Task 1: Construction Documents
474
Project Manager
Professional Engineer
Engineer
CADD Technician
L
Clerical
100
183
235
'248
24
$120.00
$100.00
$85.00
$60.00
$40.00
•
Tilted Fee
$12,000.00
$18,300.00
$19,975.00
$14,880.00
$ 960.00
06010100.
Consulting Fees by Sub -Consultants based on total Scope of Work and Professional Services.
M.G. VERA & Associates
GEOSOL, Inc.
EDM, Inc.
Discipline :
SURVEYING
GEOTECHNICAL
UTILITY
$19,313.26
$5,181.00
LOCATES y$9,080.00
TT33
t Exhibit A
. 1.
PROPOSAL
Two Way Conversions (9th Street, 10th Street, 11th Street) Project
Task 2: Condneencv Amount*
Metric Engineering, Inc
• .0a 1...1k.
TOW
$15,000.00
• q.124-.3r,"-•:: •
V:./D-000•00
* To be used at the direction of the City
Task 3: Post-Construcdon Services
1.q. •
-,z41: • •
Project Manager
Professional Engineer
Engineer
CADD Technician
Clerical
5.
6.
27
27
172
8
22
$120.00
$100.00
$85.00
$60.00
$40.00
ringi-U0 — Not tik
$ 3,240.00
$ 2,700.00
$14,620.00
$ 480.00
$ 880.00
Exhibit A
PROPOSAL
Two Way Conversions (9th Street, 10th Street,11th Street) Project
"Attachment B"
Fee Schedule per Task/Phase included in the Scope of Services
Phase
TASK 1: SURVEY ( M.G. Vera & Associates, Inc. )
TASK 1: GEOTECHNICAL TESTING (GEOSOL,)
TASK 1: PHASE I: PRELIMINARY DESIGN SUBMITTAL
(Mew)
TASK 1: UTILITY LOCATES (EDM, Inc.)
TASK 1: PHASE H: FINAL DESIGN SUBMITTAL (Metric)
TASK 1: PHASE III: SIGNED & SEALED SVBMTTAL
(Metric)
TASK 1: PHASE IV: BID ASSISTANCE (Metric)
TASK 2: CONTINGENCY
TASK 3: CONSTRUCTION PHASE
SUBTOTAL:
TOTAL AMOUNT
3
Total Amount
$19,313.26
$5,181.00
$ 26,446.00
$9,080.00
$33,057.50
$ 3,305.75
$ 3,305.75
$99,689.26
$ 15,000.00
$ 21,920.00
$136,609.26
Exhibit A
PROPOSAL
Two Way Conversions (9th Street, 10th Street, 11th Street) Project
"Attachment C"
Protect Desist & Permian Schedule(*)
ID 9
Task Name and/or Activity Description
Duration
Start
Date
Finish
, Date
(WBEKs)
01
SURVEY.
6
5/3/04
6/11/04
02
GEOTECHNICAL.
2
5/3/04
5/14/04
UTILITY COORDINATION
4
5/3/04
5/28A04
r
r
PRELIMINARY DESIGN
6
5/3104
6/11/04
05
CITY'S PRELIMINARY DESIGN REVIEW
2
6/14/04
6/25/04
06
1
5/31/04
6/4/04
UTILITY LOCATES
07
FINAL DESIGN
6
6128d04
8/6/04
08
CITY'S FINAL REVIEW
1
8/9/04
8/13/04
09
REVISE PER CITY COMMENTS
2
8/16J04
8/2']/D4
_
10
BID ASSISTANCE
8
8/30/04
10/22/04
11
15
(*) The above schedule assumes that a written Notice to Proceed ill be received h�om the
w
City by MAY 3, 2004 and review period by the City and the regulatory agencies will not
exceed the duration allocated in this schedule.