HomeMy WebLinkAboutexhibit 1-formal bidFORMAL . BID
BRYAN PARK RIGHT-OF-WAY IMPROVEMENTS
Project' Number: B-30303
Project Manager: FERNANDO PAIVA
Person who received the bids: PAIVA / BRYAN
Construction Estimate = $ 153,020.00
BIDDER
ADDRESS
BID BOND AMOUNT
IRREGULARITIES
MINORITY OWNED
ITEM No.
1
DESCRIPTION
BASE BID: ITEMS 1- 17
MOBILIZATION AND MAINTENANCE OF TRAFFIC
2
CLEARING AND GRUBBING
3
4
CONSTRUCT 155LF OF EXF1LTRA11ON TRENCH
r CONSTRUCT 7TYPE 'D"CATCH BASINS
5
CONSTRUCT 185 LF OF15IN. ALUMINUM PIPE
6
CONSTRUCT 450 LF OF 2 FT TYPE "F" CURB AND
7
a
GUTTER
CONSTRUCT 46 LF OF VALLEY GUTTER
RE -GRADE AND SLOPE ECSI1NG SWALE
9
10
11
CONSTRUCT 590 SY OF 1 IN. 'TYPE S-IU' ASPHALTIC
PAVEMENT WITH 8" L1MEROCK BASE AND 12"
TYPE w STABILIZATION
INSTALL 11,530SF OF ST. AUGUSTI ESOLID SOD
RELOCATE 2 EXISTING TRH
12
CORE DRILL t DRAINAGE STRUCTURE AND
CONNECT TO PROPOSED 15' GAP PIPE
DEVELOPMENT & COMM.
GROUP OF FLORIDA. INC
9700 SW 104 ST.
MIAMI, FLORIDA 33176
S10.000.00BID BOND
F
YES
UNTf
PRICE
$17,50.00
S3,000.00
$70.00 / LF
$1,500.00 / EA
$40.00 / LF
$15.00 / LF
S18.00 / LF
$2,500.00
$20.00 I SY
$0.49 / SF
$600.00 / EA
• IItRHGU1.AR1Tl&S LEGEND
A - No P - of- Attorney
B - No Affidavit as to Capital It Surplus of Bonding Company
C - Ca r cted Exteroic tc Seal
D - Proposal Unsigned or Improperly Signed or no Corpora
E - Incomplete Extensions
F - Non • responsible bid
G - Improper Bid Bond
H - No Certificate of Cry Number
I - No Yard Source Hiring Compliance Statement
1 - No Minority Compliance
v _ ia. m...lieite laid Proposal
$850.00
TOTAL
S102,916.041
$17,500.09
$3,000.00
S10,850.00
$10,500.00
$7,400.00
$6,750.00
$828.00
$2,500.00
511,800.00
$5,649.70
$1,200.00
CIP Number 311714 and 341206
Date: 4 / 13 / 2004
Received at: CITY CLERICS OFFICE, MIAMI CITY HALL
Time: 10:00 a.m.
T. J. PAVEMENT
CORPORATION
11401 SW 40 ST., STE. 335
M1AM1, FLORIDA 33165
5% BID BOND
YES
UNIT
PRICE
$5,000.00
$5,000.00
S90.00 / LF
$1,800.00 / EA
$65.00 / LF
$22.00 / LF
$20.00 / LF
$10,000.00
$29.75 / SY
S0.95 / SF
S1,500.00 / EA
TOTAL
$125,676.00
$5,000.00
$5,000.00
$13,950.00
$12,600_00
$12,025.00
$9,900.00
S920.00
$10,000.00
$17,257.50
$10,953.50
$3,000.00
PETRO HYDRO, INC.
10450NW 31 TER.
MIAMI FLORIDA 33172
5% BID BOND
YES
UNIT
PRICE
S33,665.00
$4,930.00
5101.00 / LF
$2,233.00 / EA
842.00 / LF
$19.00/LF
515.00/LF
S1,100.00
$25.00 / SY
$1.80/SF
$800.00 / EA
TOTAL
S149,655.00
$33,665.00
$4,930.00
$15,655.00
$15,631.00
$7,770.00
S8,550.00
$690.00
$1,100.00
$14,750.00
S20,754.00
$1,600.00
S650.00
HORIZON CONTRACTORS,
INC.
8475 W 32 AVE.111
MIAML FLORIDA 33018
534 BID BOND
YES
UNIT
PRICE
S 10,000.00
$7,000.00
$68.00/LF
$2,300.00 / FA.
$64.00 / LF
$18.001 LF
$18.00 / LF
$8,000.00
S35.00 / SY
$250 / SF
S550.00 / EA
S600.00
TOTAL
S150,793.00 _
S10,000.00
$7,000.00
$10,540.00
$16,100.00
$11,840.00
S8,100.00
$828.00
$S,000.00
S20,650.00
$28,825.00
$1,100.00
$850.00 S750.00 S750.00 S650.00
1T HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE
LOWEST RESPONSIBLE AND RESPONSIVE BID
AMOUNTIS
OF . PAVEMENT CORRFORATION
FOR THE
S600.00
If the above contractor is not the lowest bidder explain:
Development & Communication Group of Florida failed to comply with the Casty of Miami M/WBE
Office 20% goal bidding requirement The firm is neither a certified Qty of Miami M/WBE orm,
nor did they date in good faith to reach out to certified Qty of Minna M/WBE firms to sub-
contract a minim= of 20' of the paving and/or drainage work. of Miami M/WBE firm
T J. Pavetnent Corporation, the second lowest bidder, is a Qty
SHEET 1 OF 4
FORMAL. BID
A -
B -
c-
D-
E
F -
G--
H -
I -
7--
K
BRYAN PARK RIGHT-OF-WAY IMPROVEMENTS
Project Number. B-30303
Project Manager: FERNANDO PAIVA
Person who received the bids: PAJVA / BRYAN
Construction Estimate = $ 153,020.00
BIDDER
ADDRESS
• BID BOND AMOUNT
IRREGULARITIES
MINORITY OWNED
DEVELOPMENT & COMM.
GROUP OF FLORIDA, INC:
9700 SW 104 ST.
MIAMI FLORIDA 33176
S10,000.00 BID BOND)
F
YES
CIP Number 311714 and 341206
Date: 4 / 13 / 2004
Received at: CITY CLERICS OFFICE. MIAMI crrY HALL
Time: 10:00 a.m.
T. J. PAVEMENT
CORPORATION
1I401 SW 40 STD S1E. 335
MIAMI, FLORIDA 33165
5'4 BID BOND
YES
PETRO HYDRO, INC. .
10450NW 31 TER.
MIA}III. FLORIDA 33172
5% BID BOND
YES
HORIZON CONTRACTORS,
INC.
3475 W 32 AVE, 101
ML4MI, FLORIDA 33018
5% BID BOND
C
YES
ITEM No.
13
14
15
16
17
A
B
D
G
DESCRIPTION
340 LF OF 4' WHITE PAINT STRIPE
40 LF OF 4' BLUE PAINT STRIPE
35SY OF 4" THICK QONc EIEPAVEMENT
REMOVE 55 SY OF 4'THICK CONCRETE PAVEENf
PROVISIONS FOR SPECIAL ITEMS
ADDITIVE rrEM5
MOBILIZATION AND MAINTENANCE OF TRAFFIC
MILL 2,300 SY OF 1' THICK ASPHALTIC CONCRETE
PAVEMENT, INCL. REMOVAL OF ExI5IINGPAVEME"NT
2,300 SY OF 1' NOMINAL ROADWAY RESURFACING
500 LE OF 6' YELLOW SOLID TRAFFIC STRIPING
CLEAN, REMOVAL AND DISPOSAL OF DEBRIS
FROM EXISTING STORM SEWERS
100 LF OF OVERclJTFORTS' CMP PIPE
1 TON OF CITY OF MIAMI TYPE 'A' CONCRETE
PLANT MD/FORTf TEMPORARY PATCHING
IRREGULARITDIS LEGEND
No Poser - of- Attorney
No Affidavit as to Capital & Surplus of
Corrodes F.:tumaas
Proposal Unsigned or Improperly Signedor
Incompelete
Non - rapausr'bfu bid
Improper Bid Bond
No Certificate of Competency Number
No First Source Hiring Compliance StMcm it
No biagrity Compliance
- No Deplicstc Bid Proposal
UNIT
PRICE
$132/LF
$1.00/LF
$30.00 / SY
$9.00/SY
$8,000.00
S8.00 / SY
$6.50 / SY
$18.00 / LF
$1,800.00
$2.00/LF
$80.00 / TON
Bonding Company
no Corporate Seal
s,.
41/2i/ae
TOTAL
$448.80
$40.00
$1,050.00
$49.50
$22,500.00
S8,000.00
$18,400.00
$14,950.00
S900.00
$1,800.00
$2,000.00
$80.00
UNrr
PRICE
$1.00/LF
$1.00 / LF
$36.90 / SY
$27.00 / SY
$5,000.00
$4.50 / SY
$11.70/SY
$1.10/LF
$5,000.00
S120.00/LF
S200.00 / TON
TOTAL
$340.00
$40.00
$1,291.50
$148.50
$22,500.00
$5,000.00
S 10,350.00
$26,910.00
S550.00
$5,000.00
$12,000.00
$200.00
UNIT
PRICE
$0.52 / LF
S0.50 / LF
$27.00 / SY
$50.00 / SY
$5,000.00
S3.50 / SY
$5.50 / SY
$0.75 / LF
$1,000.00
$30.00 / LF
$500.00 / TON
TOTAL
$170.00
$20.00
$945.00
S275.00
$22,500.00
$5,000.00
$8,050.00
$12,650_00
$375.00
$1,000.00
$3,000.00
$500.00
UNIT
PRICE
$1.50 / LF
$1.50 / LF
$90.00 / SY
$180.00/SY
$5,000.00
S3.50/SY
$7.00/SY
S1.50/LF
$3,500.00
$64.00/LF
$275.00 / TON
TOTAL
S510.00
$60.00
$3,150.00
$990.00
$22,500.00
S5,000.00
S8,050.00
$16,100.00
$750.00
S3,500.00
$6,400.00
S275.00
IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE
LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM 'LI-PAVEMENT CORPORATION
FOR THE TOTAL AMOUNT OF $125,676.00
If the above contractor is not the lowest bidder explain:
Development & Comnrimkatiasn Group of Florida faded to cowpfy with the City of Miaasi M/WBE
Office 20% goal bidding reqtdresnent. The firm b nester a certified City of Mind M/WBE firs,
nor did they demonstrate in good faith to reach out to certified City of Miami M/WBE firms to sub-
contract a -. mum of 20% of the paving and/or drainage work.
T.J. Pavement Corporation, the second lowest bidder, is a certified City of ]Miami M/WBE firm.
FORMAL BID
BRYAN PARK RIGHT--OF-WAY IMPROVEMENTS
Project Number. B-30303
Project Manager: FERNANDO PAIVA
Person who received the bids: PAIVA / BRYAN
Construction Estimate = . $ 153,020.00
BIDDER
ADDRESS
APAC - SOUTHEAST, INC.
7600NW 69AVE
MIAM I, FLORIDA 33166
CIP Number. 311714 and 341206
Date: 4 / 13 / 2004
Received at: CITY CLERK'S OFFICE, MIAM1 C1TY HALL
Time: 10: 00 a.m.
.1pD BOND AMOUNT
5%BID BOND
IRREGULARITIES
MINORITY OWNED
ITEM Na.
DESCRIPTION
❑Nrr
PRICE
NO
TOTAL
13
14
15
16
17
340 LF OF 4' WHITE PAINT SIRIIPE
40 LF OF 4" BLUE PAINT STRIPE
35 SY OF 4'nuac CONCRETE PAVEMENT'
REMOVE 5.5 SY OF 4' THICK CONCRETE PAVEMENT
PROVISIONS FOR SPECIAL MBE
$1.10/LF
$1.10/LF
$33.00 / SY
$126.00 / SY
S374.00
$44.00
$1,155.00
$693.00
$22,500.00
•
A
B
C
D
F
G
ADDITIVE ITEMS
MOBILIZATION AND MAI IIENANCE OF TRAFFIC
MILL 2,300 SY OF 1' THICK ASPHALTIC CONCRETE
PAVEMENT, INCL. REMOVAL OF EXISTING PAVEMENT
2,300SY OF 1' NOMINAL ROADWAY RESURFACING
500 LF OF 6' YELLOW SOLID TRAFFIC STRIPING
CLEAN, REMOVAL AND DISPOSAL OF DEBRIS
FROM EXISTING STORM SEWERS
100 LF OF OVERCUTT FOR 15' CMP PIPE
1 TON OF CITY OF}mon TYPE "A" CONCRETE
PLANT ME< FOR TEMPORARY PATCHING
* IRREGULARITIES IEGEN D
A — No Power - of- Mersey
B — No Affidavit as to Capital & Swphr of Boding Company
C — Corrected Extensions
13 — Proposal Unsigned or Improperly Signed
E — Incomplete Eiona
F — Non - ttapopiIlc bid 0'
G — Improper Bid Bond
H — No Certificate of Competency Number
I — No Fiat Source Ilhing Compliance Statement
I — No Nfmority Compliance
_c...._ n:A Prnnnesl
$1,000.00
$3.20 / SY
$4.80 / SY
$2.10/LF
$2,720.00
$60.00 / LF
$535.00 / TON
or no Corporate Seal
$1,000.00
$7,360.00
$11,040.00
$1,050.00
$2,720.00
•
$6,000.00
$535.00
IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE
LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM T.J. PAVEMENT CORPORATION
FOR THE TOTAL AMOUNT OF $125,676.00
If the above contractor is not the lowest bidder explain:
Development & Coanmwtication Group of Florida failed to comply midi the CSty of M11mi M/WBE
Office 20% goal bidding regairouent. The Berm is neither a certified City of Miami M/WBE Brea,
nor did they demonstrate in good faith to reach out to certified Clity of Miami M/WBE firms to sub-
contract a minimum of 20% of the paving and/or drainage work
T J. Pavement Corporation, the second lowest bidder, is a certified City of Miami M/WBE firm.