Loading...
HomeMy WebLinkAboutexhibit 2- annual point calc. sheet6eIti e Points Flagstone island Gardens, LLC ANNUAL POINT CALCULATION SHEET 3/25/2004 r s Phase Total Joint Solicit Train Offer Continued Employment construction openings = att other assumptions = 100% 10% 50% 95% 95% 95% 75% 95% Construction New Jobs 1 0 0 0 Jobs Continuing from Previous Yr' : 0 Operations Hires or Retains New Jobs = 0 0 0 Jobs Continuing from Previous Yr " 0 Total 0 0 0 0 0 PERFORMANCE CALCULATIONS YEAR 1 OPERATIONS NUMBER OF QI's Trained QI's Hired or Retained QI's Continuing Employment Subtotal ADDED POINTS Soliciting Job Openings Solicited Personal Job Interviews Held Trade Fair Days Held TV Ads Produced Other Ads Produced Training Training Programs Set -Lip Hiring Employed QI's Retrained Promotion Steps ($500) Made Subtotal Added Points POINTS EACH 100 125 125 1 5 1st YEAR REQUIRED 1st YEAR ACTUAL Activities 0 0 0 0 0 10 0 5 0 5 0 10 50 50 0 0 0 Points Activities 0 0 ;` 0 0 0 0 0 0 o 0 ' The Total Jobs shalt be multiplied by the fixed percentages provided above. Total Jobs each reporting period shall be based upon actual jobs created and reported in arrears. Total Jobs is the cumulative total of all jobs created at the Project including, but not limited to, all positions vacated involuntarily end positions vacated due to resignations. 2 75% is the total of Training & Hiring activates based on stated assumptions above and is considered minimum performance. Below an annual performance of 75% requires corrective action. Based upon monthly reporting results if prevailing economic conditions warrant, minimum may be lowered with City Manager's concurrence. 4 95% is target performance. Percentage points over 95% can be accumulated and applied to future years. By way of example, if Flagstone's Total Performance in year 1 is 100% and in year 2 is 70%, the accumulated 5% in year 1 can be applied to year 2 for a performance level of 75% in year 2, thereby not requiring corrective action. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Performance Model Phase Total Annual Jobs Minimum_% of Total Jobs to be: Trained Solicited Offered Construction % of Job Openings on -site Operations % of Job Openings on -site 0 0 10% 0 25% 0 10% 0 25% = 0 10% 0 25% - 0 DESCRIPTION OF OPERATION POINTS EACH N . OF EVENTS TARGETED POINTS TARGETED �w :: v 0 ° S A', Soliciting f 1".'"". Job Openings Solicited 1 0 , O. 'I :H Job Interviews Held 5 0 0 4 Trade Fairs Held 10 0 0; 'Ifs a 6 -, TV Ads Made 5 0 0 ,- Other Ads Made 10 0 0``ram t•' �',� Training �" QI's Trained 100 0 0 ` 5,,i4 . Training Programs Set-up 10 0 0 s . , �� Y' t rhF Ri s�'," 4 Hiring :9 QI's Hired or Retained 100 0 0 �,� ; , Employed QI's Retrained 50 50 2,500 �v.r'� k��..41 Promotion Steps ($500) Made 50 ;, 0 .. r��v.4`r �0 ,,. - TOTAL 2,500 0 PERFORMANCE PERCENTAGE 0.00% PERFORMANCE GRADE GOOD ACCEPTABLE 100% 90% 85% 80%