HomeMy WebLinkAboutSite Utility Study•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, FL 33145
GALLERY ART
PROPOSED CONDOMINIUM TOWER
SITE UTILITY STUDY
MAY 2004
Civil and Environmental Engineering • Permitting and Management
1
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
TABLE OF CONTENTS
305.858.8100 PH • 305.858.4760 FAX
Page
1. General 3
2. Storm Drainage System 4
3. Water Distribution System 5
4. Sewer Collection System 6
5. Solid Waste Generation 76
EXHIBITS:
Location Map 10
Storm Drainage Calculations 12
"C" MD-WASAD Water Atlas 15
MD -Sewer Atlas 16
Proposed Water Use Calculations 17
DERM Pump Station Report 18
Solid Waste Generation Calculations 20
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27°' Avenue, Suite 300
Miami, FL 33145
GALLERY ART
SITE UTILITY STUDY
1. General
A. Project Location and Size
305.858.8100 PH • 305.858.4760 FAX
The proposed project consists of a Residential Condominium Tower to be constructed at an
approximately 1.28 acre site located at 333 NE 24th Street, Miami 1 FI. (See Exhibit A).
The project is bounded to the north by NE 25th Street, to the south by NE 24th Street, and to the
west Biscayne Boulevard, all being in Section 30, Township 53 South, Range 42 East, Miami -
Dade County, Florida.
The site is partially occupied by single family homes, in its present condition. The homes will be
razed for the new development.
B. Proposed project build out:
The proposed project build -out consists of 171 residential condominium units.
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
2. Storm Drainage System
305.858.8100 PH • 305.858.4760 FAX
A. Existing Storm Drainage System:
Roadway storm drainage systems presently exist along the streets surrounding the proposed
project. These systems are owned and maintained by the City of Miami. The site, in its existing or
proposed conditions, does not or will not contribute any significant amount of storm water run-off
into the Public Roadway System. No significant improvements to the existing Roadway Drainage
System are expected as a result of this project other than some possible inlet modifications
associated with the street of sidewalk improvements,
B. Proposed On -Site Storm Drainage System:
The proposed storm drainage system to serve this project will be designed to fully contain on -site
the storm water run-off and to meet the Miami. Dade County Department of Environmental
Resources Management, (DERM) Environmental Resources Permit (ERP) requirements and the
Florida Department of Transportation (FDOT). This will be accomplished by means of deep
drainage wells. No offsite run-off will be generated from the site.
The total contributing site area and 30% of the building wall area exposed to the rain will be
included in the Disposal Well System design calculations. An impervious coefficient of 0.95 will be
used for the purpose of this study.
Based on local knowledge experienced well drilling company for other projects in the vicinity, an
approximate well discharge rate 750 gpm per foot of head can be expected.
Storm water from roofs, internal driveways, walkways and parking areas will be conveyed by
means of a collection system to sediment tanks sized to meet the detention volume requirements
prior to discharging into the Well System, Additional Water Quality pre-treatment and Pollution
Retardant Baffles at the catch basins will be provided at areas subject to vehicle traffic.
C. Required number of Wells:
The proposed wells will be designed to maintain the site dry during the 5 year-1 day storm, to
keep flooding below the perimeter grades during the 25 year-3 day storm and to keep flooding
below the minimum flood elevation during the 100 year- 3 day storm.
Based on the attached calculations, a total of 4 storm drainage wells are required to provide full
on -site retention for this project depending on the actual yields obtained during the well drilling
operations.
For Well Disposal System calculations refer to attached Exhibit "B",
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, FL 33145
3. Water Distribution System
A. Existing Water System Facilities:
Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following
domestic water facilities in the vicinity of this project:
• An existing 12 inch water main on NE 25th Street that runs along the entire front side of
the property.
• An existing 12-inch water main on NE 24th Street that runs along the entire front side of
the property.
= An existing 16- inch watermain on Biscayne Boulevard.
B. Required Water System Improvements:
It Appears the existing Watermain System is adequate and additional offsite system
improvements will not be necessary for the construction of this project.
The proposed project should connect to the 12 inch watermain on NE 25th Street to obtain
Domestic Water, Fire Protection and Landscape Irrigation service.
C. Anticipated water use:
The water use requirements for this project are calculated based on the build -out information
previously described.
An additional flow demand of 42,750 GPD (250 GPD/Unit) is expected from this project.
For determination of anticipated flows see Exhibit "C".
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
305.858.8100 PH • 305.858.4760 FAX
4. Sewer Collection System
A. Existing Sanitary Sewer System Facilities:
Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following
sanitary sewer facilities in the vicinity of this project:
• An existing 8-inch gravity sewer line along NE 25th Street that runs along the entire front
of this property. This line collects all the sanitary flows from the general area and directs
them to Miami -Dade Water and Sewer Department Pump Station # 02 located in
Bicentennial Park.
• An existing 72-inch interceptor gravity sewer line along NE 24th Street that runs along the
back side of this property. This line collects all the sanitary flows from the general area
and directs them to Miami -Dade Water and Sewer Department Pump Station # 02.
B. Required Sanitary Sewer System Improvements:
MD-WASD Gravity Sewer System requirements:
It appears that the existing Sanitary Sewer Collection System is adequate and additional
offsite system improvements will not be necessary for the construction of this project.
The proposed project should connect to the existing 8-inch gravity main to obtain sanitary
sewer service.
C. Transmission Capacity Requirements
The Wastewater generated by this project will be conveyed to MD-WASD Regional Pump
Station No. 02. This station have a yearly NAPOT of 4.22 hours per day respectively
according to DERM. (See Exhibit "C).
The current ET data as of May 2004 reflects 4.22 hours. With an additional flow of 42,750
gallons per day generated by this project, the station will only increase by 0.02 hours to 4.24
hours.
The above referenced pump station has sufficient available capacity to support this project.
Flows from this Pump Station are transmitted to the MD-WASD Treatment Plant at Virginia
Key.
Civil and Environmental Engineering • Permitting and Management
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27 thAvenue, Suite 300 305.858.8100 PH^�5.858.4760 FAX
S.Solid Waste Generation
,u. Solid VVonba Generated by this project will be md|eutod in standardized onsite containers for
refuse and recycle. Either hauling companies and/or the City of Miami Solid Waste
Department will provide regular pick- upservices.
The anticipated daily solid waste generation for this' project is 5'38 C~/ per day (Goo
Appendix^O^).
Civil and Environmental Engineering ' Permitting and Management
•
•
e
EDC Corp, Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
EXHIBIT "A"
LOCATION MAP
305.858.8100 PH • 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
LOCATION MAP
305.858.8100 PH - 305.858,4760 FAX
Civil and Environmental Engineering • Permitting and Management
10
0
0
EDC Corp. Environmental Development Consultants Corporation
2455SVV27mAvenue, Suite 3OU
Miami, FL 33145
305.858.8100PH,38O.858.4700FAX
EXHIBUT"B»
Storm Drainage Calculations
Civil and Environmental Engineering ' Permitting and Management
11
•
•
•
EDC Corp, Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
STORMWATER WELL CALCULATIONS
GALLERY ART
DATE: May 2004
SITE DATA:
SITE AREA
BUILDING FOOT PRINT
BUILDING HEIGHT
BUILDING WALL AREA
CONTRIBUTING BUILDING AREA
CONTRIBUTING AREA
LOWEST ADJACENT GRADE
RUN OFF COEFFICIENT
WELL DATA:
305.858.8100 PH • 305.858.4760 FAX
1.28 Acres
0.95 Feet
199 Feet
0.92 Acres
2.20 Acres
2.20 Acres
7.0 Ft.
0.95
WELL DISCHARGE RATE PER .FT OF HEAD 750 GPM
NUMBER OF WELLS 3
TOTAL WELL DISCHARGE RATE PER FT OF HEAD 2,250 GPM/FT.
MEAN HIGH TIDE ELEVATION MHWL 1.5 Ft. GVD
WELL DIAMETER 24 inches
SPECIFIC GRAVITY LOSS (SG) 1.5 Feet
Civil and Environmental Engineering • Permitting and Management
12
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27Ih Avenue, Suite 300
Miami, FL 33145
STORMWATER WELL CALCULATIONS
GALLERY ART
DATE: May 2004
305.858.8100 PH • 305.858.4760 FAX
DESIGN
STORM
RAINFALL
INTENSITY
(In/hr)
PEAK
RUNOFF
(cfs)
WELL
HEAD
(feet)
SG + MH
(feet)
STAGE
(NGVD)
I
CRITICAL
ST AGE:
(NGVD)
5 yr- 24 hr
25 yr- 72 hr
100 yr. 72 hr
8.17
6.98
7.44
17.00
21.35
24.12
3.50
4.16
4.67
3.02
3.02
3.02
4.5
5.1
5.4
7.0
THE MINIMUM PERIMETER GRADE ELEVATION IS 7.0 NGVD.
THE NUMBER OF WELLS PROVIDED IS SUFFICIENT TO MAINTAIN THE PEAK STAGE OF THE 25
YEAR-72HR STORM WITHIN THE PROPERTY.
Civil and Environmental Engineering ' Permitting and Management
13
0
0
9
EDC Corp. Environmental Development Consultants Corporation
2455OVV27mAvenue, Suite 3O0
Miami, FL 33145
305.858.8100PH^305.85 .4760 FAX
EXHIBIT"C17
Miami Dade Water Atlas
yNienni Dada Sewer Atlas
Proposed Water Use Calculations
OERK8 Pump Station Monthly Information
Civil and Environmental Engineering ' Permitting and Management
14
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27' Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, FL 33145
_ST
201
J
606
' A 4 1 7-tr-4" 4 -
0 /
6'
I
a' NE 26 ET
PROJECT LOCATION
1 /720 1i
-1---:
, , 3
. ,, I2. • —1 €:,rr :.::.:
I
.„---, (-601 ; i '
._
(1201 , --...,,
.
' ": ; 1 i .- • ,--:::
04 :
,..., ,„_......./. \
t, C 1 0
t--J
12" 12" : - . 12
.--i-1 4--'", in irr
./-----' 1.7;0-- EI \ I [1„,......._Gr
101361 NE,24„,sT r'sr
1 ,........._,- 4- `........,--, . i to 16013 -
_......1,
I (7' 91e
• 70956 ) r
2 )
1066 7R
1 '
I 33,
aea
7 "116 'd 1 '
------- -
12"
2"
88
4"
PLQI iFf)
F
NE 22 TER
I 7----, 6 _f_r,
1 '' i , a. • ' [....,:-....,:.:
--.---' . ! • ,- , .:-'
Nt 221 47
i T .....
7._._, "--S-7--- /----"`7
(6a4 ', Va•le
--j 1 i
'---'' "'
(1201si . .
. . .
a rr)
MIAMI-OADE WATER ATLAS
SCALE: 1." = 500'
Civil and Environmental Engineering • Permitting and Management
15
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
MIAMI-DADE WASD SEWER ATLAS
13
305,858.8100 PH • 305.858.4760 FAX
76 TrI412 12
Civil and Environmental Engineering - Permitting and Management
16
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300 305.858.8100 PH 305.858.4760 FAX
Miami, FL 33145
PROPOSED WATER USE CALCULATIONS
May 2004
TYPE OF BUILDING USE
No. Units RATE ADF
(Gpd) (Gpd)
CONDOMINIUM UNITS 171 250 42, 750
NET INCREASE: 42,750
Civil and Environmental Engineering • Permitting and Management
17
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
305.858.8100 PH • 305.858.4760 FAX
*2004051114052558*CAMPAJO ent. * DERM NOPT Run May 12, 2004
M Stet Station Station Current Delta Projected
R Type Owner Number ET (Hrs) ET (Hrs) ET (Hrs)
Proposed Number of gallons (gpd): 42,750
****************************** Downstream Stations**************************:t****************.:.*****,***
OK A5RM+ 30 0002 4.22 .02 4.24
AC 30 CD 1002.02 .01 1002.03
AC 30 RS 1002.05 .00 1002.05
IN 30 RS95APR 1001.77 .00 1001.77
IN 30 RS94MARCH 1001.90 .00 1001.91
Civil and Environmental Engineering • Permitting and Management
s
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, FL 33145
EXHIBIT D
Solid Waste Generation Calculations
Civil and Environmental Engineering • Permitting and Management
19
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, FL 33145
PROPOSED SOLID WASTE CALCULATIONS PROJECT
May 2004
305.858.8100 PH • 305.858.4760 FAX
TYPE OF BUILDING USE UNITS RATE SOLID WASTE SOLID WASTE
GENERATED GENERATED
(Pounds) (Pounds) (Tons)
CONDOMINIUM 192 8 1,368 0.68
NET INCREASE 0.68
ANTICIPATED SOLI D WASTE VOLUME AT 7 CY PER TON: 4.75 Cubic Yards per Day
1tMainlMAfN OtE0C Project-Files\Gallery Art Condominium- Job 14605tMUSPMUSP Study May 20 2004,doc
Civil and Environmental Engineering • Permitting and Management
20