Loading...
HomeMy WebLinkAboutexhibit 2- formal bidFORMAL BID "KENNEDY PARK- PARKING LOT" Project Number: Project Manager: Person who Construction B-60442 ( formerly B-64$9) CIP Date: Received Time: Number: 333112 Hall Victor Marzo 4 13 2004 Miami City received the bids: Victor Matzo at: City Clerk's Office, Estimate = $ I60,000.00 11:00 a.m. BIDDER COHABI GROUP I1E_RALP1N USA ZURQUI CONST_ SERV. BUILT TO LAST coNST. SERV. ADDRESS 1770 N.W. 60 ST. MIAM1, FL.33142 1925 BRICKELL AVE. D-205 MIAMI, FL 33129 9755 S.W. 40yh. Ten-. MIAM1 FLORIDA 33165 500 S.W. 51 COURT. MIAM? F 33134 BID BOND AMOUNT 5%131D BOND CHECK 5% BID BOND CHECK 5% BID BOND 5%BID BOND CHECK IRREGULARITIES - - MINORITY N/A N/A N/A N/A ualscr itasnur OWNED duns Plmum DmiCFinanmwsw Uranal ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL TOTAL BID ITEMS 1 THROUGH 3 S134,984.98 S140,000.00 S156,900.00 S163,000.00 l BID ITEMS 1 THROUGH 3 SITE PREPARATION CONSISTING OF THE REMOVAL AND $70,415.05 $42,000.00 $8,900.00 $ 37,665.00 DISCARD FROM SITE,EXI.STING UNWANTED TREES,SOD WEEDS AND SOIL LAYERS FOR LAEROCK BASE 2 BID ITEM 2 FOR FURNISHING OF ALL LABOR, MATERIALS AND EQUIP. FOR THE INST. OFBRICKPAVERS ON SAND BED $56,569.93 S90,000.00 $140,000.00 $ 117,335.00 3 BID ITEM 2 PROVISION FOR SPECIAL ITEMS AS NOTED IN SPECIAL PROVISION. $8,000.00 $8,000.00 S8,000.00 $8,000.00 • IRREGULARITIES LEGEND A -- No Power - of - Attorney B — No Affidavit as to Capital & Surplice of Bonding Company C — Corsi Extensions D — Proposal Unsigned or improperly Signed or no Corporate Seal E — Sub-contractor(s) not Identified F — Non - responsive bid IT HAS BEEN DETERMINED BY THE DEPARTMENT LOWEST RESPONSIBLE AND RESPONSIVE BID FOR THE TOTAL OF CAPITAL IS FROM AMOUNT bidder explain: IMPROVEMENTS THAT THE HERAL.PIN USA INC. OF $134,984.88 11 the above contractor is not the lowest to contract at the Heralpin USA is a firm located within the City of Miami limits, and accepts the offer taw lid animal of $134,984.98, as per Loot Pretenses Oidimnce No.11087 PREPARED BY: VRCTORMARZO REVISED BY: JUANB. ORDONEZ. PE. DATE: APRIL 21, 2004 SHEET 1 OF 1 G — Improper Bid Bond H — No Certdicate of Competency Number 1 — No First Source tiring Compliance Statement J — No Minority Compliance Statement K — No Duplicate Btd Proposal L — No City of Miami or County Occupational License FORMAL BID Project Number: Project Manager: Person who Construction B-60442 (formerly B-6489) CIP Date: Received Time: Number: 333112 Hall Victor Marco 4 13 2004 Miami City received the bids: Victor Marzo at: City Clerk's Office, R.ctimat' = $ 160,000.00 11:00 am. BIDDER DEVELOPMENT & COMAt_ GROUP HORIZON CONTRACTOR, INC AUGUST CONST. CO.WC FORTEX CONSTRUCTION ADDRESS 9700 S.W.104 ST. UTAMJ PI.33176 8175 W. 32AVE.# 1 MIAMI, FL 33018 7341 N.W. 32 AVE. MSAW FLORIDA 33147 8000 N.W. 31 STREET. it 17 MIA L)L33122 BID BOND AMOUNT BID BOND 5%BID B06D CHECK BID BOND BID BOND IRREGULARITIES - - MINORI MINORITY OWNED WA N/A NIA NIA cry ITEM No. DESCRIPIION UNIT PRICE TOTAL UNIT PRICE TOTAL I UNIT PRICE TOTAL UNIT PRICE TOTAL TOTAL: BID ITEMS 1 THROUGH 3 S168,000.00 S177,000.00 S178,265.00 S181,300.00 1 BID ITEMS 1 1TIROUGH 3 S90,000.00 S62,000.00 $94,237.00 S 89,800.00 SEE PREPARATION CONSUMING OF TEE REMOVAL AND DISCARD PROM SrowasriNG UNWANTED TREESSOD WEEDS AND SOIL LAYERS FOa LTMEROC . BASE 2 BID ITEM Z FOR FIRNISEIN3OF ALL LABOR MAIER1ALS AND EQUIP_ FOR ='1 INST.OFBRICK PAVEitSONSANDBED S70,000.00 S107,000.01 S76,028.00 S 83,500.00 3 BID ITEM 3 PROV1S/ON FOR SPEaAL MBAS AS NOTED IN SPECIAL PROVISION. 88,000.00 58,000.00 58,000.00 S8,000.00 • IRREGULARITIES A — No Poe- B — No Affidavit C — Caromed D — Proposal E — Snb-cant F — Non -responsive G — *awn li — No cerfdieste 1 — No hod J — No Minority K. — No Lkapiicalc L — No City LEGEND of - Mooney tto Capital & Surplus of Banding Company IT HAS BEEN DETERMINED BY THE DEPARTMENT LOWEST RESPONSIBLE AND RESPONSIVE FOR THE TOTAL OF CAPITAL BID IS FROM AMOUNT bidder explain IMPROVEMENTS THAT THE HERALPIN USA, INC. OF 6134,984AS Pxtensions Unsigned or Impropaty Signal or no Corporate Seal a (a) not Identified bid Bid Baud ofCompetency Number Somme Huang C rani= Mammal Conphanon Statoo►oot laid Proposal of Mmmr an County Uacrpatioeat 1.3012111C 11 the above contractor is not the lowest See ski 11 1 of 3 PREPARED BY V!CPORMARFA REVVED BY: J UAN B. ORDONEZ, P.B. DATE APIUL 21, 2004 . SkIEET 2 1* 3 FORMAL BID " DYPA 11 r '" Project Number: Project Manager Person who Construction B-60442 (B.6489) CIP Date: Received Time: Number: 333112 Hall Victor Map 4 13 2004 Miami City received the bids: Victor Marzo at City Clerk's Office, Estimate = $ 160,000.00 11:00 a.m. BIDDER 1?DFM CORP WILLIAMS PAVING CO. INC ORLANDO GARCIA JR. TLMC ENTERPRISES INC. ADDRESS 1022 N.W. 54 ST. 1tIA1.4 FI..33127 11300N SOUTH RIVER DR. LEDLY,14<3312s 10450N.W_ 31 TBIR MAK FLORIDA 33772 3800 N.W. 22 AVR,H 100 uIAi,Irm. 33142 BID BOND AMOUNT BID BOND 596111DBONI) 5%BID DDND 5% BID BOND IRREGULARITIES - - MINORITY N/A NIA NA NIA OWNED rimaamum a� arrAmin ITEM Na. UNIT PRICE TOTAL UNIT PRICE TOTAL UNTI. PRICE TOTAL UNIT PRICE TOTAL DESCRIPTION TOTAL: BID ITEMS 1 THROUGH 3 $195,237.00 3238,389.00 S291,552.00 S316,000.00 1 BID TEEMS 1 THROUGH 3 SCD3 PREPARATION CONSISTING OF TEE REMOVAL AND S103,237.00 860,798.00 $135,587.00 8220,146.00 DISCARD FROM B, STINGUNWANTED TRE138,30D WEEDS AND SOIL LAYERS FORL1MEROLK BASE 2 BID ITEM 2 FORFURNISHRIGOFALLLABOR.MATERWSANDBHP. FOR THE INST. OF BECK PAVERS ON SAND BED S14,000.00 5169,591.00 S147,965.00 $ 87,864.00 3 BID ITEM 3 PROVISION FOR SPECIAL ITEMS AS NOTED IN SPECIAL PROVISION. $3,000.00 Sg,o00.00 Ss,000.00 SS,000.00 J • IRREGULARMEs LEGEND A — No Power - of- Attorney B — No Affidavit as to Capital & Suplus of Bending Cry C — Corrected Exfoliate'na D — Ptsvul Unsigned ar Improperly Signed or no Capitate Seal E — sub.coolmetar(s) net Mortified F — Non - rosponeivo bid G — Improper Bid Band H — No catdicatae of Competency Number 1 — No lent Sorrow living C amphu1 c Statement J — No Mmonty Cairo/lance Statement K — No IJnptcate tied Propene L — No City of bassmt ar County Occupational Lamm IT HAS BEEN DETERMINED BY THE DEPARTMENT LOWEST RESPONSIBLE AND RESPONSIVE FOR THE TOTAL OF CAPITAL BID IS FROM AMOUNT bidder explain: IMPROVEMENTS THAT THE HERALPIN USA INC. OF $134,884.118 It the above contractor is not the lowest See sit. I of 3 • PREPARED BY: VICTOR IdARZA REVISED BY: JUAN B. ORDONEZ, P.B. DAM: APRIL 21, 2004 SENSE 3 Ot, 3