Loading...
HomeMy WebLinkAbouttabulation of bidsTABULATION of BIOS Cooling Towers Replacement at MRC Building B1O NO. 03-04-070 Item No. Description 1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation, and successful operation of New Cooling Tower as per Specifications 3.0 2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower 3 Manufacturer Name : Protec Cooling Towers 4 PROVISION FOR SPECIAL ITEMS - Items so entitled on the Bid Form shall be the Cash Allowance Sums Per Project. and in the amount indicated. These shall be included in the Bid to provide funds for payment for ftems of work not foreseen at the time of bidding. Funds not spent from these sums shall revert back to the City. TOTAL COST: 5 Manufacturer Standard Warranty (Please Describe in Detail): 6 Exceptions: Prepared by: Terry Byrnes, CPPB S116/04 U!M JOB Thermo Air, Inc. Rapid A/C Airstron, Inc~ 2875 N. 29th Ave. 2200 W 80 Rd, #4 1559 SW 21 Ave. Hollywood, FL 33020 Hialeah, FL 33016 Ft. Lauderdale, FL 33312 Non-Minority/Non-Local Hispanic/Dade Non-Minority/Non-Local PRICE $ 119,000.00 $ 30,000.00 TBD $ 149,000.00 1YEAR Add for 5 Yr. $7,500.00 Extended Warranty N/A PRICE $ 140, 000.00 $ 18,000.00 TBD $ 158,000.00 5 Years Complete Warranty N/A Approval: PRICE $ 144,000.00 $ 30,000.00 TBD $ 174,000.00 No Response NIA TABULATION OF BIDS Cooling Towers Replacement at MRC Building BID NO. 03-04-070 Item No. Description 1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation, and successful operation of New Cooling Tower as per Specifications 3.0 2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower 3 Manufacturer Name : Protec Cooling Towers 4 PROVISION FOR SPECIAL ITEMS - Items so entitled on the Bid Form shall be the Cash Allowance Sum Per Project, and in the amount indicated. These shall be included in the Bid to provide funds for payment for items of work not foreseen at the time of bidding. Funds not spent from these sums shall revert back to the City. TOTAL COST: 5 Manufacturer Standard Warranty (Please Describe in Detail): 6 Exceptions: Prepared by: Terry Byrnes, CPPB 5I17104 U/M JOB Weathertrol 7250 NE 4th Ave. Miami, FL 33138 Hispanic/Dade PRICE $ 141,950.00 $ 30,618.00 TBD $ 172,568.00 No Response NIA Pan Am Air Conditioning 12916SW132Ct Miami, FL 33186 Hispanic/ Dade PRICE $ 217,000.00 $ 48,000.00 TBD $ 265,000.00 1 Year, Parts/Labor NIA Approval: Pyke Mechanical, Inc. 9401 NW 106 St, Ste 109 Miami, FL 33178 Non-Minority/Dade PRICE Per Protec Specs Fire Sprinkler Piping & Permit Fees TABULATION OF BIDS Cooling Towers Replacement at MRC Building BID NO.0344-070 Item No. Description UIM 1 Removal and proper disposal of existing Cooling Tower, Delivery and Installation, JOB and successful operation of New Cooling Tower as per Specifications 3.0 2 Delivery, Installation and Successful Operation of a Temporary Cooling Tower 3 Manufacturer er Name : Protec Cooling Towers 4 PROVISION FOR SPECIAL ITEMS - Iterns so entitled on the Bid Form shall be the Cash Allowance S1rn Per Project, and in the arnonrd indicated. These shall be included in the Bid to provide funds for payment for items of work not foreseen at the time of bidding. Funds not spent from these snrns shall revert bade to the City. TOTAL COST: 5 Manufacturer Standard Warranty (Please Describe in Detail): 6 Exceptions: Prepared by: Terry Byrnes, CPPB Sntu04 Key Biscayne Mech. d/b/a All Dade AIC 10465 SW 184 Terrace Miami, FL 33157 Non-Minority/Dade PRICE $ 350,500.00 $ 17,000.00 TBD 3 367,500.00 Per Prates Specs 5 Yr Warranty per Attachment 2. Labor- 1 Yr from start-up N/A Master Mechanical Services,lnc. 6187 NW 167 St, 1425 Miami, FL 33015 Female/Dade PRICE $ 328,850.00 $ 21,000.00 TBD $ 349,850.00 Per Pmtec Specs Any removal or stoppage of project due to hurricane or storm warning Approval: