HomeMy WebLinkAbouttiburon software and services 2Tiburon Software and Services
Qt� Software
Descri lion
Fire Rescue Records Management -- FRMS/Ti
Nucleus (1 agency)
—_ _Arowser system_ -�—
i Location System -- incident Tracking (NFIRS 5.D)
Station Log
Optio�_ Via? modules- —�
EMS Reporting
Equipment Maintenance $ 753 0
f Ftazardous Mafer- is —�^ "�— $3,000
Inspection System ---- — 1 _ $4 04 0;
Inventory$285D
! PersonneIrrraining ~—�---
Dala Conversion
— 1(.USt6m mo`i � iota of S; _
•
None proposed
54.400
$4,900
Technical
L°c� en es Se es
Totals
Comments
S37.400
incl -- $37,Dfl nucrreus sfl}tware
incr
incl
inct
S35.7144 EMS reporting with Liifaring for FL requirements
543,000 I'
$4,401
_
$4,400 I
$ 4900
��1---__--______
not inc_ �` —
Business Pratt cei Review, Canfiguratipn,
-Software Installation, Testing Certification
_ 1 FRMS Setup Training Class
_„ _LI1 �FRMS Adrnin Training Class i day/class �53&
FR�S User Training Classes 1 5 days/class 52.306
FRMS Follow-up training 6 days class $9,275
t
Subtotals
Database Workstations
�S—il -�Fe RMS workstation licenses
1 IWorkstation site license for the above �� $0
$26,665
Tiburon, Inc_
$77,198
--57-71-98_ 541,76�TeChnicat and rotEss-�nal "seNices
�_-__
$1,538
$2.3D6
not included
$164,06B h 5224,768
Page 1 of 4
ind_ befew
6/16/2004
5pa'40d uaN
EBB9-92b-GDL
Q
Description
Database interfaces and Subsystems
1 ! Printrak CAD incident transfer interface (real lime)
1 :Hydrant & Premise History Information Upload
— .L� egacy CAD Data Transfer
Tiburon Software and Services
Software Technical
I-ices� Seee��
Tola is
C� nts
Geographic Presentation Systems
Subtotals! $0
1 'GPA Geographic Presentation & Analysis licenses
SPA User Training Class
1
Geofite Conversion
Subtotals
I'
incident
578,655 I� $18,6b {jnterface to P If n
rak CAD '
e`�
using the
transfer usirt
.standard qPI
523,367 $23,367 Provides for Ta ib iru n1 FRMS file transfer to Printrak
$2fi,i16 $26,116 Provides for data transfer from lei c
FRMS g y CAB system to
in
$be,138
$68,138
57900 $tf,225 $15,125 '`-
3 days class
`25-I
S21,150
57,900 $13,250
(Geographic file conversion toots and services
1 ?GM- User Training Classes $3,200
• 2 daysfciass
Other Technical and Professional Services
:Crystal Repons training
Subtotals
$3,200
dayslclass
T1.4-/i taboo setup and software a oonfguration
i Server/network installation and support services --_�
:Network on -site installation
Tiburon, Inc.
• 1 not included City to provide C o�
-4- ____ by Tiburon Crystal Ra P rts training, not prop eds d
83,821-1— g 8211Worksretion and wryer setup y 1
$27,609 and configuration services
not included City to provide local netivOrk ---
$26,251 1Import of City GIS for location verification
$4,766 r -- �..�
537,017 ,
Page 2 of 4
6/16/2004
4
3
FJagad ua>1
EBBS-504-LD1.
8
Tiburon Software and Services
Software Technical
CLq--- destri flan
Licenses Services Totals
Comments
Systems Integration
Project Management -�, $18,162 $18,182 Equipment and net•Nork into teyratian fee
�..__._�_-_ `�� fi$97.21^-- $97.211 Tiburon maa - -�._,
p _,_ct mat���car• �nr
Subtotals $0 $1 147 023
5147,023
License and Services Totals: $98,465 ;420,296
$518,7fi1
Optional Systems and Subsystems
Field Automation System - FAS
SRS workstation software
_ 1 'ARS system base (RF/wireless)
;Custom modifications:
-4--
None proposed
,Business Practice Review, Configuration, Tailoring
!Software installation, Testing, Certification
:ARS User Training Classes
'ARS Follow-up training
549.385 Optiu- a por1abte ins3ectio n system and mobile EMS
reporting
$12,480
$10.289 ! $10.289
$39.761 $39.761
$3,075 i
'Wireless -TCP/IP. interface
Custom Modifications:
None proposed
1 MSS system administration training class
$5,800 1 $23,129
Subtotals
Tiburon, Inc.
$3,075
not included
528,929
not included
1 day/class 51.119 g1,1i9
1
567665 $77.373
Page 3 of 4
5145,038
6/16/2004
L,
c
3
01
41,
0
t0
s�agad UON
EB89-92t.-LOL
Tiburon Software and Services
QV Desert tion
License and Services Totals:
ar
Tiburon, inc.
Software Technical
Licenses
Services
$67,665 $77,373
$145,038 FAS price is guaran teed through system acceptance of
the base system tn5tallation
Totals
-�—_� Comments
Page 4 of 4
6/16/2004
tJ
3
0
N
to
SJag.ad UaN
E989-9Zb-L96