Loading...
HomeMy WebLinkAboutSchool Brd RecommApr 30 2004 8:49AM SITE PLRNNING 3059954760 p.22 • • • **UPDATED** April 30, 2004 SCHOOL IMPACT REVIEW ANALYSIS FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT I5 NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PROPERTY'S ZONING CLASSIFICATION. APPICATION: Metropolitan Miami (One Miami) REQUEST: Major Use Special Permit (MUSP) ACRES: 9.32 acres LOCATION: 300 and 200 S.E. 3`l Street and 200 S.E. 2 Street, Miami NUMBER OF UNITS: 1,500 MSA: 4.7 = 0.22 Multifamily ESTIMATED STUDENT POPULATION: 330 ELEMENTARY: 152 MIDDLE: 83 SENIOR: 95 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: Riverside Elementary — 1 190 S.W. 2"d Street MIDDLE: Jose De Diego Middle — 3100 N.W. 5th Avenue SENIOR HIGH: Booker T. Washington Senior — 1200 N.W. 6th Avenue *Based on Census 2000 information provided by the Miami -Dade County Department of Planning and Zoning. Page 1 of 1 Apr 30 2nn4 9:4SAM SITE PLANNING 3059954760 P.3 The following population and facility capacity data are as reported by Information Technology, as of March 2004. STUDENT POPULATON FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANTENT Riverside 1,097/ 110%/ Elementary 1,249* 126%"" Jose De Diego 1,322/ Middle 1,405* Booker T. Washington Senior 995 NUMBER OF PORTABLE STUDENT STATIONS 0 the Office of % UTILIZATION FISH DESING CAPACITY PERMANENT AND RELOCATABLE 11 0% 126%* 112%/ 112%1 1,179 0 119%* 119%* 1,477/ 59%/ 59%/ 1,572* 2,499 63%* 0 63%* *Includes proposed development. The cumulative effect of other approved or proposed development is not part of this analysis. Pursuant to the Interlocal Agreement, please note that Riverside Elementary and Jose De Diego Middle schools meet the review threshold. ADDITIONAL SCHOOL INFORMATION: The following information was provided by school site personnel or other data sources in October 2003: Riverside Elementary Access to computers: Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for instructional purposes: Teachers required to float/travel: Page 2of2 K through 5th grade New alarm system was installed Annenberg Challenge Extraordinary Commitment to Academic Excellence Community classes and others (Kiwaniis Tutoring, Time Dollars, Heat Academy, Family Literacy Program and Police Athletic League) Beings at 9:45 a.m. - ends at 1:30 p.m. Rooms 126, 128, 202, 204, 211, 212, 235, 237, 238 Computer Lab 10 - Spanish, Art, and Music Rtar 30 2004 S : 4SRM SITE PLRNN I NG 3059954780 P.4 • Jose de Diego Middle (Built in 1999) Access to computers: Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for instructional purposes: Teachers required to float/travel: • Booker T. Washington Senior High Access to computers: Capital Improvements since 1990: Recognition for Academic Achievement: Special Programs: Lunch schedule: Non -instructional space utilized for Instructional purposes: Teachers required to float/travel: • In each classroom (6`h -- 8th grade), special computer labs and Media Center. P.E, area was re -done. None None Begins at 11:40 a.m. — ends 1:55 p.m. Auditorium is used for Social Studies classes. Cafeteria is used for SCSI. Room 207 is used for an EH class and it is a teacher planning room. Page 3 of 3 Four (Spanish, ESCL, Math and Social Studies) In each classroom, special computer labs and Media Center Conversion to senior high school 2001 None Enrichment classes and community classes 10:30 a.m. — 12:30 p.m. None None Apr 30 2004 6:49AM SITE PLANNING 3059954760 p.5 • • • PLANNED RELIEF SCHOOLS IN THE AREA (Information as of April 2004): School Status Occupancy Date None OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $5,833 per student. The total annual operating cost for additional students residing in this development, if approved, would total $1,924,890. CAPITAL COSTS: Based on the States April 2004 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 152 X $13,365 = $2,031,480 MIDDLE 83 X $15,324 = $1,271,892 SENIOR 95 X $20,278 = $1,926,410 Total Potential Capital cost $5,229,782 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost. Page 4 of 4