This AGREEMENT, made and entered into this day of A.D., 2000,
by and between the City of Miami, Florida, a muni 'pal corpora on of the State of
Florida, party of the first part, (hereinafter sometimes called the. «City"), and
c n& Electric Motor'
Party, of the second part (hereinafter sometimes called the "Contractor")
WITNESSETH: That the parties hereto, for the considerations hereinafter set
forth, mutually agree as folloi's:
ARTICLE 1. SCOPE OF THE WORK: The Contractor shall furnish all
labor, materials and equipment and perform all the work in the manner and form
provided by the Contract Documents, for the project entitled: .
• Citywide Storm Water Pump Station Maintenance Contract, 13-5651
ARTICLE 2. THE CONTRACT SUM: The City shall pay to the Contractor,
for the faithful performance of the Contract, in lawful money of the United States, and
subject to additions and deductions and based on uiiit prices (where applicable), all as
provided in the Proposal and other Contract Documents, the sum of ($ 104, 840. 00 .)
One Hundred Four
Thousand Eight Hundred Forty Dollars and No Cents
ARTICLE 3. PARTIAL AND FINAL PAYMENTS: In accordance with the -
provisions fully set forth in the "General Conditions" of the "Specifications," and subject •
to additions and deductions as provided, the City shall pay the Contractor as follows:
(a) On or before the 10d' day of each calendar month, the City shall make
partial payments to the Contractor on the basis of a duly certified and
approved estimate of work, performed during the preceding calendar
month by the Contractor, less ten (10%) percent of the amount of such
estimate, which is to be retained by the City until all work has been
performed strictly in accordance with this Agreement and until such
work has been accepted by the City.
(b) Upon submission by the Contractor of evidence satisfactory to the City
that all payrolls, material bills and other costs incurred by the Contractor
in connection with the construction of the work have been paid in full,
and also, after all guarantees that may be required in the Specifications or
by the Contractor have been furnished and are found acceptable by the
City, final payment on account of this Agreement shall be made within
sixty (60) days after completion by the Contractor of all work covered by
this Agreement and acceptance of such work by the City.
1
An 114Ln at. Lunn yr LUWU ter, I kUN: 1 ne contractor shall
- - commence the work to be performed under -this Contract -within= the numberf
-consecutive__ days after the date of -written-notice from —the -Director --of the
Department of. Public Works to begin work as noted in the Proposal, and shall
fully complete the Contract in accordance with the Contract Documents within
the number of working days as set forth in the Proposal.
It is mutually agreed between the parties hereto, that time is the essence of this
Contract, and, in the event that construction of the work is not completed within
the time herein specified, it is agreed that from the compensation otherwise to be
paid to the Contractor, the Gity may retain for each day thereafter, Sundays and
holidays included, that the Fork remains uncompleted, the sum set forth in the
General Conditions of the Specifications, as modified by Division 2 - Special
Provisions, which sum represents the actual damage which the City of Miami,
Florida, will have sustained per day by failure of the Contractor to complete the
work within the time stipulated, and this sum is not a penalty, but will be the.
liquidated damage that City will have sustained in event of such default by the
Contractor.
ARTICLE 5. ADDITIONAL BOND: It is further mutually agreed
between the parties hereto, that if, at any time after the execution of this
Agreement and the Performance Bond hereto attached, when required for its
faithful performance, the City shall deem the surety or sureties upon such bond to
be unsatisfactory, or if, for any reason, in the opinion of the Engineer; such bond
ceases to be adequate to cover the performance of the work, the Contractor shall,
at his expense, within five (5) days after receipt of notice from the Engineer so to
do, furnish an additional bond or bonds in such form and amount, and with such
surety or sureties as shall be satisfactory to the City. In such event, no further
payment to the Contractor shall be deemed to be due under this Agreement until
such new or additional security for the faithful performance of the work shall be
furnished in manner and form satisfactory to the City.
ARTICLE 6. CONTRACT DOCUMENTS: All of the documents
hereinafter listed form the Contract and they are as fully as part of the Contract as
if hereto attached, or repeated in this Agreement:
ADVERTISEMENT FOR BIDS
PROPOSAL
BID BOND
CONTRACT
PERFORMANCE BOND
MAINTENANCE PERFORMANCE BOND
INSTRUCTIONS TO BIDDERS
SPECIFICATIONS
ADDENDA
PLANS: As prepared by Department pf Public works
Entitled: Citywide Storm Water_lamp stait1an
Maintenance Contract, B-5651
2
- IN WITNESS -WHEREOF the parties hereto have eouted this Agreement
--on the day and date first above written indive (5) coun erp ;each of o hich
shall, without proof or accounting for the other counterparts, be deemed an
original contract
(SEAL)
ATTEST:
Walter . oemarf
City Clerk " `
WITNESS: (If Corporat'on,
attach Seal and A est b ecretary)
RESOLUTION NO. 00-655
THE CITY OF MIAMI, FLORIDA
Party of the first part
BY:
CONTRACTOR:
CONDO ELECTRIC MOTOR REPAIR, INC.
Party o the second part
1
BY:
(Title)
(Employer Tax I.D. Number)
APPROVED
INS
AS
TO
NTS:
Mario Soldevilla, Administrator
Risk Management
APPROVED AS TO ENGINEERING: APPRO
CO
Jahn H. Jackson,
Public Works
irector
leja T.
City ttorney
0 FORM AND
'IIV THE EVENT THAT THE CONTRA OR IS A CORPORATION, THERE SHALL BE
ATTACHED TO EACH COUNTERPART CERTIFIED COPY OF A RESOLUTION OF THE
BOARD OF DIRECTORS OF THE CORPORATION, AUTHORIZING THE OFFICER WHO
SIGNS THE CONTRACT TO DO SO IN ITS BEHALF.