c Lane ratio cap. X PVG Arr. if type Input AT T fac- tor Unit Init. Cntrl. Other Inter. ext. queue delay delay LOS (sec) (veh) (sec) (sec) 1 100.0 0.510 0.301 1841 2 100.0 0.230 0.242 830 3 60.0 0.267 0.714 475 3 1.000 3.0 3 0.963 3.0 3 0.980 3.0 0 0 0 14.3 31.5 24.9 0.0 0.0 0.0 B C Running Seg. Sect. time (sec) Arterial Level of Service Inter. control. delay (sec) Other delay (sec) Sum of Sum of Arterial time by length by Arterial LOS by section section speed section (sec) (mi) (mph) 1 1 27.5 2 2 6.9 3 3 31.4 14.3 31.5 24.9 0.0 0.0 0.0 41.8 38.4 56.3 0.25 0.06 0.31 21.5 5.6 19.8 Total travel time (x) _ 136.5 Total length (y) = 0.62 Total travel speed, Sa = 3600 x (y),/(x) - 16.4 Total urban street LOS (Exhibit 15-2) = E sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\S7W1AFA.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\S8W1AFA.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\CWSW1AFA.hcs • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL ANALYSIS J. AHLSTEDT 6/22/04 PM PEAK HR SW 1 AVE South -bound FDOT FUTURE W/O PROJECT TOWERS Analysis period length Description of Arterial 0.25 hr Seg. Cross street name Length Urban Free of street flow segment class speed (mi) (mph) Running time (sec) Section 0 SW 3 ST 1 SW 7TH STREET 2 SW 8TH STREET 3 CORAL WAY 0.25 0.06 0.31 2 2 2 40 40 40 27.5 6.9 31.4 1 2 3 Intersection Delay Estimates Seg Cycle Green v/c Lane length ratio ratio cap. C g/C X c PVG Arr. if type Input AT I fac- tor Unit Init. Cntrl. Other Inter. ext. queue delay delay LOS (sec) (veh) (sec) (sec) 1 2 3 80.0 80.0 60.0 0.438 0.416 1579 0.475 0.364 1715 0.317 0.278 565 3 1.000 3.0 3 0.913 3.0 3 0.939 3.0 0 15.7 0 13.5 0 15.6 0.0 0.0 0.0 E B B Arterial Level of Service Running Seg. Sect time (sec) Inter. control. delay (sec) Other delay (sec) Sum of Sum of time by length by Arterial section section speed (sec) (mi) (mph) Arterial LOS by section 1 1 27.5 2 2 6.9 3 3 31.4 15.7 13.5 15.6 0.0 0.0 0.0 43.2 20.4 47.0 0.25 0.06 0.31 20.9 10.6 23.7 Total travel time (x) Total length (y) _ Total travel speed, Sa = 3600 x (y)/(x) Total urban street LOS (Exhibit 15-2) = 110.6 0.62 20.2 D sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJA.MIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\S7W1AFP.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\FUTURE\SSWIAFP.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSTS\LOS\FUTURE\CWSWIAFP.hcs • • • HCS2000: Urban Streets Release 4.1d OPERATIONAL ANALYSIS Analyst: J. AHLSTEDT Agency/Ce.: Date Performed: 6/22/04 Analysis Time Period: AM PEAK HR Urban Street: SW/SE 8 ST Direction of Travel: East -bound Jurisdiction: FDOT Analysis Year: FUTURE WITH PROJECT Project ID: PRFMTERE TOWERS Description of Arterial Analysis period length 0.25 hr Seg. Cross street name Length Urban Free of street flow Running segment class speed time (rni) (mph) (sec) Sect.iOn 0 SW 2 AVE 1 SW 1ST AVENUE 2 MIAMI AVENUE 0.10 2 40 11.5 1 0.10 2 40 11.5 2 Intersection Delay•Estimates Seg Cycle Green v/c Lane PVG Arr. 1 Unit Init. Cntrl. Other inter. length ratio ratio cap. if type lac- ext. queue delay delay LOS C g/C X c Input AT tor (sec) (veh) (sec) (sec) 1 100.0 0.690 1.061 2953 2 100.0 0.710 0.854 3081 1.000 0.0 0.090 0.0 51.2 0.0 11.0 0.0 Arterial Level of Service Inter. Sum of Sum of Arterial Running control. Other time by length by Arterial LOS by Seg. Sect. time delay delay section section speed section (sec) (sec) (sec) ;sec) (mi) (mph) 1 1 11.5 51.2 0.0 62.7 0.10 2 2 11.5 11.0 0.0 22.5 0.10 5.7 16_0 Total travel time (x) __ 85.2 sec Total length (y) = 0.20 miles Iota' travel speed, Sa - 3600 x (y) / (x) = 8.4 mph Total urban street LOS (Exhibit 15-2) = F Intersection Files in the Analysis F E 1: D:\BERMELLO AJAMTL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S8WIAPA.hcs 2: D:\BERMELLO AJAMIL\PRE 4Tu RM TONERS\TUNA .YSIS\IOS\PROJECT\SBMATA.5cs • • • HCS2000: Urban Streets Release 4.1d OPERATIONAL ANALYSIS Analyst: J. AHLSTEDT Agency/Cc.: Date Performed: 6/22/04 Analysis Time Period: P4 PEAK HR Urban Street: SW/SE 8 ST Direction of Travel: East -bound Jurisdiction: FDOT Analysis Year: FUTURE WITH PROJECT Project ID: PREMIERE TOWERS Description of Arterial Analysis period length 0.25 hr Seg. Cross street name Length Urban Free c street flow segment_ class speed (mi) (mph) Running time (sec) Section 0 SW 2 AVE 1 SW 1ST AVENUE 2 MIAMI AVENUE 0.10 2 0.10 2 40 11.5 40 11.5 Intersection Delay Estimates 1 2 Seg Cycle Green v/c Lane PVC Arr. 1 Unit Init. Cntri. Other inter. length ratio ratio cap. if type fac- ext. queue delay delay LOS C g/C X c Input AT tor (sec) (veh) (sec) (sec) 1 80.0 0.425 1.074 1819 3 1.000 0.0 0 67.2 0.0 2 80.0 0.425 1..083 1.843 3 0.090 0.0 0 61.5 0.0 Arterial Level of Service Inter. Sum of Sum of Arterial Running control. Other time by length by Arterial LOS by Seg. Sect. time delay delay section section speed section (sec) (sec) (Sec; sec) (mi) (mph) 1 1 11.5 2 2 11.5 67.2 0.0 61.5 0.0 78.7 0.10 73.0 0.10 4.6 a 9 Total travel time (x) = 151.7 sec Total length {y) = 0.20 miles Total travel .speed, Sa - 3600 x (y)/(x) = 4.7 mph Total urban street LOS (Exhibit 15-2) - F Intersection Files in the Analysis F F 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSTS\T.,OS\PROJECT\S8W1APP.hcs 2: D:\BERMELLO RJ MTI.:\PR.F,MTERE TOIn?ERS\ANALYST_S\LOS\PROJw CT\SBM71PP.tes • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL ANALYSIS J. AHLSTEDT 6/22/04 AM PEAK HR MIAMI AVE North -bound FDOT FUTURE WITH TOWERS Analysis period length PROJECT Description of Arterial 0.25 hr Seg. Cross street name Length Urban of street segment class (mi) Free flow Running speed time Section (mph) (sec) 0 15TH RD 1 CORAL WAY 2 SE 8TH STREET 3 SE 7TH STREET 0.25 0.31 0.06 2 2 2 40 40 40 27.5 31.4 6.9 1 2 3 Intersection Delay Estimates Seg Cycle Green v/c Lane length ratio ratio cap. C g/C X c PVG Arr. if type Input AT I Unit fac- ext. tor (sec) Init. Cntrl. Other Inter. queue delay delay LOS (veh) (sec) (sec) 1 60.0 0.300 0.691 929 2 100.0 0.210 1.283 904 3 100.0 0.600 0.532 2033 3 1.000 3.0 3 0.662 3.0 3 0.090 3.0 0 0 0 20.8 0.0 172.6 0.0 11.8 0.0 C F 3 Running Seg. Sect. time (sec) Arterial Level of Service Inter. control, delay (sec) Other delay (sec) Sum of Sum of Arterial time by length by Arterial LOS by section section speed section (sec) (mi) (mph) 1 A 2 2 3 3 27.5 31.4 6.9 20.8 172.6 11.8 0.0 0.0 0.0 48.3 204.1 18.7 0.25 0.31 0.06 18.7 5.5 11.6 D F F Total travel time (x) _ Total length (y) = Total travel speed, Sa = 3600 x (y)/(x) = Total urban street LOS (Exhibit 15-2) = 271.0 0.62 8.2 F sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\CWMAPA.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S8MAPA.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7MAPA.hcs • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL ANALYSIS J. AHLSTEDT 6/22/04 PM PEAK HR MIAMI AVE North -bound FDOT FUTURE WITH TOWERS Analysis period length PROJECT Description of Arterial 0.25 hr Seg. Cross street name Length Urban Free of street flow segment class speed (mi) (mph) Running time Section (sec) 0 15TH RD 1 CORAL WAY 2 SE 8TH STREET 3 SE 7TH STREET 0.25 0.31 0.06 2 2 2 40 40 40 27.5 31.4 6.9 1 2 3 Seg Cycle length C Green ratio g/C v/c ratio X Intersection Delay Estimates Lane cap. c PVC Arr. if type Input AT I fac- tor Unit ext. (sec) Init. Cntrl. queue delay (veh) (sec) Other Inter. delay LOS (sec) 1 60.0 2 80.0 3 80.0 0.283 0.703 745 0.475 0.663 2069 0.438 0.632 1482 3 1.000 3.0 3 0.646 3.0 3 0.697 3.0 0 0 0 22.3 16.6 18.1 0.0 0.0 0.0 C B B Running Seg. Sect. time (sec) Arterial Level of Service Inter. control. delay (sec) Other delay (sec) Sum of Sum of Arterial time by length by Arterial. LOS by section section speed section (sec) (mi) (mph) 1 2 3 1 2 3 27.5 31.4 6.9 22.3 16.6 18.1 0.0 0.0 0.0 49.8 48.1 25.0 0.25 0.31 0.06 18.1 23.2 8.6 D C F Total travel time (x) Total length (y) Total travel speed, Sa = 3600 x (y)/(x) - Total urban street LOS (Exhibit 15-2) - 122.8 0.62 18.2 D sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\CWMAPP.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S8MAPP.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7MAPP.hcs • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Tirne period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL ANALYSIS J. AHLSTEDT 6/22/04 AM PEAK HR SW/SE 7 ST West -bound FDOT FUTURE WITH TOWERS Analysis perjad length PROJECT Description of Arterial 0.25 hi Seg. Cross street name 0 BRICKI LL AVE] 1 MIAMI AVENUE 2 SW 1ST AVENUE Length Urban Free of street flow Running segment class speed time (mi) (mph) (sec) 0.20 2 40 2.3.0 0.10 2 40 11.5 Section 1 2 Intersection Delay Estimates Seg Cycle Green vie Lane length ratio ratio cap. C g/C X c PVC Arr. if type input AT I fac- tor. Unit Init. Cntri. Other Inter. ext. queue delay delay LOS (sec) (veh) (sec) (sec) 1 100.0 0.310 0.700 1050 2 100.0 0.380 1.021 1841 Running Seg. Sect. time (sec) 3 1.000 0.0 3 0.650 0.0 0 34.3 0.0 0 0 53.4 0.0 D Arterial Level of Service Inter. control. delay (sec) Other deiav (sec) Sum of Sutra of Arterial time by length by Arterial LOS by section section speed section (sec) (mi) (mpg) 1 1 23.0 2 2 11.5 34.3 0.0 53.4 0.0 57.3 64.9 Total travel, time (x) Total length (y) Total travel speed, Se - 3600 x (y)/(x) - Total urban street LOS 0.20 12.6 0.10 5.6 122.1 0.30 8.8 (Exhibit 15-2) = E sec miles mph intersection Files .in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7MAPA.hcs 2: D:V3ERMELLO AJAM1L\PREMIERT TOWERS\ANALYSIS\LO5\P OJECT\S7 'IAPA.hcw • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL J. AHLSTEDT 6/22/04 PM PEAK HR SW/SE 7 ST West --bound FDOT FUTURE WITH TOWERS Analysis period length ANALYSIS PROJECT Description of Arterial 0.2.E hr Seg. Cross street name 0 BRICKELL AVE 1 MIAMI AVENUE 2 SW 1ST AVENUE Seg Cycle Green length ratio C g/C Length of segment (mi) Urban Free street flow Running class speed time Section (mph) (sec) 0.20 2 0.10 2 40 40 23.0 11.5 1 2 Intersection Delay Estimates v/c Lane ratio cap. Xc PVG Arr. I if type fac- Input AT tor Unit Init. Cntri. Other Inter. ext. queue delay delay LOS (sec) (veh) (sec) (sec) 1 80.0 0.450 0.919 1525 2 80.0 0.450 1.441 2184 3 1.000 0.0 3 0.274 0.0 0 31.1 0.0 0 221.2 0.0 Arterial Level of Service Running Seg. Sect_ time (sec) Inter. control. delay (sec) Other delay (Sec) C F Sum of Sum. of Arterial time by length by Arterial LOS by section section speed section (sec) (mi) (mph) 1 23.0 31.1 0.0 2 11.5 221.2 0.0 54.1 232.7 0.20 13.3 0.1.0 1.5 Total Total Total Total travel time (x) length (y) travel. speed, Sa = 3600 x urban street LOS (Exhibit (y1 / (x) 1.5-2) = 286.7 0.30 3.8 F Intersection Files in the sec miles mph Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7MAPP.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TONERS\ANALYSIS\LOS\PROJECT\S7'W'1APP.hcs • • • HCS2000: Urban Streets Release 4.1d Analyst: Agency/Co.: Date Performed: Analysis Time Period: Urban Street: Direction of Travel: Jurisdiction: Analysis Year: Project ID: PREMIERE OPERATIONAL J. AHLSTEDT 6/22/04 AM PEAK HR SW 1 AVE South -bound FDOT FUTURE WITH TOWERS Analysis period length ANALYSIS PROJECT Description of Arterial 0.25 hr Seg. Cross street name Length urban Free of street flow segment class speed (mi) (mph) Running time Section (sec) 0 SW 3 ST 1 SW 7TH STREET 2 SW 8TH STREET 3 CORAL WAY 0.25 0.06 0.31 2 2 2 40 40 40 27.5 6.9 31.4 1 2 Seg Cycle length C Green ratio g/C v/c ratio X Intersection Delay Estimates Lane cap. c PVG Arr. if type Input AT I fac- tor Unit ext. (sec) Init. Cntrl. Other queue delay delay (veh) (sec) (sec) Inter. LOS 1 100.0 0.510 0.342 1841 2 100.0 0.230 0.507 830 3 60.0 0.267 0.743 475 3 1.000 3.0 3 0.949 3.0 3 0.852 3.0 0 0 0 14.6 34.0 25.5 0.0 0.0 0.0 B C C Running Seg. Sect. time (sec) Arterial Level of Service Inter. control. Other delay delay (sec) (sec) Sum of Sum of time by length by Arterial section section speed (sec) (mi) (mph) Arterial. LOS by section 1 2 3 1 2 3 27.5 6.9 31.4 14.6 34.0 25.5 0.0 0.0 0.0 42.1 40.9 56.9 0.25 0.06 0.31 21.4 5.3 19.6 Total travel time (x) Total length (y) Total travel speed, Sa = 3600 x (y)/(x) Total urban street LOS (Exhibit 15-2) 140.0 0.62 15.9 E sec miles mph Intersection Files in the Analysis 1: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7WIAPA.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S8W1APA.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\CWSW1APA.hcs • • • HCS2000: Urban Streets Release 4.1d OPERATIONAL ANALYSIS Analyst: J. AHLSTEDT Agency/Co.: Date Performed: 6/22/04 Analysis Time Period: PM PEAK HR Urban Street: SW 1 AVE Direction of Travel: South -bound Jurisdiction: FDOT Analysis Year: FUTURE WITH PROJECT Project ID: PREMIERE TOWERS Description of Arterial Analysis period length 0.25 hr Seg. Cross street name Length Urban Free of street flow Running segment class speed time Section (mi) (mph) (sec) 0 SW 3 ST 1 SW 7Th STREET 0.25 2 40 27.5 1 2 SW 8TH STREET 0.06 2 40 6.9 2 3 CORAL WAY 0.31 2 40 31.4 3 Intersection Delay Estimates Seg Cycle Green v/c Lane PVG Arr. I Unit Init. Cntrl. Other Inter. length ratio ratio cap. if type fac- ext. queue delay delay LOS C g/C X c Input AT tor (sec) (veh) (sec) (sec) 1 80.0 0.438 0.416 1579 3 1.000 3.0 0 15.7 0.0 B 2 80.0 0.475 0.364 1715 3 0.913 3.0 0 13.5 0.0 B 3 60.0 0.317 0.274 565 3 0.939 3.0 0 15.6 0.0 B Arterial Level of Service inter. Sum of Sum of Arterial Running control. Other time by length by Arterial LOS by Seg. Sect. time delay delay section section speed section (sec) (sec) (sec) (sec) (mi) (mph) 1 1 27.5 15.7 0.0 43.2 0.25 20.9 2 2 6.9 13.5 0.0 20.4 0.06 10.6 3 3 31.4 15.6 0.0 47.0 0.31 23.7 Total travel time (x) = 110,5 sec Total length (y) = 0.62 miles Total travel speed, Sa = 3600 x (y)/(x) = 20.2 mph Total urban street LOS {Exhibit 15-2) -- D Intersection Files in the Analysis 1: D:\BERMELLQ AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\S7W1APP.hcs 2: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSTS\LOS\PROJECT\S8WIAPP.hcs 3: D:\BERMELLO AJAMIL\PREMIERE TOWERS\ANALYSIS\LOS\PROJECT\CWSWIAPP.hcs