HomeMy WebLinkAbouttabulation of bidsTABULATION of BIOS
Cooling Towers Replacement at MRC Building
B1O NO. 03-04-070
Item
No. Description
1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation,
and successful operation of New Cooling Tower as per Specifications 3.0
2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower
3 Manufacturer Name : Protec Cooling Towers
4 PROVISION FOR SPECIAL ITEMS -
Items so entitled on the Bid Form shall be the Cash Allowance Sums Per Project.
and in the amount indicated. These shall be included in the Bid to provide funds for payment
for ftems of work not foreseen at the time of bidding. Funds not spent from these sums shall revert
back to the City.
TOTAL COST:
5 Manufacturer Standard Warranty (Please Describe in Detail):
6 Exceptions:
Prepared by:
Terry Byrnes, CPPB
S116/04
U!M
JOB
Thermo Air, Inc. Rapid A/C Airstron, Inc~
2875 N. 29th Ave. 2200 W 80 Rd, #4 1559 SW 21 Ave.
Hollywood, FL 33020 Hialeah, FL 33016 Ft. Lauderdale, FL 33312
Non-Minority/Non-Local Hispanic/Dade Non-Minority/Non-Local
PRICE
$ 119,000.00
$ 30,000.00
TBD
$ 149,000.00
1YEAR
Add for 5 Yr. $7,500.00
Extended Warranty
N/A
PRICE
$ 140, 000.00
$ 18,000.00
TBD
$ 158,000.00
5 Years Complete
Warranty
N/A
Approval:
PRICE
$ 144,000.00
$ 30,000.00
TBD
$ 174,000.00
No Response
NIA
TABULATION OF BIDS
Cooling Towers Replacement at MRC Building
BID NO. 03-04-070
Item
No. Description
1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation,
and successful operation of New Cooling Tower as per Specifications 3.0
2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower
3 Manufacturer Name : Protec Cooling Towers
4 PROVISION FOR SPECIAL ITEMS -
Items so entitled on the Bid Form shall be the Cash Allowance Sum Per Project,
and in the amount indicated. These shall be included in the Bid to provide funds for payment
for items of work not foreseen at the time of bidding. Funds not spent from these sums shall revert
back to the City.
TOTAL COST:
5 Manufacturer Standard Warranty (Please Describe in Detail):
6 Exceptions:
Prepared by:
Terry Byrnes, CPPB
5I17104
U/M
JOB
Weathertrol
7250 NE 4th Ave.
Miami, FL 33138
Hispanic/Dade
PRICE
$ 141,950.00
$ 30,618.00
TBD
$ 172,568.00
No Response
NIA
Pan Am Air Conditioning
12916SW132Ct
Miami, FL 33186
Hispanic/ Dade
PRICE
$ 217,000.00
$ 48,000.00
TBD
$ 265,000.00
1 Year, Parts/Labor
NIA
Approval:
Pyke Mechanical, Inc.
9401 NW 106 St, Ste 109
Miami, FL 33178
Non-Minority/Dade
PRICE
Per Protec Specs
Fire Sprinkler Piping &
Permit Fees
TABULATION OF BIDS
Cooling Towers Replacement at MRC Building
BID NO.0344-070
Item
No. Description UIM
1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation, JOB
and successful operation of New Cooling Tower as per Specifications 3.0
2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower
3 Manufacturer er Name : Protec Cooling Towers
4 PROVISION FOR SPECIAL ITEMS -
Iterns so entitled on the Bid Form shall be the Cash Allowance S1rn Per Project,
and in the arnonrd indicated. These shall be included in the Bid to provide funds for payment
for items of work not foreseen at the time of bidding. Funds not spent from these snrns shall revert
bade to the City.
TOTAL COST:
5 Manufacturer Standard Warranty (Please Describe in Detail):
6 Exceptions:
Prepared by:
Terry Byrnes, CPPB
Sntu04
Key Biscayne Mech.
d/b/a All Dade AIC
10465 SW 184 Terrace
Miami, FL 33157
Non-Minority/Dade
PRICE
$ 350,500.00
$ 17,000.00
TBD
3 367,500.00
Per Prates Specs
5 Yr Warranty per Attachment 2.
Labor- 1 Yr from start-up
N/A
Master Mechanical Services,lnc.
6187 NW 167 St, 1425
Miami, FL 33015
Female/Dade
PRICE
$ 328,850.00
$ 21,000.00
TBD
$ 349,850.00
Per Pmtec Specs
Any removal or stoppage of project
due to hurricane or storm warning
Approval: