HomeMy WebLinkAboutSchool Brd RecommApr 30 2004 8:49AM SITE PLRNNING 3059954760
p.22
•
•
•
**UPDATED**
April 30, 2004
SCHOOL IMPACT REVIEW ANALYSIS
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT
TRIGGERED SINCE THE APPLICANT I5 NOT REQUESTING ADDITIONAL
RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE
PROPERTY'S ZONING CLASSIFICATION.
APPICATION: Metropolitan Miami (One Miami)
REQUEST: Major Use Special Permit (MUSP)
ACRES: 9.32 acres
LOCATION: 300 and 200 S.E. 3`l Street and 200 S.E. 2 Street, Miami
NUMBER OF
UNITS:
1,500
MSA: 4.7 = 0.22 Multifamily
ESTIMATED STUDENT
POPULATION: 330
ELEMENTARY: 152
MIDDLE: 83
SENIOR: 95
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY: Riverside Elementary — 1 190 S.W. 2"d Street
MIDDLE: Jose De Diego Middle — 3100 N.W. 5th Avenue
SENIOR HIGH: Booker T. Washington Senior — 1200 N.W. 6th Avenue
*Based on Census 2000 information provided by the Miami -Dade County Department of
Planning and Zoning.
Page 1 of 1
Apr 30 2nn4 9:4SAM SITE PLANNING 3059954760
P.3
The following population and facility capacity data are as reported by
Information Technology, as of March 2004.
STUDENT
POPULATON
FISH DESIGN
CAPACITY
PERMANENT
% UTILIZATION
FISH DESIGN
CAPACITY
PERMANTENT
Riverside 1,097/ 110%/
Elementary 1,249* 126%""
Jose De Diego 1,322/
Middle 1,405*
Booker T.
Washington Senior
995
NUMBER
OF
PORTABLE
STUDENT
STATIONS
0
the Office of
% UTILIZATION
FISH DESING
CAPACITY
PERMANENT
AND
RELOCATABLE
11 0%
126%*
112%/ 112%1
1,179 0
119%* 119%*
1,477/ 59%/ 59%/
1,572* 2,499 63%* 0 63%*
*Includes proposed development. The cumulative effect of other approved or proposed
development is not part of this analysis.
Pursuant to the Interlocal Agreement, please note that Riverside Elementary and Jose
De Diego Middle schools meet the review threshold.
ADDITIONAL SCHOOL INFORMATION: The following information was provided by
school site personnel or other data sources in October 2003:
Riverside Elementary
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
instructional purposes:
Teachers required to float/travel:
Page 2of2
K through 5th grade
New alarm system was installed
Annenberg Challenge Extraordinary
Commitment to Academic Excellence
Community classes and others (Kiwaniis
Tutoring, Time Dollars, Heat Academy,
Family Literacy Program and Police
Athletic League)
Beings at 9:45 a.m. - ends at 1:30 p.m.
Rooms 126, 128, 202, 204, 211, 212,
235, 237, 238 Computer Lab
10 - Spanish, Art, and Music
Rtar 30 2004 S : 4SRM SITE PLRNN I NG
3059954780 P.4
•
Jose de Diego Middle
(Built in 1999)
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
instructional purposes:
Teachers required to float/travel:
•
Booker T. Washington Senior High
Access to computers:
Capital Improvements since 1990:
Recognition for Academic Achievement:
Special Programs:
Lunch schedule:
Non -instructional space utilized for
Instructional purposes:
Teachers required to float/travel:
•
In each classroom (6`h -- 8th grade),
special computer labs and Media
Center.
P.E, area was re -done.
None
None
Begins at 11:40 a.m. — ends 1:55 p.m.
Auditorium is used for Social Studies
classes. Cafeteria is used for SCSI.
Room 207 is used for an EH class and it
is a teacher planning room.
Page 3 of 3
Four (Spanish, ESCL, Math and Social
Studies)
In each classroom, special computer
labs and Media Center
Conversion to senior high school 2001
None
Enrichment classes and community
classes
10:30 a.m. — 12:30 p.m.
None
None
Apr 30 2004 6:49AM SITE PLANNING 3059954760
p.5
•
•
•
PLANNED RELIEF SCHOOLS IN THE AREA (Information as of April 2004):
School Status Occupancy Date
None
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade
students amounts to $5,833 per student. The total annual operating cost for additional
students residing in this development, if approved, would total $1,924,890.
CAPITAL COSTS: Based on the States April 2004 student station cost factors*, capital
costs for the estimated additional students to be generated by the proposed
development are:
ELEMENTARY 152 X $13,365 = $2,031,480
MIDDLE 83 X $15,324 = $1,271,892
SENIOR 95 X $20,278 = $1,926,410
Total Potential Capital cost $5,229,782
*Based on Information provided by the Florida Department of Education, Office of
Educational Facilities Budgeting. Cost per student station does not include land cost.
Page 4 of 4