Loading...
HomeMy WebLinkAboutdade county agreement 2• �d`3►�R''+i3.1'rSr...'d('�y e;-.. ••�...Y6':+'u�:' .r��, f ••r+;r,•t.,n•,riji..:, ,•;1".. 14 4' )I Quality Neighborhoods Improvement 0 Program Working Together for a air Commaniri CN,IP PROJECTS INCLUDE EMPLOYMENT OPPORTUNmES FOR LOCAL RESIDENTS. FOR INFORMATION CALL 105-375-1900 PROJECT NAME PROJECT NUMBER COST OF PROJECT Mery BOARD OF COUNTY COMMISSIONERS Citrra.. f Ciarna J Oiarne J Ciarrcf 4 Ciaures s oiarna Q Ciatnef T Clawyarsan NOTE: PLACE NAMES 1N ORDER .AS THEYAPPEAR ON FLY SHEET OF CONTRACT DOCUMENTS Caunry manager Care. d Cirri Cisfne 1Q ~Oiare f f Ciama 17 oiasna f7 Cavnry.1Aomay Miam►Oaea County xevlafts acwf accaa l and acual eoaenvn ry in ameroyTanr and wen", Mid doaa nar efacmmutala on Off :aa,a el ciaa0IYry. .MIAMI-DADE PUBLIC UVORKS DEPARTMENT 16" 12" 28" - 3" WORK ORDER CONTRACT Revised 04/18/2001 36 CONTRACT 441 This agreement made and entered into this 1. yay of SYNC in the year by and between MIAMI-DADE COUNTY, FLORIDA, a political subdivision of the State of Florida, acting by and through the BOARD OF COUNTY COMMISSIONERS, party of the first part, and Envirowaste 5f3/ 3J/S56 (arra Services Group, Inc. --4-9 S.W. 88tb Street — Miami, Florida 3-3 5, party of the second part. WITNESSETH: That the parties hereto, for the consideration herein set forth mutually agree as follows: Article 1. SCOPE OF WORK: The Contractor shall furnish all plant, labor, materials, and equipment and perform all the necessary work in the manner and form provided in the Contract Documents entitled: Storm Drain System Clean -Out — Contract No. 7 — Project Number: 629528 Article 2. CONTRACT SUM: The County shall pay to the Contractor, for the faithful performance of the Contract, in lawful money of the United States of America, and subject to the additions and deductions as provided in the Contract Documents, a total sum as follows: Based on the Contract prices shown in the Proposal heretofore submitted to the County, a copy of said Proposal being a part of the Contract Documents, the aggregate amount of this Contract (obtained from either the lump sum price, the application of unit prices to the quantities shown in the Proposal or the combination of both) not to exceed: One Million Seven Hundred Fifty Thousand Dollars And No Cents ($1,750,000.00) Article 3. PAYMENTS: Whenever the work provided for 'in an individual work order has been completed in accordance with the requirements of these specifications and final acceptance has been made by the Engineer, an estimate for the full value (less 10% retainage) of the work performed for the work order will be submitted by the Contractor to the County requesting payment on its company letterhead. The request for payment shall be a copy of the Contract Bid Forms indicating those quantities or Lump Sum items utilized corresponding to the submitted monthly requisition. The Engineer will then take the necessary measurements and computations for verification. Within twenty (20) days thereafter, payment for the full amount (less 10% retainage) thus determined shall be paid to the Contractor. Upon completion of an entire work order involved in this Contract, including all required restoration, and upon acceptance thereof in writing by the Engineer and by the County, the balance due the Contractor for the entire work order shall be paid. If during the progress of the work it appears that the Contractor's bills for materials and labor are not being paid, the County shall have the right to withhold from the Contractor's payment sufficient sums to protect itself against all losses from possible liens, and to apply the said sums to the payment of such debts. Work Order Page 1 of 4 37 CONTRACT Upon request of the Engineer, the Contractor shall present to the County Finance Director satisfactory evidence that all liens, claims and demands of both the prime contractor as well as his subcontractors employed in the construction of the work are fully satisfied, and that the project is fully released from all such liens, claims, and demands. In the event the prime contractor is unwilling to provide a release from all liens, claims and demands, 30 calendar days after the completion and acceptance of the work will be the maximum period provided for the submittal of all claims. Miami - Dade County does not by this provision assume any responsibility or liability to any person other than the prime Contractor. No payments, either partial or final, are to be made for any material which is to be used for falsework or plant, but payment is to be made only for materials which are left permanently in the finished work and form a part of it. The Engineer may, at his discretion, allow temporary partial payments for plant and falsework, but the Contractor shall have no right to demand such compensation. The schedule prices to be employed in marking partial payments shall be determined by the Engineer. The prices for the estimates of the work clone will be based on the prices shown in the Proposal and the Bid, and payment will be made thereon as herein provided. Article 4. EXTRA WORK OR UNCLASSIFIED WORK: Quantities of work or materials in excess of those named in the Proposal and Bid, and of the same kind, are not to be considered as extra work. and such excess when ordered by the Engineer, will be paid for at Contract rates as specified in the Proposal. Aside from work thus included in the schedule, no claims whatever for extra work will be considered or paid, except only when ordered in writing by the Engineer at a price stated in the order. The Engineer's authority to order extra work is expressly limited to One Thousand Dollars ($1,000.00) on this Contract, unless specifically authorized in writing by the County Commissioners to exceed this amount. Article 5. AUDIT RIGHTS: The County retains the right to audit all work performed on a force - account basis, and also to audit the work performed under lump sum change orders, such rights being retained for a period of one year after acceptance of the work by the County, provided however, that said audit rights shall not apply to lump sum changes after pavment has been made by the County for said changes. Article b. CONTRACT DOCUMENTS: The Documents hereinafter listed shall form the Contract and they are as fully a part of the Contract as if attached hereto: 1. Advertisement for Bids 2. Instructions to Bidders 3. Schedule of Prevailing Wages (when applicable) 4. Proposal 5. Approved Bid Bond 6. General Specifications 7. Special Provisions 8. Detailed Specifications (when applicable) 9. Contract 10. Contractor's Performance and Payment Bond 11. Maintenance Performance and Payment Bond (when applicable) 12, Plans entitled: "No Separate Plans To This Project" 13. Addendum No. 1 — Dated February 21, No. 2 — Dated — February 23. & No. 3 — Dated February 27, 2001 Page 2 of g8 Public Works Department Storm Drain Cleaning Project Project# 629528 INVOICE #23 Work Period 0510512003 to 6/08/2003 Work Order No. 9 Envirowaste Services Group, Inc. DIRECT INQUIRES TO: B. Rafael Barba, P.G., President Envirowaste Services Group, Inc. 5931 SW 88 Street Miami, Florida 33156 (305) 740 6315 PLEASE SEND PAYMENT TO: Envirowaste Services Group, Inc. 5931 SW 88 Street • Miami, Florida 33156 DATE: July 15, 2003 FAX (305) 740-6316 PLEASE BILL TO: Miami Dade County Public Works C/O; Consul -Tech Engineering, Inc. 10570 NW 27t Street, Suite 101 Miami, FI. 33172 ATTENTION: Mr. Carlos Mello!, P.E. FOR SERVICES PROVIDED FROM: 05/05/2003 TO 6/08/2003 INVOICE DESCRIPTION: Services towards the cleaning of storm drains. Contract #: 629528 Finance Number. Inlet Cleaning — HIC830981.IPW099.99114 Pipe Cleaning — H1A810981.1PW043.99114 TOTAL AMOUNT OF CONTRACT: TOTAL WORK ORDER AMOUNT: AMOUNT BILLED TO DATE: AMOUNT THIS INVOICE: LESS I. G. FEE: LESS 10% RETAINER: AMOUNT THIS INVOICE: $ 49,959.97 We hereby certify that charges included herein are proper charges and correct summations from our records. Eduardo J. Barba. Vice President Envirowaste Services Group, Inc. $1 ,750,000.00 $ 55,135.00 $ 55,665.70 $ 55,665.70 $ 139.16 $ 5,455.57 39 FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) MI-DADE COUNTY led STORM DRAIN .CLEANING ESTIMATE OF CONSTRUCTION PUBLIC WORKS DEPARTMENT PROJECT REQUISITION AND PAYMENT CERTIFICATE Storm Drain Cleaning Project ation: Zone No. 2 s requisition is submitted for work performed From: 5/5/2003 To: 6/8/2003 Contract No. 7 Project No. 629528 Work Order No. 9 Requisition No. 23 Date: 6/17/2003 CONTRACT AMOUNT: $2,012,500.00 TOTAL WORK ORDER AMOUNT TO DATE (9): $55,135.00 TOTAL CONTRACTOR'S WORK TO DATE: $55,665.70 LESS 10% RETAINED: $5.566.57 SUBTOTAL $50,099.13 ITEM No. 999-2 - ACCUMULATED INSPECTOR GENERAL COST TO DATE $139.16 AMOUNT DUE TO DATE: $49,959.97 LESS PREVIOUS PAYMENTS: $0.00 AMOUNT DUE TO CONTRACTOR THIS REQUISITION (WO #9): $49,959.97 APPRAVPr1 ENVIROWASTE SERVICES GROUP, INC. CONTRACTOR BY DATE TITLE NDING CODES: el Cleaning: APPROVEQ °860981.IPW049.99114 )e Cleaning: F860981.JPW042.99114 Project Administrator Date counting Section - PW Dept Date Chief of Construction Division Date xiro Cueto (Project Engineer) reject Diary: WA Date Director tattaarjaMigyalE Dale 40 Internet Auditing Date FEDERAL EMERGENCY MANAGEMENT AGENCY (FL.MA.) STORM DRAIN CLEANING ESTIMATE OF CONSTRUCTION cam•; 23 Envirowaste Services Group k,nDsr: Inlet Cleaning • HIC8309S1.IPW099.99114 Project Number: 829528 Work Order: Work Period From Ter S/5/2003 6/8/2003 • WORK ORDER WORK PERFORMED :M NO DESCRIPTION BUDGET BUDGET CODE ACTIVITY UNIT UNIT PRICE WORK ORDER QUANTITY WORK ORDER AMOUNT PREVIOUSCURRENT REQUISITION REQUISITION QUANTITY CURRENT REQUISITION AMOUNT TOTAL AMOUNT TO DATE 1.1A Cleaning of concrete slab covered trench (Catch Basin pus 1Cr in inch daecticn • any width)• Pipe Cicaning LF 4.05 • 20 • $81 30.00 0.00 $0.00 30.00 2•48 Clearing of concrete slab covered trench (Catch Basin Out 10' in one direction - any vrldm) Pipe Cleaning I.F 4.05 40 3162 50.00 0.00 50.00 $0.00 2.3A Storm Culvert Cleaning - (18 Inches Or Less • inside Diameter) Pipe Clearing LF 3.45 9.030 $31,154 30.00 1 3.021.00 $10.422.45 $10.422.45 2.30 - Storrs Calvert Cl.anin9 - (Greater Than 18 Inches To 30 Inches - Inside Diameter) Pipe Peening LF' 3.49 1,600 $5.584 $0.00 1,115.00 56.043.05 $6,043.05 . 2.3C Storm Culvert Cleaning • (Greeter • Than 30 Inches To 42 Inches - Inside Diameter) Pipe Cleaning LF 3.56 1.600 $5.696 50.00 10.525.00 337,460.00 337.469.00 2-30 Storm Calves Cleaning • (Grater Then 42 inches - Inside Diameter) Pipe Cleaning LF 3.50 1,400 35.320 50.00 456.00 31.854.40 61.654.40 1.2A Inlet Cleaning • Inlet Cleaning EA '6.85 210 51,439 50.00 • 12E.00 • 5878.80 $876.80 1.3.4 Removal of Catch Basin Grease and de Separator • MysIse (pipe diameter sizes range from 1 r to 42') • keel Cleaning SE.PAR 5.00 10.00 350 30.00 0.00 30.00 $0.00 13-5 Removal of Seel Reinforcing Bars (Torch or Cut) Inlet (leaning PER / INLET 65.00 10.00 $650 30.00 v . 0.00 $0.00 50.00 r1-70 Furnish and Install Catch Basin Grease And Separator (Installation at Engineers Discretion) AM Silas (Diameter site ranges from 18' to 42) Inlet Cleaning 1 p I SAR 600.00 10.00 35.000 $0.00 0.00 $0.00 $0.00 ALS 55.135 30.00 C 156,665.70 355,665.70 • Less 10% Retainer $5.586.57 35.566.57 Subtotal 1- $50.099.13 350,099.13 Less Inspector General Fee $139.16 3139.16 Tolal Invoice Amount 149459.97 542,959.97 41 project Number. 629525 monthly Est : 23 TOWN RANGE SECTION 82 40 35 Work Order: 9 Work Period From To 5/5/2003 6l812003 WORK ORDER WORK PERFORMED PAY ITEM NO • DESCRIPTION BUDGET CODE ACTIVITY UNIT • UNIT PRICE PREVIOUS REQUISITION CURRENT REQUISITION QUANTITY CURRENT REQUISITION AMOUNT TOTAL AMOUNT TO DATE 110-2-1A Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction - any width) Pipe Cleaning LF 4.05 $0.00 0 30.00 $0.00 110-2-16 Cleaning of concrete sieb covered trench (Catch Basin plus 10' h one direction • any width) Pipe Cleaning LF 4.05 50.00 0 50.00 30.00 110-2-3A Storm Culvert gleaning • (18 Inches Or Less - Inside Diameter) Pipe Cleaning LF 3.45 $0.00 714 32,463.30 32.463.30 110.2.3E Slone Culvert Cleaning - (Greater Than 18 Inches To 30 Inches • Inside Diameter) r Pipe Cleaning - LF 3.49 30.00 1,078 $3,762.22 33,762.22 110-2-3C Storm Culvert Cle nine • (Greater Than 30 Inches To 42 Inches - Inside Diameter) Pipe Cleaning LF 3.56 50.00 " , 7,014 • • 37,169.84 37,169.84 110-2-3D • Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) Pipe Cleaning LF 3.60 30.00 ' 0 30.00 $0.00 110-2A Inlet Cleaning Inlet Cleaning EA 6.85 50.00 37 $253.45 3253.45 110-3-4 • Removal of Catch Basin Grease and oil Separator - Myskze (pipe diameter sizes range from 18• to 421 Mist Cleaning SEPAR 3.00 30.00 • 0 30.00 30.00 110-3-5 Removal of Steel Reinforcing Bars (Torch or Cut) Inlet Cleaning PER f• INLET • 65.00 •30.00 0 50.00 50.00 425-1. 0 _,(Diameter Furnish and Install Catch Basin Grease And OP Separator {Inatelatlon a! Engineer's discretion) Al Sizes size ranges from 1r to 421 Inlet Cleaning PER l SEPAR 500.00 30.00 - 0 30.00 30.00 TOTALS 50.o0 I I 313,646.81 313,646.81 I •42 STORM DRAIN CLEANING ■ WEEKLY REPORT FROM 'TO Ci WORK ORDER NO` SECT TOWN RANGE DESCRIPTION DATE Moncay I : 1 Too sin 4• /. Wear0Iy / Thursday S/jz F ram tit Saturou S■r+iiar - TOTAL Cleaning of concrete stab covered trench (Catch Basin plus 10' in each direction - any width) Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) •r r Storm Culvert Cleaning - (18 Inches Or Less • Inside Diameter) Storm Culvert Cleaning • (Greater Than 18 Inches To 30 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) . Storm Culvert Cleaning - (Greater Than 42 Indies - Inside Diameter) Inlet Cleaning Remove) of Catch Basin Grease and Oil Separator-Anysize (pipe diameter sizes range from le" to 42") Removal of Steel Reinforcing Bars (Torch or Cut) Furnish and Install Catch Basin Grease 0 And Oil Separator (Installation at Engineer: discretion) All Sizes (Diameter size ranges from 18" to 421 +ITS: OR: r '4. ✓1 .4 +/ i / 511 V 1 rr{rr'i t 1 SIGNATURE !DATE: or..--,4' �%. i 43 • FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) STORM DRAIN CLEANING WEEKLY REPORT ACTOR: C O/Z%S t 117 �zArAI 7y.' ;T NO: / .EMI NO ,2.1A .2-1 B ,2.3A .2.38 .2.3C .2.3D 0-2A 0-3.4 0-3-5 5-1.70 DESCRIPTION Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction • any width) Cleaning of concrete slab covered trench (Catch Basin plus 10'in one direction - any width) Storm Culvert Cleaning - (18 Inches Or Less • Inside Diameter) Stone Culvert Cleaning - (Greater Than 18 Inches To 30 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) Inlet Cleaning Removal of Catch Basin Grease and Oil Separator - Anysize (pipe diameter sizes range from 18- to 421 Removal of Steel Reinforcing Ban • (Torch or Cut) DATE Furnish and Install Catch Basin Grease And Oil Separator (Installation at Engineer's discretion) All Sizes (Diameter size ranges from 18' to 421 IMENTS: /1-74'/1u y Vie' DATE: WORK ORDER NO: -ve 7 . 5z V) FROM QS '19- 6-1 TO 'L5 cst3 SECT TOWN RANGE Sunday Monday Tuesday Wacnarday Thursday Friday Saturday 2 615"-du 115--11 a -.ZJ ea --X dr-zs" F75-' i.,5- )- • r i./4 5 1 1 6-6 / 2e ,as J r C713 5.ef R.Vz • Q jo V r�+rti/ i TOTAL y2� i 1'3 22 ��%% 11 CTOR: /7 4, N4-74" �� SIGNATURE / DATE: c 6 •2 6 r? 3 44 ;TOR: . NO: FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) STORM DRAIN CLEANING WEEKLY REPORT i .c1/2ctz- rif-S re 1ZfL€ WORK ORDER IVO: 5Z_ FROM f .i -.2 /-03 TO a o c*x -03 SECT TOWN RANGE .....-- N NO DESCRIPTION DATE Mande 1ussday Wednesday Thursday Friday SaIuv ay Sunday —��—' TOTAL 05 It dS =2.7 es-- Ae es- 25 8,s- -JO QS-31 60- di- IA Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction - any width) Cleaning 18 of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) _ r— Storm Culvert Cleaning - (18 Inches Or Less Inside Diameter) 4 ` / I (� t ��� . . 38 -Storm Culvert Cleaning - (Greater Than 18 Inches To 30 Inches - Inside Diameter) ` / , J Y l 3C Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches • Inside Diameter)•O� --.0--- f Q�� r f`-�'r �� J 3D I-4 I-5 Storm Culvert Cleaning - (Greater Than 42 Inches - inside Diameter) k:t/tIr‘ Intel Cleaning • 1 3 v _ 7 Removal of Catch Basin Grease and Oil Separator - Anysize (pipe diameter sizes range from 18" to 42") y Removal of Steel Reinforcing Bars (Torch or Cut) 'l 3�t' .70 Fumish and Install Catch Basin Grease And OII Separator (Installation at Engineers discretion) All Sizes (Diameter size ranges from 18" to 42") . :PITS: Mb/ — z(ryjN roR: /A6;a1-r;LI(2c SIGNATURE 1 DATE: 45 rCNGfM4 Gmcn% •.r • w•r.nr %n_I••r•• • .•••..•ti•w • ti• .r..•t•.n,� STORM DRAIN CLEANING WEEKLY REPORT TION: fa-Afe RACiOR: i ivlamu!� ECT NO: OATE, • -u •a3 JOS-4 '&cT 3 FROM TO SECT TOWN WORK ORDER NO: ITEM NO DESCRIPTION • DATE Monody Tuasa�y Wetvis day Thursday Fraay Saivaay Sunday — IZ dr-41 d3--iie es--4r • ...�" 4'7r ars--, TOTAL 0-2.1A Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction • any width) .— r 0-2.18 Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) , _r • 0-2.3A Sloan Culvert Cleaning - (18 Inches Or Less - Inside Diameter) • 0-2.38 Storm Culvert Cleaning - (Greater Than 18 Inches To 30 inches - Inside Diameter) 10 '� 0-2-3C Storm Culvert Cleaning • (Greater Than 30 inches To 42 Inches -Inside ❑iameter) r J C 1• llz 0-2-3D Storm Culvert Cleaning - (Greater' Than 42 Inches • Inside Diameter)• •` !V • 10-2A Intel Cleaning • 131. 10.34 Removal of Catch Basin Grease and ' Oil Separalor-Anysize(pipe diameter sizes range from 18" to 42") 1�D• • 10-3-5 Removal of Steel Reinforcing Bars (Torch or Cul)• 25.170 •Engineer's Furnish and Install Catch Basin Grease• And Oil Separator (Installation at discretion) All Sizes _lOiameter size ranges from 18" to 4211 • • MMENTS: 'ECTOR: y ? A/1/0"•••€ /Ne 76Al Cie4 SIGNATURE / DATE: 46 'Project Number: 629528 Monthly Est.. 23 PAY ITEM NO 110.2.1 A 110.2.10 110-2-3A 110.2-313 110.2.3C 425-1.70 TOTALS 1 110.2-3D 110.2A 110.3-4 110-3-5 1 1 DESCRIPTION Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction - any width) TOWN 52 RANGE 40 SECTION 26 BUDGET CODE ACTIVITY Pipe Cleaning Cleaning of concrete slab covered trench (Catch Basin On 10' In one Pipe Cleaning direction • any width) Storm Culvert Cleaning - (18 Inches Or Less - Inside Diameter) Work Order: 9 Work Period From To 515/2003 6/8/2003 Pipe Cleaning Storm Culvert Cleaning - (Greater Than 18 Inches To 30 Inches • Inside Pipe Cleaning Diameter Storm Culvert Cleaning - (Greater Than 30 Inches•To 42 Inches - Inside Diameter) • - Storm Culvert Cleaning - (Greater Than 42 Inches - Iniide Diameter) Pipe Cleaning Pipe Cleaning WORK ORDER UNIT LF LF LF LP LF LF Inlet Cleaning Inlet Cleaning I EA Removal of Catch Basin Grease and' Oil Separator - Anystze (pipe diameter Inlet Cleaning sizes range from 18' to 421 Removal of Steel Reinforcing Bars (Torch or Cul) Furnish and Install Catch Basin Grease And Olt Separator (installation at Engineer's discretion) Ail Sizes (Diameter size ranges from 18' to 42� • PER1 SEPAR Inlet Cleaning 1 INLET Inlet Cleaning PER ! SEPAR UNIT PRICE 4.05 4.05 3.45 3.49 3-56 3.80 6.85 5.00 65.00 500.00 47 PREVIOUS REOUISITION 50.00 50.00 50.00 50.00 50.00 S0.00 50.00 50.00 50.00 $0.00 S0.00 WORK PERFORMED CURRENT REQUISITION QUANTITY 1 0 0 867 0 4,197 0 33 0 0 0 CURRENT REQUISITION AMOUNT 50.00 50.00 52.991.15 S0.00 $14,941.32 50.00 $226.05 50.00 50.00 50.00 TOTAL AMOUNT TO DATE 50.00 50.00 52,991.15 50.00 514.94i.32' 50.00 $226.05 50.00 50.00 50.00 518.158.52 $18.158.52 ■ a r unm vewir. vw.I.,,.... WEEKLY REPORT OR: •} N0 !AA z•18 2.3A .2.38 1-2.3C )440 t0-2A 10-3- 110.34 i25-170 Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction • any width) Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction • any width) Storm Culvert Cleaning - (18 Inches Or Less - inside Diameter) Storm Culvert Cleaning - (Greater Than 18 Inches To 30 Inches - inside Diameter) Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) Removal of Catch Basin Grease and Oa Separator - Anysize (pipe diameter sues range from 16" to 421 1 :oMMENTS: 1 1 !LECTOR: Furnish and Install Catch Basin Grease And Oa Separator (Installation at Engineer's discretion) All Sizes Diameter size ran es from 18" to 4 i/ FROM ATE. SIGNATURE ! DAT I /i1 �,i WORK ORDER NO: SECT TOWN :RANGE -.....-• 48 I Vnm Lrv".n WEEKLY REPORT acTOR: ;TNO' FROM ATE: y 551 t:i TO' r . WORK ORDER NO: SECT TOWN L1 RANGE DESCRIPTION «� µ/la�i tw.aar W.anewav Tnrsaar Friday Saiura.r ww & r TOTAL DATE J%'�`'.sr. ( -f? i (Ai ?-L ::'•= . >>;'. v ';I'••. •2,IA __....--- .2.18 •2-3A Cleaning of cancsete stab covered trench (Catch Basin plus 10' in each direction - any width) T Cleaning of concrete slab covered. trench (Catch Basin plus 10' in one direction - any width) Storm Culvert Cleaning - (15 Inches Or Less -inside Diameter)Loc. . t ! J,.t• 7-, r ?j ter ' 1 •240 Storm Culvert Cleaning - (Greater Than 1'8 Inches To 30 Inches - Inside Diameter) _2.3C Storm Culvert Cleaning - (Greater Than 30 Indus To 42 Inches - Inside Diameter) �t f . ,, d 4..,; w �i ) , , r 1 a,°�} ' -' - - „ <.7 / 1 —. , �'. r^" 14'3f] Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) . JL . , ' 0.2A Inlet Cteaning ..--~ 0.3.4 Removal of Catch Basin Grease and Separator05 ange from 18" to 4(pipe diameter ") sizes . - 10.3.5 Removal of Steel Reinforcing Bars (Torch or Cut) ----Furnish l5.1-70 and Install Catch Basin G`- rease And Oil Separator (Installation at Engineer's discretion) All Sues ._. .-•-- r......,a-in.7"1 MMENTS: 1 .00 °ECTOR: L; 5 Sej it f SIGNATURE ! DATE:.,.r• 1 49 STORM DRAIN CLEANING WEEKLY REPORT • ITRACT 1,. CT NO: 110-2' 110-2 110-2 1t0• 110 110• 110 425- FROM }ZATE• TO ' i WORK ORDER NO: RANGE SECT TOWN Monday Tuesday Wednesday Thurediy Fnday Sseaaay Sunday w TOTAL M NO DESCRIPTION DATE ` IA trench Cleaning of concrete slab covered (Catch Basin plus 10' in each direction - any width) + • i 19 Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) �_ • ' ,7 j / • 3A Storm Culvert Cleaning -(18 Inches• Or Less - Inside Diameter) .. ; :: ' r. r r " {;J .2-2. 6 .3B Storm Culvert Cleaning '- (Greater Than 18 Inches To 30 Inches - Inside Diameter) f • ' -3C Storm Culvert Cleaning - (Greater Than 30 inches To 42 Inches •Inside Diameter) �, ;, 1f •. _' � _ , •— ,. ,,. } r. • •c .L;rA t 7 ' "30 I Stone Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) • • .2A Inlet Cleaning I ..` n / 7 3.4 Removal of Catch Basin Grease and Oil Separator - Anysize (pipe diameter sizes range from 18" to 421 - 4 j . 3.5 Removal of Steel Reinforcing Bars ' (Torch or Cul) • ' 1.70 Furnish and Install Catch Basin Grease And Oil Separator (Installation at Engineer's discretion) All Sizes !Diameter size ranoes from wit:, 421 • • • COMMENTS: i i HI 3 P !SPECTOR: 7. 1 4 • OE- 4,7 ' 3 SIGNATURE f DATE:r. r ~ 50 'project Number: 629528 monthly Est : 23 TOWN RANGE ' • SECTION 52 41 • 32 Work Order- 9 Work Period From To 5/5/2003 6/812003 • • WORK ORDER WORK PERFORMED PAY ITEM NO DESCRIPTION BUDGET CODE ACTIVITY UNIT UNIT PRICE PREVIOUS REQUISITION CURRENT REQUISITION QUANTITY CURRENT REQUISITION AMOUNT TOTAL AMOUNT TO DATE 110-2.1A Cleaning of canasta slab covered trench (Catch Basin plus 10' in each direction - any width) Pipe Cleaning LF 4.05 50.00 ' 0 50,00 50.00 r 110.2-1B Cleaning of concrete stab covered bench (Catch Basin plus 10' In one diection - eny width) Pipe Cleaning LF 4.05 50.00 0 50.00 50.00 110 2.3A Sloan Cleaning - (18 Inches Or Less - inside Diameter) Pipe Cleaning LF • 3.45 • • S0.00 655 52,949.75 52.949.75 110-2.38 Storm Culvert Cleaning - (Greater Than 18 Inches To 30 Inches • Inside Diameter) Pipe Cleaning LF 3.49 50.00 0 50.00 50.00 110-2-3C Storm Culver% Cleaning • (Greater Than 30 Inches To 42 inches - Inside Diameter) Pipe Cleaning LF 3.56 50.00 ' •110 3.567 . - 512,698.52 $12,698.52 2:3D Storm CuKen Cleaning - (Greater Than 42 Inches - Inside Diameter) Pipe Cleaning LF • 3.80 50.00 0 50.00 50.00 110-2A Inlet Cleaning • Inlet Cleaning EA 6.85 50.00 31 5212.35 5212.35 110-3-4 Removal of Calch•Basin Grease and Oil Separator - Anysize (pipe diameter 'sixes range from 18" l0 421 inlet Cleaning PER 1 SEPAR 5.00 50.00 0 50.00 50.00 110-3-5 Removal al Steel Reinforcing Ban (Torch or Cut) • inlet Cleaning PER ! INLET 65.00 50.00 0 S0.00 ' $0.00 425-1-70 Furnish end Install Catch Basin Grease And 01 Separator (Instabatian at Engineer's discretion) Al Sixes (Diameter size ranges Irom 16' to 421 Inlet Cleaning PER! SEPAR 5()D.OD $0,00 0 50.00 50.00 TOTALS 50.00 $15.860.62 $15.860.62 STORM DRAIN CLEANING WEEKLY REPORT ATiO .,... ;TRACTOR: "..."—'1.001.1 p ��.�S �i3 /Gb FROM JECT NO: Y ITEM NO t 10.2.1A 110.2.1 B DESCRIPTION Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction - any width) Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) DATE ATE: WORK ORDER NO q c'Sizs 0*, 37- 5'2. < l TO SECT TOWN RANGE o Doh t M 5 3 as�E TOTAL o s/ �c .o5j'i Monthly 76teaday wsonaaday Thirstily 110.2.3A 110-2-3B 110.2-3C 110.2.3D 1 0-2A 110-3■4 110.3.5 425.1-70 Storm Culvert Cleaning - (18 inches Or Leas - Inside Diameter) COMMENTS: Stone Culvert Cleaning '- (Greater Than 1B Inches To 30 inches -Inside Diameter) Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches • Inside Diameter) Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) Inlet Cleaning Removal of Catch Basin Grease and Oil Separator- Anysize (pipe diameter sizes range from 18" to 42") Removal of Steel Reinforcing Bars (Torch or CuI) Furnish and Install Catch Basin Grease And Oil Separator (Installation a1 Engineer's discretion) All Sizes (Diameter size ranges from 18" to 421 M) 1 54d04' 4o'-1frLd 5`� tzN t-�v Qsz. — 1 `� Fraay Sawrday Sunday '527 2i(051 !SPECTOR: dam `\' `^ SIGNATURE 1 DATE: z3 a3 52 • STORM DRAIN CLEANING WEEKLY REPORT NTRACTOR 3JECT NO: `Y ITEM NO 110.2.1A ldre •CI 110.2.413 Ir dir SI 110-2.3A 0 SI 110-2.3B T 15 110-2.3C T 110.2.30 110-2A 110-3-4 110-3-5 425-1-70 COMMENTS: I . SPECTOR: WORK ORDER NO: 9 .4> /24,/03 1)6/ i/O3 32 5Z FROM TO SECT TOWN RANGE toning ench — han Diameter) i]ia nlet Fumish Waonesda Thrsda Friday Salurday Sunday TOTAL DESCRIPTION Monday Taalday DATE 2 a5 2— '5 4b O, 1 O 0 of concrete slab covered nch (Catch Basin plus 10' in each action - any width) I I eaning of concrete slab covered (Catch Basin plus 10' in one ection • any width) orm Culvert Cleaning - (18 Inched • Less - Inside Diameter) 11� 13 (G L f ' j } orm Culvert Cleaning •- (Greater 18 Inches To 30 Inches • Inside 1 J iorm Culvert Cleaning - (Greater Ian 30 Inches To 42 Inches - Inside meter) ) 5 ^A } rr V Z form Culvert Cleaning - (Greater han 42 Inches - Inside Diameter) A. ,,, 1� .) • . . • Cleaning . • 111 • 3 4 f . ) 4 q,-.... lemoval of Catch Basin Grease and )it Separator - Anysize (pipe diameter izes range from 18" to 42") , • lemoval of Steel Reinforcing Bars Torch or Cul) ' , _ and Install Catch Basin Grease Ind Oil Separator (Installation at Engineers discrelion) Ail Sizes ru.male.. eiva r�nnse rrrnrtn 1R" In 421 • l - I ' V- -1;2/1-› (-It) Z.,16 t • SIGNATURE f DATE: 53 ' Project Number: 629528 mars y Est : 23 TOWN RANGE SECTION $$3 41 17 Work Order: 9 • Work Period From To S 5/2003 5/812003 WORK ORDER WORK PERFORMED - _----- PAY ITEM NO BUDGET DESCRIPTION CODE ACTIVITY UNIT UNIT PRICE PREVIOUS REQUISITION CURRENT REQUISITION OUANTITY CURRENTTOTAL REQUISITION AMOUNT AMOUNT TO DATE 110.2-1 A trench Cleaning of concrete slab covered (Catch Basin plus 10' in each Pipe Cleaning direction - any width) LF 4.05 50.00 0 50.00 $0.00 1 110-2-15 Clearing of concrete slab covered trench (Catch Basin plus 10' in one Pipe Cleaning dkecllon - any width) LF • 4.05 $0.00 0 $0,00 50.00 110-2-3A Storm Culvert Cleaning - (18 Inches Pipe Cleaning Or Less - Inside Diameter) LF 3.45 50.00 585 $2.018.25 52,018.25 110.2-38 Storm Culvert Cleaning - (Greater Than 18 Inches To 30 Inches • Inside Pipe Cleaning Diameter) LF 3.49 50.00 367 $1,280.83 $1,280.83 110.2-3C • Storm Culvert Cleaning - (Greater Than 30 Inches To 42 inches - Inside Pipe Cleaning Diameter) LF 3:56 50.00 747 ' $2:659.32 $2,659.32 110-2-30 ' Storrs Culvert Cleaning - (Greater Pipe Cleaning Than 42 Inches - Inside Diameter) LF 3.80 $0.00 0 50.00 50.00 110-2A Inlet Cleaning Inlet Cleardnp EA 6.85 50.00 24 $164.40 $164.40 • 110-3-4 Removal of Catch Basin Grease and 01 Separator - Anysixe (pipe diameter inlet Cleaning wee range from 18' to 42') PER 1 SEPAR 5.00 50.00 ' . 0 50.00 50.00 110-3-5 Removal of Steel Reinforcing Bars Inlet Cleaning ng (Torch or Cut) PER 1 INLET 65.E $0.00 0 50.00 50.00 425-1-70 Furnish and Instal Catch Basin Grease And Separator (Installation at Engineer's discretion) Al Sires (Diameter slze ranges from 18- to 47) Inlet Cleaning PER 1 SEPAR _ 500.00 50.00 0 $0.00 $0.00 TOTALS 50.00 se.122.e0 r $6,122.80 I mi STORM DRAIN CLEANING WEEKLY REPORT TIQN ti , 1 RACTOR: • env! 2i A.J. ,z.:2 5_,A) ECT NO: WORK ORDER NO: 7 SECT TOWN RANGE TE ITEM NO DESCRIPTION T,gaa W q- s gig - tity. TOTAL DATE t i0.2.1A Cleaning at concrete slab covered trench (Catch Basin plus 10' in each direction - any width) J _ Cleaning 10.2.1 B . of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) . • r iO.2-3A Storm Culvert Cleaning -(18 Inches Or less - Inside Diameter) ��� �)j,3' J ion 1 I,� l �� 1 f0.2.38 Storm Culvert Cleaning '• (Greater Than to Inches To 30 Inches •inside Diameter 3,5 7' - f b 1 I A ' .- _ i .c ' (�.� 10-2-3C Storrs Culvert Cleaning - (Greater Than 30 Inches To 42 Inches • Inside Diameter) • 10-2•3D Storm Culvert Cleaning - (Greater• Than 42 Inches - Inside Diameter) 110.2A Inlet Cleaning 3 17/ , i G1.-� 1104-4 Removal of Catch Basin Grease and Oil Separator • Anysize (pipe diameter sizes range from 18" to 421 j • 110.3.5 Removal of Steel Reinlorcing Bars ' (Torch or Cut) . l25•1•70 Furnish and Install Catch Basin Grease And Oil Separator (Installation at Engineer's discretion) All SizeS (Diameter size ranges from 18"•to 471 T - • )MMENTS: PECTOR: SIGNATURE 1 DAT 55 STORM DRAIN CLEANING WEEKLY REPORT p7101�'%/ JTRACTOR: b—1' V r i2 oW A s7 62952� ).1ECT NO: OM TO WORK ORDER NO: /7 1 SECT TOWN RANGE ►-- Y ITEM NO DESCRIPTION DATE M y Twsdq w.a stlay TAn eay FrW y Saturday Sunday TOTAL !'� 6 6 /' . 7 D 0 25i OS 3� 110.$•1A Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction - any width) 110-2.18 Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) 0 5. 110.2.3A Storm Culvert Cleaning - (18 Inches Or Less - Inside Diameter) •r I,A 77 / r' 7 •`r ; 110.2-38 Storm Culvert Cleaning '- (Greater Than 16 Inches To 30 Inches - Inside Diameter) I r 110-2-3C Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) • �/ -•7 1 I y 7 7 1-1 r. 7 Storm Culvert Cleaning - (Greater• Than 42 inches - Inside Diameter) • 1 t0 2.3D 110-2A . Inlet Cleaning • ' j T 110-3-4 Removal of Catch Basin Grease and Oil Separator - Anysize (pipe diameter sizes range from 18" to 42") p gi Id • 110-3-5 Removal of Steel Reinforcing Bars - (Torch or Cut) 425-1.70 Furnish and Install Catch Basin Grease And Oft Separator (Installation at Engineer's discretion) All Sizes (Diameter size ranges from 18-to 42") , • :OMMENTS: SPECTOR: 3Wks- 2 F. SIGNATURE (DATE. 56 Project Nurgber: 629528 monthly Est.: 23 TOWN RANGE SECTION 52 40 25 Work Order: 9 Work Period F rom To 5/5/2003 61612003 WORK ORDER WORK PERFORMED ' PAY ITEM NO DESCRIPTION BUDGET CODE ACTIVITY UNIT UNIT PRICE PREVIOUS REQUISITION CURRENT REOUIStT1ON QUANTITY r CURRENT REQUISITION AMOUNT TOTAL AMOUNT TO DATE 110-2.1A • Cleaning of concrete slat covered trench (Catch Bash plus 10' in each direction - any width) Pipe Cleaning LF 4.05 S0.00 0 50.00 50.00 110•2-18 Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) Pipe Cleaning LF 4.05 50.00 0 50.00 50.00 110-2-3A Storm Culvert Cleaning • (18 inches Or Lau • Inside Diameter)LF pipeClea 3.45 ', $0.00 0 50.00 50.00 110-2.3B Storm Culvert Cleaning • (Greater Then 16 Inches To 30 Inches • Inside Diameter) Pipe Cleaning LF 3.49 50.00 0 50.00 10.00 110-2-3C • Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) Pipe Cleaning LF • 3.56 50.00 0 50.00 . $0.00 • 110.2-3D Storm Cullen Cleaning - (Greeter Than 42 Inches - Inside Diameter) Pt Cleo LF 3.80 50.00 488 51,854.40 51.854.40 110-2A Inlet Cleaning Inlet Cleaning EA 6.85 S0.00 3 520.55 520.55 110-3-4 Removal of Catch Basin Grease and 01 Separator • Anyslte .(pipe diameter sizes range from 18' to 4r) - inlet Cleaning SEPAR ' 5.00 50,00 0 $0.00 50.00 110-3-5 'Removal of Steel Reinforcing Bars (To ch or Cut) • Inlet Cleaning PER / INLET 65.00 50.00 0 50.00 50.00 425-1-70 Furnish and Install Catch Basin Grease And OA Separator (InsWtletbn at Engineers discretion) Alt Sizes (Diameter size ranges from 18' to 42') Inlet Cleaning PER / SEPAR , 500.00 50.00 0 $0.00 $0,00 $1.874.95 TOTALS s0.o0 i $1.874.95 Public Works Department Storm Drain Cleaning Project Project# 629528 INVOICE #23 Work Period 05/05/2003 to 6/08/2003 Work Order No. 8 Envirowaste Services Group, Inc. DIRECT INQUIRES TO: B. Rafael Barba, P.G., President Envirowaste Services Group, Inc. 5931 SW 88 Street Miami, Florida 33156 (305) 740-6315 . PLEASE SEND PAYMENT TO: Envirowaste Services Group, Inc. 5931 SW 88 Street Miami, Florida 33156 FAX (305) 740-6316 DATE: July 15, 2003 PLEASE BILL TO: Miami Dade County Public Works C/O; Consui-Tech Engineering, Inc. 10570 NW 27th Street, Suite 101 Miami, FI.33172 ATTENTION: Mr. Carlos Mailol, P.E. FOR SERVICES PROVIDED FROM: 05/05/2003 TO 6/08/2003 INVOICE DESCRIPTION: Services towards the cleaning of storm drains. Contract #: 629528 Finance Number. Inlet Cleaning — HIC830981.IPW099.99114 Pipe Cleaning — HiA810981.IPW043.99114 TOTAL AMOUNT OF CONTRACT: $1,750,000.00 TOTAL WORK ORDER AMOUNT: $ 87,158.00 AMOUNT BILLED TO DATE: $ 83,979.30 AMOUNT THIS INVOICE: $ 234.50 LESS I. G. FEE: $ 0.69 LESS 10% RETAINER: $ 23.45 AMOUNT THIS INVOICE: $ 210.46 We hereby certify that charges included herein are proper charges and correct summations from our records. Eduardo J. Barba. Vice President Envirowaste Services Group, Inc. 58 FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) STORM DRAIN CLEANING ESTIMATE OF CONSTRUCTION IAMI-DADS COUNTY PROJECT REOUIZITION AND PAYMENT CERTIFICATE •oject: Storm Drain Cleaning Project Contract No. 7 Project No. 629528 PUBLIC WORKS DEPARTMENT 'cation: Zone No. 2 Work Order No. 8 his requisition is submitted for work performed From: 5/5/2003 To: 6/8/2003 FUNDING CODES: Inlet Cleaning: HIF860981.I PW049.99114 Pipe Cleaning: H1F860981.1 P W042.99114 Requisition No. 23 Date: 6/19/2003 CONTRACT AMOUNT: TOTAL WORK ORDER AMOUNT TO DATE (8): TOTAL CONTRACTOR'S WORK TO DATE: LESS 10%RETAINED: SUBTOTAL ITEM No. 999-2 - ACCUMULATED INSPECTOR GENERAL COST TO DATE AMOUNT DUE TO DATE: LESS PREVIOUS PAYMENTS: , • AMOUNT DUE TO CONTRACTOR THIS REQUISITION (WO #8): APPROVED $2,012,500.00 $87,158.00 $83,979.30 $8,397,93 $75,581.37 $209.95 $75,371.42 $75,160.96 ENVIROWASTE SERVICES GROUP, INC. $210.46 CONTRACTOR BY DATE TITLE APPROVED Project Administrator Date Accounting Section - PW Dept Date Chief of Construction Division Date Pedro Cueto (Project Engineer) Date Director Date Project Diary: WA y ka9111INGENCY.01 RRtai4 59 Internal Auditing Date FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) STORM DRAIN CLEANING ESTIMATE OF CONSTRUCTION hIY EsL: 23 rector, Envirowaste Services Group rice Number. Inlet Cleaning - HIC830981.IPW099.99114 ,Y ITEM NO r�- 110.2-1A DESCRIPTION BUDGET CODE ACTIVITY Cleaning of concrete slab covered trench (Catch Basin plus 10' in each direction • any width) Pipe Clearing • 1t0.2.1B Cleaning of concrete slab covered trench (Catch Basin give 10 in one direction - any width) Pipe Cleaning UNIT LF LF 1 t0-2-3A Storm CUvsrt Cleaning - (18 Inches Or Less • Inside Diameter) Pipe Cleaning LF WORK ORDER UNIT PRICE 4.05 4.05 3.46 110-2-3B Storm Culvert Cleaning - (Greater Than 16 Inches To 30 Inches - Inside Diameter) - Pipe Cleaning 110.2.3C Storm CuOren Cleaning • (Greater Than 30 India To 42 Inches - Inside Diameter) Pipe Cleaning LF 110-2-3D Storm Coven Cleaning - (Granter Than 42 inches - Inside Diameter) Pipe Cleaning 110-2A mist Cleaning Inlet Gleam g LF LF EA 3.49 3.56 3.80 6.85 WORK ORDER QUANTITY 110.3.4 Removal of Catch Basin Gieaae and OR Separator - Anyslze (P1Pa diameter sizes range from 1 r to 42') INC Cleaning PERT SEPAR 110-3-5 Removal of Steel Reinforcing Bars (Torch or Cut) Inlet Cleaning 425.1.70 rOTALS Furnish and install Catch Basin Grease Arid Oil Separator (Installation at Engineer's dscretion) All Sixes (Diameter size ranges from 18' to 421 Inlet Cleaning PER 1 INLET PERT SEPAR 5.00 65.00 500.00 2,500 2,230 3.200 2,400 2,300 2.500 350 WORK ORDER AMOUNT 510,125.00 $9,031.60 511.040.00 $8.378.00 $8.188.00 39,500.00 Project Number 629528 Work Order. 8 Work Period PREVIOUS REQUISITION $1,495.50 51,053.00 546,343.85 $2,626.90 50.00 $0.00 52.397.50 52,212.55 From 5/5/2003 1 6/812003 To WORK PERFORMED CURRENT REQUISITION QUANTITY 0 0 64 0 0 0 2 1 CURRENT REQUISITION AMOUNT $0.00 $0.00 $220.80 50.00 30.00 $0.00 $13.70 TOTAL AMOUNT TO DATE 51,496.50 51,053.00 546,564.65 52,828.90 30.00 50.00 32,225.25 50.00 50.00 50.00 5250.00 $3.250.00 5290.00 5520.00 525,000.00 529,000.00 67.158.00 583,744.80 0 0 0 Less 10% Retainer $0.00 $0.00 $0.00 $234.60 $23.46 $290.00 $520.00 $29,000.00 583.979.30 58,397.93 Subtotal 5211.05 575.581.3T Leas Inspector General Fee $0.59 3209.95 Total invoice Amount $210.46 3T5,371.42 $83,744.80 58,374.4E 575,370.32 $209.36 578,160.96 Project Number: 629528 PAY ITEM NO 110-2.1A 110.2-18 110-2-3A 110438 DESCRIPTION Claming of concrete slab covered trench (Catch Basin plus 10in each direction - any width) Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction - any width) Storm Culvert Cleaning • (16 Inches Or Less - Inside Diameter) Storm Culvert Cleaning - (Greater Than 18 inches To 30 Inches • inside Diameter) Storm Culvert Cleaning • (Greeter Than 30 Inches To 42 Inches • Inside Diameter) Storm Culvert Cleaning - (Greater Than 42 Inches - Inside Diameter) Intel Cleaning Removal of Catch Basin Grease and ON Separator • Anysize (pipe diameter sizes range from 18' to 421 Removal of Steel Reinforcing Bars (Torch or Out) TOWN RANGE SECTION 56 39 9 BUDGET CODE ACTIVITY Pipe Cleaning Pipe Ciesning Pipe Cleaning Pipe Cleaning . • Pipe Cleaning Pipe Cleaning Inlet Cleaning Inlet Cleaning Inlet Cleaning Work Order: 8 Work Period From Td 5/5/2003 6/8/2003 WORK ORDER UNIT LF LF LF 15 LF LF EA PER / SEPAR PER! INLET Furnish and Install Catch Basin Grease And ON Separator (Installation at PER Inlet Cleaning Engineer's discretion) Al Sizes SEPAR (Diameter size ranges from 18' to 42') UNIT PRICE WORK PERFORMED CURRENT CURRENT PREVIOUS TOTAL. AMOUNT REOUISITION REQUISITION REQUISITION TO DATE AM QUANTITY OUNT 4.05 50.00 4.05 1 3.45 3.49 3.58 .• 3.80 50.00 50.00 0 0 84 $0.00 30.00 3220.80 50.00 50.00 3220.80 50.00 30.00 0 0 50.00 50.00 50.00 .50.00 50.00 6.85 50.00 5.00 65.00 600.00 60 50.00 0 2 0 $0.00 513.70 50.00 .50.00 513.70 30.00 10.00 50.00 0 0 30.00 SAX 50.00 f5234.60 50.00 50.00 3234.50 CTOR: CT NO: V ITEM NO 1:10.2.1A 10.2.18 10.2.3A • 10•2.38 I0•2•3C I0-2.3D 10-2A &A?Uide) GJ,4 sr ‘29 2{ DESCRIPTION Cleaning of concrete slab covered Trench (Catch Basin plus 10' in each direction . any width) Cleaning of concrete slab covered trench (Catch Basin plus 10' in one direction. any width) Storm Culvert Cleaning - (18 Inches Or Less .• Inside Diameter) • - Storm Culvert Cleaning •- (Greater Than 18 Inches To 30 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 30 Inches To 42 Inches - Inside Diameter) Storm Culvert Cleaning - (Greater Than 42 Inches . Inside Diameter) Inlet Cleaning Removal of Catch Basin Grease and Oil Separator. Anysize (pipe diameter sites range from 18" to 42") 0-3-5 Removal of Steel Reinforcing Bars (Torch or Cut) Furnish and Install Catch Basin Grease .1.70 And Oil Separator (Installation at . Engineers discretion) AU Sizes Diameter size ran, es from 18' to 42 i3 ILNTS: n 111 ti C- STORM DRAIN CLEANING WEEKLY REPORT • DATE FROM TO Z r WORK ORDER NO: O SECT TOWN RANGE • TOTAL SIGNATURE r0 6.1