Loading...
HomeMy WebLinkAboutexhibit 1-formal bidFORMAL . BID BRYAN PARK RIGHT-OF-WAY IMPROVEMENTS Project' Number: B-30303 Project Manager: FERNANDO PAIVA Person who received the bids: PAIVA / BRYAN Construction Estimate = $ 153,020.00 BIDDER ADDRESS BID BOND AMOUNT IRREGULARITIES MINORITY OWNED ITEM No. 1 DESCRIPTION BASE BID: ITEMS 1- 17 MOBILIZATION AND MAINTENANCE OF TRAFFIC 2 CLEARING AND GRUBBING 3 4 CONSTRUCT 155LF OF EXF1LTRA11ON TRENCH r CONSTRUCT 7TYPE 'D"CATCH BASINS 5 CONSTRUCT 185 LF OF15IN. ALUMINUM PIPE 6 CONSTRUCT 450 LF OF 2 FT TYPE "F" CURB AND 7 a GUTTER CONSTRUCT 46 LF OF VALLEY GUTTER RE -GRADE AND SLOPE ECSI1NG SWALE 9 10 11 CONSTRUCT 590 SY OF 1 IN. 'TYPE S-IU' ASPHALTIC PAVEMENT WITH 8" L1MEROCK BASE AND 12" TYPE w STABILIZATION INSTALL 11,530SF OF ST. AUGUSTI ESOLID SOD RELOCATE 2 EXISTING TRH 12 CORE DRILL t DRAINAGE STRUCTURE AND CONNECT TO PROPOSED 15' GAP PIPE DEVELOPMENT & COMM. GROUP OF FLORIDA. INC 9700 SW 104 ST. MIAMI, FLORIDA 33176 S10.000.00BID BOND F YES UNTf PRICE $17,50.00 S3,000.00 $70.00 / LF $1,500.00 / EA $40.00 / LF $15.00 / LF S18.00 / LF $2,500.00 $20.00 I SY $0.49 / SF $600.00 / EA • IItRHGU1.AR1Tl&S LEGEND A - No P - of- Attorney B - No Affidavit as to Capital It Surplus of Bonding Company C - Ca r cted Exteroic tc Seal D - Proposal Unsigned or Improperly Signed or no Corpora E - Incomplete Extensions F - Non • responsible bid G - Improper Bid Bond H - No Certificate of Cry Number I - No Yard Source Hiring Compliance Statement 1 - No Minority Compliance v _ ia. m...lieite laid Proposal $850.00 TOTAL S102,916.041 $17,500.09 $3,000.00 S10,850.00 $10,500.00 $7,400.00 $6,750.00 $828.00 $2,500.00 511,800.00 $5,649.70 $1,200.00 CIP Number 311714 and 341206 Date: 4 / 13 / 2004 Received at: CITY CLERICS OFFICE, MIAMI CITY HALL Time: 10:00 a.m. T. J. PAVEMENT CORPORATION 11401 SW 40 ST., STE. 335 M1AM1, FLORIDA 33165 5% BID BOND YES UNIT PRICE $5,000.00 $5,000.00 S90.00 / LF $1,800.00 / EA $65.00 / LF $22.00 / LF $20.00 / LF $10,000.00 $29.75 / SY S0.95 / SF S1,500.00 / EA TOTAL $125,676.00 $5,000.00 $5,000.00 $13,950.00 $12,600_00 $12,025.00 $9,900.00 S920.00 $10,000.00 $17,257.50 $10,953.50 $3,000.00 PETRO HYDRO, INC. 10450NW 31 TER. MIAMI FLORIDA 33172 5% BID BOND YES UNIT PRICE S33,665.00 $4,930.00 5101.00 / LF $2,233.00 / EA 842.00 / LF $19.00/LF 515.00/LF S1,100.00 $25.00 / SY $1.80/SF $800.00 / EA TOTAL S149,655.00 $33,665.00 $4,930.00 $15,655.00 $15,631.00 $7,770.00 S8,550.00 $690.00 $1,100.00 $14,750.00 S20,754.00 $1,600.00 S650.00 HORIZON CONTRACTORS, INC. 8475 W 32 AVE.111 MIAML FLORIDA 33018 534 BID BOND YES UNIT PRICE S 10,000.00 $7,000.00 $68.00/LF $2,300.00 / FA. $64.00 / LF $18.001 LF $18.00 / LF $8,000.00 S35.00 / SY $250 / SF S550.00 / EA S600.00 TOTAL S150,793.00 _ S10,000.00 $7,000.00 $10,540.00 $16,100.00 $11,840.00 S8,100.00 $828.00 $S,000.00 S20,650.00 $28,825.00 $1,100.00 $850.00 S750.00 S750.00 S650.00 1T HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE LOWEST RESPONSIBLE AND RESPONSIVE BID AMOUNTIS OF . PAVEMENT CORRFORATION FOR THE S600.00 If the above contractor is not the lowest bidder explain: Development & Communication Group of Florida failed to comply with the Casty of Miami M/WBE Office 20% goal bidding requirement The firm is neither a certified Qty of Miami M/WBE orm, nor did they date in good faith to reach out to certified Qty of Minna M/WBE firms to sub- contract a minim= of 20' of the paving and/or drainage work. of Miami M/WBE firm T J. Pavetnent Corporation, the second lowest bidder, is a Qty SHEET 1 OF 4 FORMAL. BID A - B - c- D- E F - G-- H - I - 7-- K BRYAN PARK RIGHT-OF-WAY IMPROVEMENTS Project Number. B-30303 Project Manager: FERNANDO PAIVA Person who received the bids: PAJVA / BRYAN Construction Estimate = $ 153,020.00 BIDDER ADDRESS • BID BOND AMOUNT IRREGULARITIES MINORITY OWNED DEVELOPMENT & COMM. GROUP OF FLORIDA, INC: 9700 SW 104 ST. MIAMI FLORIDA 33176 S10,000.00 BID BOND) F YES CIP Number 311714 and 341206 Date: 4 / 13 / 2004 Received at: CITY CLERICS OFFICE. MIAMI crrY HALL Time: 10:00 a.m. T. J. PAVEMENT CORPORATION 1I401 SW 40 STD S1E. 335 MIAMI, FLORIDA 33165 5'4 BID BOND YES PETRO HYDRO, INC. . 10450NW 31 TER. MIA}III. FLORIDA 33172 5% BID BOND YES HORIZON CONTRACTORS, INC. 3475 W 32 AVE, 101 ML4MI, FLORIDA 33018 5% BID BOND C YES ITEM No. 13 14 15 16 17 A B D G DESCRIPTION 340 LF OF 4' WHITE PAINT STRIPE 40 LF OF 4' BLUE PAINT STRIPE 35SY OF 4" THICK QONc EIEPAVEMENT REMOVE 55 SY OF 4'THICK CONCRETE PAVEENf PROVISIONS FOR SPECIAL ITEMS ADDITIVE rrEM5 MOBILIZATION AND MAINTENANCE OF TRAFFIC MILL 2,300 SY OF 1' THICK ASPHALTIC CONCRETE PAVEMENT, INCL. REMOVAL OF ExI5IINGPAVEME"NT 2,300 SY OF 1' NOMINAL ROADWAY RESURFACING 500 LE OF 6' YELLOW SOLID TRAFFIC STRIPING CLEAN, REMOVAL AND DISPOSAL OF DEBRIS FROM EXISTING STORM SEWERS 100 LF OF OVERclJTFORTS' CMP PIPE 1 TON OF CITY OF MIAMI TYPE 'A' CONCRETE PLANT MD/FORTf TEMPORARY PATCHING IRREGULARITDIS LEGEND No Poser - of- Attorney No Affidavit as to Capital & Surplus of Corrodes F.:tumaas Proposal Unsigned or Improperly Signedor Incompelete Non - rapausr'bfu bid Improper Bid Bond No Certificate of Competency Number No First Source Hiring Compliance StMcm it No biagrity Compliance - No Deplicstc Bid Proposal UNIT PRICE $132/LF $1.00/LF $30.00 / SY $9.00/SY $8,000.00 S8.00 / SY $6.50 / SY $18.00 / LF $1,800.00 $2.00/LF $80.00 / TON Bonding Company no Corporate Seal s,. 41/2i/ae TOTAL $448.80 $40.00 $1,050.00 $49.50 $22,500.00 S8,000.00 $18,400.00 $14,950.00 S900.00 $1,800.00 $2,000.00 $80.00 UNrr PRICE $1.00/LF $1.00 / LF $36.90 / SY $27.00 / SY $5,000.00 $4.50 / SY $11.70/SY $1.10/LF $5,000.00 S120.00/LF S200.00 / TON TOTAL $340.00 $40.00 $1,291.50 $148.50 $22,500.00 $5,000.00 S 10,350.00 $26,910.00 S550.00 $5,000.00 $12,000.00 $200.00 UNIT PRICE $0.52 / LF S0.50 / LF $27.00 / SY $50.00 / SY $5,000.00 S3.50 / SY $5.50 / SY $0.75 / LF $1,000.00 $30.00 / LF $500.00 / TON TOTAL $170.00 $20.00 $945.00 S275.00 $22,500.00 $5,000.00 $8,050.00 $12,650_00 $375.00 $1,000.00 $3,000.00 $500.00 UNIT PRICE $1.50 / LF $1.50 / LF $90.00 / SY $180.00/SY $5,000.00 S3.50/SY $7.00/SY S1.50/LF $3,500.00 $64.00/LF $275.00 / TON TOTAL S510.00 $60.00 $3,150.00 $990.00 $22,500.00 S5,000.00 S8,050.00 $16,100.00 $750.00 S3,500.00 $6,400.00 S275.00 IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM 'LI-PAVEMENT CORPORATION FOR THE TOTAL AMOUNT OF $125,676.00 If the above contractor is not the lowest bidder explain: Development & Comnrimkatiasn Group of Florida faded to cowpfy with the City of Miaasi M/WBE Office 20% goal bidding reqtdresnent. The firm b nester a certified City of Mind M/WBE firs, nor did they demonstrate in good faith to reach out to certified City of Miami M/WBE firms to sub- contract a -. mum of 20% of the paving and/or drainage work. T.J. Pavement Corporation, the second lowest bidder, is a certified City of ]Miami M/WBE firm. FORMAL BID BRYAN PARK RIGHT--OF-WAY IMPROVEMENTS Project Number. B-30303 Project Manager: FERNANDO PAIVA Person who received the bids: PAIVA / BRYAN Construction Estimate = . $ 153,020.00 BIDDER ADDRESS APAC - SOUTHEAST, INC. 7600NW 69AVE MIAM I, FLORIDA 33166 CIP Number. 311714 and 341206 Date: 4 / 13 / 2004 Received at: CITY CLERK'S OFFICE, MIAM1 C1TY HALL Time: 10: 00 a.m. .1pD BOND AMOUNT 5%BID BOND IRREGULARITIES MINORITY OWNED ITEM Na. DESCRIPTION ❑Nrr PRICE NO TOTAL 13 14 15 16 17 340 LF OF 4' WHITE PAINT SIRIIPE 40 LF OF 4" BLUE PAINT STRIPE 35 SY OF 4'nuac CONCRETE PAVEMENT' REMOVE 5.5 SY OF 4' THICK CONCRETE PAVEMENT PROVISIONS FOR SPECIAL MBE $1.10/LF $1.10/LF $33.00 / SY $126.00 / SY S374.00 $44.00 $1,155.00 $693.00 $22,500.00 • A B C D F G ADDITIVE ITEMS MOBILIZATION AND MAI IIENANCE OF TRAFFIC MILL 2,300 SY OF 1' THICK ASPHALTIC CONCRETE PAVEMENT, INCL. REMOVAL OF EXISTING PAVEMENT 2,300SY OF 1' NOMINAL ROADWAY RESURFACING 500 LF OF 6' YELLOW SOLID TRAFFIC STRIPING CLEAN, REMOVAL AND DISPOSAL OF DEBRIS FROM EXISTING STORM SEWERS 100 LF OF OVERCUTT FOR 15' CMP PIPE 1 TON OF CITY OF}mon TYPE "A" CONCRETE PLANT ME< FOR TEMPORARY PATCHING * IRREGULARITIES IEGEN D A — No Power - of- Mersey B — No Affidavit as to Capital & Swphr of Boding Company C — Corrected Extensions 13 — Proposal Unsigned or Improperly Signed E — Incomplete Eiona F — Non - ttapopiIlc bid 0' G — Improper Bid Bond H — No Certificate of Competency Number I — No Fiat Source Ilhing Compliance Statement I — No Nfmority Compliance _c...._ n:A Prnnnesl $1,000.00 $3.20 / SY $4.80 / SY $2.10/LF $2,720.00 $60.00 / LF $535.00 / TON or no Corporate Seal $1,000.00 $7,360.00 $11,040.00 $1,050.00 $2,720.00 • $6,000.00 $535.00 IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM T.J. PAVEMENT CORPORATION FOR THE TOTAL AMOUNT OF $125,676.00 If the above contractor is not the lowest bidder explain: Development & Coanmwtication Group of Florida failed to comply midi the CSty of M11mi M/WBE Office 20% goal bidding regairouent. The Berm is neither a certified City of Miami M/WBE Brea, nor did they demonstrate in good faith to reach out to certified Clity of Miami M/WBE firms to sub- contract a minimum of 20% of the paving and/or drainage work T J. Pavement Corporation, the second lowest bidder, is a certified City of Miami M/WBE firm.