HomeMy WebLinkAboutexhibit 1-work order authTau. rrf �iax�tY
JORGE C. CANO, P.E.
Director
April 30th, 2004
Mr. Jose B. Gonzalez, P.E., Vice -President
Metric Engineering Inc.
13940 S.W. 136th Street
Suite 200
Miami, Florida 33186
RE: WORK ORDER AUTHORIZATION
Biscayne Boulevard Cross Streets (9th Street, loth Street, llth Street), B-33100
Dear Mr. Gonzalez:
JOE ARRIOLA
City Manager
This work order is for the provision of engineering services for the two-way
conversion of N.E. 9th Street and N.E. 11th Street between Biscayne Boulevard and N.E. 2nd
Avenue and loth Street from Biscayne Boulevard to N.W. 3rd Avenue, pursuant to the
Professional Service Agreement for General Engineering Services, dated May 13, 2002,
between the City of Miami and Metric Engineering, Inc.
I. Scope of Services
The Scope of Services are detailed in Exhibit "A", the proposal of Metric Engineering,
Inc., dated 4/29/04, attached hereto and made part hereof. Programming and
Schematic Design services are not required under this work order.
II. Time of Performance
The Schedule for performance of the work is detailed in Exhibit "A", attached hereto
and made a part hereof.
III. Compensation
The work will be performed for a fee guaranteed not to exceed the sum of $136,609.00.
The City shall not be Liable for any cost, fee, or expenditure above set forth in this
section. The above quoted fee includes an allowance for reimbursable expenses that
comply with the requirements of the Agreement. Any eligible reimbursable expenses
shall conform to the limitations of §112.061, Fla. Stat.
IV. Sub- Consultants
Sub -consultants for performance of the work are:
Surveying: M.G. Vera & Associates
DEPARTMENT OF CAPITAL IMPROVEMENTS.
444 S.W. 2nd Avenue, 8th Floor / Miami, FL 33130 / (305) 416-1280 / Fax: (3051416-2153
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
Metric Engineering
Biscayne Boulevard Cross Streets
(9th Street, loth Street, llth Street), B-33100
Page 2 of 2
Geotechnical: GEOSOL, Inc.
Utility Locates: EDM Engineering Solutions, Inc.
Any changes to the Sub -consultants used for this work shall require prior written
approval from the Director or Project Manager, which approval shall not be
unreasonably withheld
V. Funding and Budget
The scope of services will be funded by CIP Number 341330, entitled "Citywide
Transportation and Transit".
VI. Budget
An estimated construction cost of $891,712.50 has been established for this project.
Additional expenses, including design, construction inspections, and project
administration bring the total budget of this project to $1,226,105.
VII. Attachments and Incorporated by Reference
The Work Order is deemed to incorporate by reference the terms and conditions of the
documents identified below. The undersigned will perform this work in compliance
with those documents.
1. Metric Engineering, Inc. proposal dated April 29th, 2004, Exhibit "A".
2. Professional Services Agreement between Metric Engineering, Inc. and The City
of Miami, dated May 13, 2002 the provision of engineering services.
3. City Commission Resolution No. 02-144.
AUTHORIZED BY:
ACCEPTED AND APPROVED BY:
Joe Arriola, City Manager . Date Robert Chisholm, Principal Date
City of Miami R.E. Chisholm Architects, Inc
Witness
CC�/
Date Witness Date
Metric Engineering
Biscayne Boulevard Cross Streets
(9th Street, 10th Street, llth Street), B-33100
Page 3 of 3
ACCEPTED BY TRANSPORTATION
AND CAPITAL IMPROVEMENTS:
"71440 Jorg ano, Deputy Director Date
Approved as to Form and Correctness: Approved as to Insurance Requirements:
Alejandro Vilarello, City Attorney Dania Carillo,
Risk Management Administrator
JCC/ JBO/