Loading...
HomeMy WebLinkAboutR-04-0518City of Miami Legislation Resolution: R-04-0518 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 04-00868 Final Action Date: 7/29/2004 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING AN INCREASE IN THE CONTRACT AWARDED TO PETRO HYDRO, INC., APPROVED BY RESOLUTION NO. 03-752, ADOPTED JULY 17, 2003, IN AN AMOUNT NOT TO EXCEED $265,166.16, INCREASING THE AMOUNT OF THE CONTRACT FROM $737,543.05 TO $1,002,709.21, FOR THE PROJECT ENTITLED "ROAD REHABILITATION PROJECT, B-4651," EXTENDING THE CONSTRUCTION ALONG NORTHWEST 35TH STREET FROM NORTHWEST 25TH AVENUE TO NORTHWEST 27TH AVENUE, IN SUBSTANTIALLY THE ATTACHED PROPOSAL; AUTHORIZING THE CITY MANAGER TO EXECUTE THE FIRST AMENDMENT TO CONTRACT, IN SUBSTANTIALLY THE ATTACHED FORM, GRANTING AN EXTENSION IN THE TERM OF THE CONTRACT BY 60 CALENDAR DAYS, FROM 150 CALENDAR DAYS TO 210 CALENDAR DAYS; ALLOCATING FUNDS, IN AN AMOUNT NOT TO EXCEED $265,166.16, FOR ADDITIONAL CONSTRUCTION COSTS PLUS $15,333.84 FOR COSTS INCURRED BY THE CITY OF MIAMI, FOR TOTAL CONTRACT COSTS NOT TO EXCEED $280,500, FROM CAPITAL IMPROVEMENTS PROJECT NO. 341330, ENTITLED "TRANSIT'/2 CENT SURTAX." WHEREAS, pursuant to Resolution No. 03-752, adopted July 17, 2003 the City of Miami ("City") and Petro Hydro, Inc. ("Contractor") entered into a contract to furnish all labor, materials and equipment and perform all the work in the form and the manner provided by the contract documents for the "Road Rehabilitation Project, B-4651;" and WHEREAS, the City shall pay to the Contractor, as provided in the contract, the sum of $737,543.05 based on lump sum and unit prices; and WHEREAS, the contract comprises improvements for Northwest 5th Street from Northwest 21stAvenue to Northwest 25th Avenue; and WHEREAS, Northwest 35th Street from Northwest 25th Avenue to Northwest 27th Avenue, next to the current project, requires road and drainage improvements; and WHEREAS, the plans and construction documents for the additional area are completed; and WHEREAS, to accomplish the additional work, the contract shall be increased in an amount of $265,166.16, and the term of the contract shall be extended sixty (60) calendar days from one hundred fifty (150) to two hundred ten (210) calendar days, as detailed in substantially the attached proposal for additional services; and WHEREAS, funds to cover $265,166.16 for additional construction costs and $15,333.84 for other costs to be incurred by the City for a total amount of $280,500 are available from Capital Improvement Project ("CIP") No. 341330 entitled "Transit'/2 Cent Surtax;" and City of Miami Page 1 of 3 File Id: 04-00868 (Version: 2) Printed On: 9/28/2016 File Number: 04-00868 Enactment Number: R-04-0518 WHEREAS, the City Manager shall sign the First Amendment to the Contract, in substantially the attached form, with Petro Hydro Inc.; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. An increase in the contract awarded to Petro Hydro, Inc., approved by Resolution No. 03-752, adopted July 17, 2003, in an amount not to exceed $265,166.16, increasing the amount of the contract from $737,543.05 to $1,002,709.21, for the project entitled "Road Rehabilitation Project, B-4651," extending the construction along Northwest 35th Street from Northwest 25th Avenue to Northwest 27th Avenue, in substantially the attached proposal and the extension of the term of the contract for 60 calendar days from 150 calendar days to 210 calendar days, is authorized. Section 3. Resolution No. 03-752 is amended in the following particulars:{1} "Resolution No. 03-752 Section 1. The bid of Petro Hydro, Inc., for the project entitled "Road Rehabilitation Project, B-4651" is accepted, in the amount of $737,543.05 $1,002,709.21 for construction contract costs, plus $106,581.95 $15,333.84 for estimated expenses incurred by the City, for the total estimated project costs of $844,125 $1,018,043.05 as set forth in the Formal Bid Sheet and the Department of Capital Improvements Project Fact Sheet, attached and incorporated, with funds allocated from Capital Improvements Project No. 313855. *1I Section 4. Funds, in an amount not to exceed $265,165.16, for additional construction costs plus $15,333.84 for costs to be incurred by the City for total contract costs not to exceed $280,500, are allocated from CIP No. No. 341330 entitled "Transit'/2 Cent Surtax." Section 5. The City Manager is authorized{2} to execute a First Amendment to the Contract, in substantially the attached form. Section 6. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.{3} Footnotes: City of Miami Page 2 of 3 File Id: 04-00868 (Version: 2) Printed On: 9/28/2016 File Number: 04-00868 Enactment Number: R-04-0518 {1} Words/and or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted and unchanged material. {2} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {3} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 3 of 3 File Id: 04-00868 (Version: 2) Printed On: 9/28/2016