HomeMy WebLinkAboutexhibit 2- formal bidFORMAL BID
"KENNEDY PARK- PARKING LOT"
Project Number:
Project Manager:
Person who
Construction
B-60442 ( formerly B-64$9)
CIP
Date:
Received
Time:
Number: 333112
Hall
Victor Marzo
4 13 2004
Miami City
received the bids: Victor Matzo
at: City Clerk's Office,
Estimate = $ I60,000.00
11:00 a.m.
BIDDER
COHABI GROUP
I1E_RALP1N USA
ZURQUI CONST_ SERV.
BUILT TO LAST coNST. SERV.
ADDRESS
1770 N.W. 60 ST.
MIAM1, FL.33142
1925 BRICKELL AVE. D-205
MIAMI, FL 33129
9755 S.W. 40yh. Ten-.
MIAM1 FLORIDA 33165
500 S.W. 51 COURT.
MIAM? F 33134
BID BOND AMOUNT
5%131D BOND CHECK
5% BID BOND CHECK
5% BID BOND
5%BID BOND CHECK
IRREGULARITIES
-
-
MINORITY
N/A
N/A
N/A
N/A
ualscr itasnur
OWNED duns Plmum
DmiCFinanmwsw Uranal
ITEM No.
DESCRIPTION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
TOTAL BID ITEMS 1 THROUGH 3
S134,984.98
S140,000.00
S156,900.00
S163,000.00
l
BID ITEMS 1 THROUGH 3
SITE PREPARATION CONSISTING OF THE REMOVAL AND
$70,415.05
$42,000.00
$8,900.00
$ 37,665.00
DISCARD FROM SITE,EXI.STING UNWANTED TREES,SOD
WEEDS AND SOIL LAYERS FOR LAEROCK BASE
2
BID ITEM 2
FOR FURNISHING OF ALL LABOR, MATERIALS AND EQUIP.
FOR THE INST. OFBRICKPAVERS ON SAND BED
$56,569.93
S90,000.00
$140,000.00
$ 117,335.00
3
BID ITEM 2
PROVISION FOR SPECIAL ITEMS AS NOTED IN SPECIAL
PROVISION.
$8,000.00
$8,000.00
S8,000.00
$8,000.00
• IRREGULARITIES LEGEND
A -- No Power - of - Attorney
B — No Affidavit as to Capital & Surplice of Bonding Company
C — Corsi Extensions
D — Proposal Unsigned or improperly Signed or no Corporate Seal
E — Sub-contractor(s) not Identified
F — Non - responsive bid
IT HAS BEEN DETERMINED BY THE DEPARTMENT
LOWEST RESPONSIBLE AND RESPONSIVE BID
FOR THE TOTAL
OF CAPITAL
IS FROM
AMOUNT
bidder explain:
IMPROVEMENTS THAT THE
HERAL.PIN USA INC.
OF $134,984.88
11 the above contractor is not the lowest
to contract at the
Heralpin USA is a firm located within the City of Miami limits, and accepts the offer
taw lid animal of $134,984.98, as per Loot Pretenses Oidimnce No.11087
PREPARED BY: VRCTORMARZO
REVISED BY: JUANB. ORDONEZ. PE.
DATE: APRIL 21, 2004
SHEET 1 OF 1
G — Improper Bid Bond
H — No Certdicate of Competency Number
1 — No First Source tiring Compliance Statement
J — No Minority Compliance Statement
K — No Duplicate Btd Proposal
L — No City of Miami or County Occupational License
FORMAL BID
Project Number:
Project Manager:
Person who
Construction
B-60442 (formerly B-6489)
CIP
Date:
Received
Time:
Number: 333112
Hall
Victor Marco
4 13 2004
Miami City
received the bids: Victor Marzo
at: City Clerk's Office,
R.ctimat' = $ 160,000.00
11:00 am.
BIDDER
DEVELOPMENT & COMAt_
GROUP
HORIZON CONTRACTOR, INC
AUGUST CONST. CO.WC
FORTEX CONSTRUCTION
ADDRESS
9700 S.W.104 ST.
UTAMJ PI.33176
8175 W. 32AVE.# 1
MIAMI, FL 33018
7341 N.W. 32 AVE.
MSAW FLORIDA 33147
8000 N.W. 31 STREET. it 17
MIA L)L33122
BID BOND AMOUNT
BID BOND
5%BID B06D CHECK
BID BOND
BID BOND
IRREGULARITIES
-
-
MINORI MINORITY
OWNED
WA
N/A
NIA
NIA
cry
ITEM No.
DESCRIPIION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
I
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
TOTAL: BID ITEMS 1 THROUGH 3
S168,000.00
S177,000.00
S178,265.00
S181,300.00
1
BID ITEMS 1 1TIROUGH 3
S90,000.00
S62,000.00
$94,237.00
S 89,800.00
SEE PREPARATION CONSUMING OF TEE REMOVAL AND
DISCARD PROM SrowasriNG UNWANTED TREESSOD
WEEDS AND SOIL LAYERS FOa LTMEROC . BASE
2
BID ITEM Z
FOR FIRNISEIN3OF ALL LABOR MAIER1ALS AND EQUIP_
FOR ='1 INST.OFBRICK PAVEitSONSANDBED
S70,000.00
S107,000.01
S76,028.00
S 83,500.00
3
BID ITEM 3
PROV1S/ON FOR SPEaAL MBAS AS NOTED IN SPECIAL
PROVISION.
88,000.00
58,000.00
58,000.00
S8,000.00
• IRREGULARITIES
A — No Poe-
B — No Affidavit
C — Caromed
D — Proposal
E — Snb-cant
F — Non -responsive
G — *awn
li — No cerfdieste
1 — No hod
J — No Minority
K. — No Lkapiicalc
L — No City
LEGEND
of - Mooney
tto Capital & Surplus of Banding Company
IT HAS BEEN DETERMINED BY THE DEPARTMENT
LOWEST RESPONSIBLE AND RESPONSIVE
FOR THE TOTAL
OF CAPITAL
BID IS FROM
AMOUNT
bidder explain
IMPROVEMENTS THAT THE
HERALPIN USA, INC.
OF 6134,984AS
Pxtensions
Unsigned or Impropaty Signal or no Corporate Seal
a (a) not Identified
bid
Bid Baud
ofCompetency Number
Somme Huang C rani= Mammal
Conphanon Statoo►oot
laid Proposal
of Mmmr an County Uacrpatioeat 1.3012111C
11 the above contractor is not the lowest
See ski 11 1 of 3
PREPARED BY V!CPORMARFA
REVVED BY: J UAN B. ORDONEZ, P.B.
DATE APIUL 21, 2004
. SkIEET 2 1* 3
FORMAL BID
" DYPA
11 r '"
Project Number:
Project Manager
Person who
Construction
B-60442 (B.6489)
CIP
Date:
Received
Time:
Number: 333112
Hall
Victor Map
4 13 2004
Miami City
received the bids: Victor Marzo
at City Clerk's Office,
Estimate = $ 160,000.00
11:00 a.m.
BIDDER
1?DFM CORP
WILLIAMS PAVING CO. INC
ORLANDO GARCIA JR.
TLMC ENTERPRISES INC.
ADDRESS
1022 N.W. 54 ST.
1tIA1.4 FI..33127
11300N SOUTH RIVER DR.
LEDLY,14<3312s
10450N.W_ 31 TBIR
MAK FLORIDA 33772
3800 N.W. 22 AVR,H 100
uIAi,Irm. 33142
BID BOND AMOUNT
BID BOND
596111DBONI)
5%BID DDND
5% BID BOND
IRREGULARITIES
-
-
MINORITY
N/A
NIA
NA
NIA
OWNED rimaamum a� arrAmin
ITEM Na.
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNTI.
PRICE
TOTAL
UNIT
PRICE
TOTAL
DESCRIPTION
TOTAL: BID ITEMS 1 THROUGH 3
$195,237.00
3238,389.00
S291,552.00
S316,000.00
1
BID TEEMS 1 THROUGH 3
SCD3 PREPARATION CONSISTING OF TEE REMOVAL AND
S103,237.00
860,798.00
$135,587.00
8220,146.00
DISCARD FROM B, STINGUNWANTED TRE138,30D
WEEDS AND SOIL LAYERS FORL1MEROLK BASE
2
BID ITEM 2
FORFURNISHRIGOFALLLABOR.MATERWSANDBHP.
FOR THE INST. OF BECK PAVERS ON SAND BED
S14,000.00
5169,591.00
S147,965.00
$ 87,864.00
3
BID ITEM 3
PROVISION FOR SPECIAL ITEMS AS NOTED IN SPECIAL
PROVISION.
$3,000.00
Sg,o00.00
Ss,000.00
SS,000.00
J
• IRREGULARMEs LEGEND
A — No Power - of- Attorney
B — No Affidavit as to Capital & Suplus of Bending Cry
C — Corrected Exfoliate'na
D — Ptsvul Unsigned ar Improperly Signed or no Capitate Seal
E — sub.coolmetar(s) net Mortified
F — Non - rosponeivo bid
G — Improper Bid Band
H — No catdicatae of Competency Number
1 — No lent Sorrow living C amphu1 c Statement
J — No Mmonty Cairo/lance Statement
K — No IJnptcate tied Propene
L — No City of bassmt ar County Occupational Lamm
IT HAS BEEN DETERMINED BY THE DEPARTMENT
LOWEST RESPONSIBLE AND RESPONSIVE
FOR THE TOTAL
OF CAPITAL
BID IS FROM
AMOUNT
bidder explain:
IMPROVEMENTS THAT THE
HERALPIN USA INC.
OF $134,884.118
It the above contractor is not the lowest
See sit. I of 3
• PREPARED BY: VICTOR IdARZA
REVISED BY: JUAN B. ORDONEZ, P.B.
DAM: APRIL 21, 2004
SENSE 3 Ot, 3