Loading...
HomeMy WebLinkAboutexhibit 5- proposal 2PROPOSAL Two Way Conversions (9th Street, 10th Street,11m Street) Project "Attachment A" -- Breakdown of work effort by Metric Engineering, Inc. based on the estimated hours worked by individuals in the following categories to accomplish the tasks included in the Scope of Services: Task 1: Construction Documents 474 Project Manager Professional Engineer Engineer CADD Technician L Clerical 100 183 235 '248 24 $120.00 $100.00 $85.00 $60.00 $40.00 • Tilted Fee $12,000.00 $18,300.00 $19,975.00 $14,880.00 $ 960.00 06010100. Consulting Fees by Sub -Consultants based on total Scope of Work and Professional Services. M.G. VERA & Associates GEOSOL, Inc. EDM, Inc. Discipline : SURVEYING GEOTECHNICAL UTILITY $19,313.26 $5,181.00 LOCATES y$9,080.00 TT33 t Exhibit A . 1. PROPOSAL Two Way Conversions (9th Street, 10th Street, 11th Street) Project Task 2: Condneencv Amount* Metric Engineering, Inc • .0a 1...1k. TOW $15,000.00 • q.124-.3r,"-•:: • V:./D-000•00 * To be used at the direction of the City Task 3: Post-Construcdon Services 1.q. • -,z41: • • Project Manager Professional Engineer Engineer CADD Technician Clerical 5. 6. 27 27 172 8 22 $120.00 $100.00 $85.00 $60.00 $40.00 ringi-U0 — Not tik $ 3,240.00 $ 2,700.00 $14,620.00 $ 480.00 $ 880.00 Exhibit A PROPOSAL Two Way Conversions (9th Street, 10th Street,11th Street) Project "Attachment B" Fee Schedule per Task/Phase included in the Scope of Services Phase TASK 1: SURVEY ( M.G. Vera & Associates, Inc. ) TASK 1: GEOTECHNICAL TESTING (GEOSOL,) TASK 1: PHASE I: PRELIMINARY DESIGN SUBMITTAL (Mew) TASK 1: UTILITY LOCATES (EDM, Inc.) TASK 1: PHASE H: FINAL DESIGN SUBMITTAL (Metric) TASK 1: PHASE III: SIGNED & SEALED SVBMTTAL (Metric) TASK 1: PHASE IV: BID ASSISTANCE (Metric) TASK 2: CONTINGENCY TASK 3: CONSTRUCTION PHASE SUBTOTAL: TOTAL AMOUNT 3 Total Amount $19,313.26 $5,181.00 $ 26,446.00 $9,080.00 $33,057.50 $ 3,305.75 $ 3,305.75 $99,689.26 $ 15,000.00 $ 21,920.00 $136,609.26 Exhibit A PROPOSAL Two Way Conversions (9th Street, 10th Street, 11th Street) Project "Attachment C" Protect Desist & Permian Schedule(*) ID 9 Task Name and/or Activity Description Duration Start Date Finish , Date (WBEKs) 01 SURVEY. 6 5/3/04 6/11/04 02 GEOTECHNICAL. 2 5/3/04 5/14/04 UTILITY COORDINATION 4 5/3/04 5/28A04 r r PRELIMINARY DESIGN 6 5/3104 6/11/04 05 CITY'S PRELIMINARY DESIGN REVIEW 2 6/14/04 6/25/04 06 1 5/31/04 6/4/04 UTILITY LOCATES 07 FINAL DESIGN 6 6128d04 8/6/04 08 CITY'S FINAL REVIEW 1 8/9/04 8/13/04 09 REVISE PER CITY COMMENTS 2 8/16J04 8/2']/D4 _ 10 BID ASSISTANCE 8 8/30/04 10/22/04 11 15 (*) The above schedule assumes that a written Notice to Proceed ill be received h�om the w City by MAY 3, 2004 and review period by the City and the regulatory agencies will not exceed the duration allocated in this schedule. 4 Exhibit A