Loading...
HomeMy WebLinkAboutR-04-0339City of Miami Legislation Resolution: R-04-0339 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 04-00500 Final Action Date: 5/27/2004 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER'S ENGAGEMENT OF METRIC ENGINEERING, INC. ("ENGINEER"), SELECTED FROM THE LIST OF PRE -APPROVED GENERAL ENGINEERING FIRMS, APPROVED BY RESOLUTION NO. 02-144, ADOPTED FEBRUARY 14, 2002, FOR THE DESIGN DEVELOPMENT, PREPARATION OF BID AND CONSTRUCTION DOCUMENTS, AND PERMIT AND CONSTRUCTION ADMINISTRATION SERVICES RELATED TO THE "BISCAYNE BOULEVARD CROSS STREETS TWO-WAY CONVERSION (9TH STREET, 10TH STREET, 11TH STREET) PROJECT, JOB NUMBER B-33100," IN AN AMOUNT NOT TO EXCEED $136,609, BASED ON: (1) THE SCOPE OF SERVICES AND SCHEDULE REQUIRED FOR THE PROJECT AND (2) THE TERMS AND CONDITIONS SET FORTH IN THE AGREEMENT WITH THE ENGINEER EXECUTED PURSUANT TO RESOLUTION NO. 02-144; AUTHORIZING THE CITY MANAGER TO EXECUTE THE WORK ORDER AUTHORIZATION, IN SUBSTANTIALLY THE ATTACHED FORM; ALLOCATING FUNDS, IN AN AMOUNT NOT TO EXCEED $136,609, FOR SAID PROJECT, FROM CAPITAL IMPROVEMENT PROJECT NO. 341330 ENTITLED "CITYWIDE TRANSPORTATION AND TRANSIT." WHEREAS, the City of Miami ("City") is the owner of the right-of-way located at 9th Street between Biscayne Boulevard and Northeast 2nd Avenue, 10th Street between Biscayne Boulevard and Northwest 3rd Avenue, and 11th Street between Biscayne Boulevard and Northeast 2nd Avenue, Miami, Florida; and WHEREAS, the City desires to convert each of the above right-of-way segments from one-way vehicular traffic flow, to two-way vehicular traffic flow ("Project"), which requires capital improvements and modifications that must be designed by a qualified professional engineer; and WHEREAS, Metric Engineering, Inc. ("Metric Engineering") is a pre -approved general engineering firm under Resolution No. 02-144, adopted February 14, 2002, to provide design development, preparation of bid and construction documents, and permit and construction administration services to the City on an as -needed basis, and subsequently entered into an agreement with the City dated May 13, 2002 for that purpose; and WHEREAS, as a result of the foregoing, Metric Engineering has submitted a proposal to provide specified engineering services for the Project included in the attached Work Order, which is based on (1) the scope of services and schedule required for the Project, set forth in the Work Order Authorization, attached and incorporated, and (2) terms and conditions set forth in the Agreement with Metric Engineering, Inc., executed pursuant to Resolution No. 02-144; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: City of Miami Page 1 of 2 File Id: 04-00500 (Version: 1) Printed On: 9/15/2016 File Number: 04-00500 Enactment Number: R-04-0339 Section 1. The recitals and findings found in the preamble of this resolution are adopted by reference and incorporated as if fully set forth in this section. Section 2. The City Manager's engagement of Metric Engineering, selected from the list of pre -approved general engineering firms, approved by Resolution No. 02-144, adopted February 14, 2002, is authorized for the design development, preparation of bid and permit and construction administration documents, related to the "Biscayne Boulevard Cross Streets Two -Way Conversion (9th Street, 10th Street, 11th Street), Project B-33100," ("Project"), in an amount not to exceed $136,609, based on: (1) the scope of services and schedule required for the Project, and (2) the terms and conditions set forth in the agreement executed with the Engineer pursuant to Resolution No. 02-144, with funds, in an amount not to exceed $136,609, allocated from Capital Improvements Project No. 341330 entitled "Citywide Transportation and Transit." Section 3. The City Manager is authorized{1} to execute the Work Order Authorization, in substantially the attached form, for said Project. Section 4. This resolution shall become effective immediately upon its adoption and signature of the Mayor.{2} Footnotes: {1} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File Id: 04-00500 (Version: 1) Printed On: 9/15/2016