Analysis for Substantial Modification
to a Major Use Special Permit for the Metropolitan Project located at
approximately
300 & 200 S.E. 3rd Street and 200 S.E. 2nd Street
CASE NO. 2004-017
Consideration of a resolution, approving with conditions, a Substantial Modification to a
Major Use Special Permit, Resolution No. 02-1249, pursuant to Articles 13, 17, and 22 of
Zoning Ordinance No. 11000, as amended, for Metropolitan Project located at approxi-
mately 300 & 200 S.E. 3rd Street and 200 S.E. 2nd Street, Miami, Florida, to relocate the
residential building on "Parcel B" approximately eight feet south of the approved location
to allow for the right-of-way dedication with the City's desired realignment of S.E. 3rd
Street.
This Permit also includes the following requests:
SUBSTANTIAL MODIFICATION TO A MAJOR USE SPECIAL PERMIT, per
Article 17, Section 1701, and Article 22 of City of Miami Zoning Ordinance
11000, as amended, to allow a change in the original permit (substantial
modification to previously approved Resolution No. 02-1249). Said change does
not affect approved non-residential floor area of approximately 240,000 square
feet, parking structures consisting of approximately 4, 284 spaces, and 1,500
residential units.
VARIANCE of Section 401 of the Zoning Code to permit setback of 0 feet from
SE 4`h Street where 5 feet is required.
ALL previous approvals granted by Resolution No. 02-1249 to remain unchanged
except as stated above.
Pursuant to Articles 13, 17, and 22 of Zoning Ordinance 11000, approval of the requested
a Substantial Modification to a Major Use Special Permit shall be considered sufficient
for the subordinate permits requested and referenced above as well as any other special
approvals required by the City which may be required to carry out the requested plans.
In determining the appropriateness of the proposed project, the Planning and
Zoning Department has referred this project to the Large Scale Development
Committee (LSDC) and the Planning & Zoning's Internal Design Review
Committee for additional input and recommendations; the following findings have
been made:
Page t of 4
• It is found that the proposed mixed-use/residential development project will benefit
the Downtown area, and more particularly the Central Business District, by creating
new housing opportunities on the north side of the Miami River within downtown.
• It is found that the subject property has convenient access to the Central Business
District, the Miami River, Biscayne Bay, Bayfront Park and the Metro Mover system
that makes it ideally suited for residential and retail as a mixed use to serve the area.
• It is found that the proposed project is located within an Archeological Conservation
area and is therefore subject to a Certificate of Appropriateness for any ground
disturbing activity within the designated area.
• It is found that the proposed project was reviewed for design appropriateness by the
Urban Development Review Board and the Planning and Zoning Department; the
staff review resulted in design modifications which were then recommended for
approval to the Planning and Zoning Director with additional conditions as listed in
the Development Order.
• On February 23, 2004, the Zoning Board approved Variance Request 2004-0765 to
allow a setback of zero (0) feet from S.E. 4th Street where five (5) feet is required.
• It is found that with respect to all additional criteria as specified in Section 1305 of
Zoning Ordinance 11000, the proposal has been reviewed and found to be adequate.
Based on these findings, the Planning and Zoning Department is recommending
approval of the requested Development Project with the following conditions:
1 Meet all applicable building codes, land development regulations, ordinances and
other laws.
2. Pay all applicable fees due prior to the issuance of a building permit.
3. Allow the Miami Police Department to conduct a security survey, at the option of
the Department, and to make recommendations concerning security measures and
systems; further submit a report to the Department of Planning and Zoning, prior
to commencement of construction, demonstrating how the Police Department rec-
ommendations, if any, have been incorporated into the Project security and con-
struction plans, or demonstrate to the Director of the Department of Planning and
Zoning why such recommendations are impractical.
4. Obtain approval from, or provide a letter from the Department of Fire -Rescue in-
dicating Applicant's coordination with members of the Fire Plan Review Section
at the Department of Fire -Rescue in the review of the scope of the Project, owner
responsibility, building development process and review procedures, as well as
specific requirements for fire projection and life safety systems, exiting, vehicular
access and water supply.
Page 2 of 4
•
5. Obtain approval from, or provide a letter of assurance from the Department of
Solid Waste that the Project has addressed all concerns of the said Department
prior to the obtainment of a shell permit,
6. Comply with the Minority Participation and Employment Plan (including a Con-
tractor/Subcontractor Participation Plan) as submitted to the City's Planning &
Zoning Department.
7. Record the following in the Public Records of Dade County, Florida, prior to the
issuance of a Temporary Certificate of Occupancy or Certificate of Occupancy, a
Declaration of Covenants and Restrictions providing that the ownership, operation
and maintenance of all common areas and facilities will be by the property owner
or a mandatory property owner association in perpetuity.
8. Prior to the issuance of a shell permit, demonstrate to the City that the condomin-
ium documents have been filed with the State of Florida; or (b) provide the City
with an executed, recordable unity of title or covenant in -lieu of unity of title
agreement for the subject property; said agreement shall be subject to the review
and approval of the City Attorney's Office.
9. Provide the Department of Public Works with plans for proposed sidewalk and
swale area improvements (including implementation of the Burle Marx Plan for
Biscayne Boulevard) for its review and approval prior to the issuance of a build-
ing permit.
10. Provide the Department of Planning and Zoning with a temporary parking plan,
including an operational plan, which addresses construction employee parking
during the construction period, said plan shall include an enforcement plan and
shall be subject to the review and approval by the Department of Planning and
Zoning prior to the issuance of any building permits and shall be enforced during
construction activity.
11. If the project is to be developed in phases, the Applicant shall submit an interim
plan, including a landscape plan, which addresses design details for the land oc-
cupying future phases of this Project in the event that the future phases are not de-
veloped, said plan shall include a proposed timetable and shall be subject to re-
view and approval by the Director of the Department of Planning and Zoning.
12. The Applicant shall follow the Archeological Management Plan, approved on
November 19, 2002 (Resolution # 2002-68) by the Historic and Environmental
Preservation Board, during the development process.
13. Within 90 days of the effective date of this Development Order, record a certified
copy of the Development Order specifying that the Development Order runs with
the land and is binding on the Applicant, its successors, and assigns, jointly or
severally.
Page 3 of 4
•
•
•
14. Given the significance of the subject properties in the heart of the downtown area,
the Applicant shall provide for decorative construction fencing while the project is
being built; design of such fencing shall be subject to review and approval by the
Director of Planning and Zoning.
15. The Applicant shall continue to work with the Planning and Zoning Department to
address design issues related to the building rooftops in order to address concerns
associated with the final building elevations and consistency of architectural ele-
ments; and with regards to trying to reduce the depicted curb cut for the proposed
service and vehicular access to the building on the north side.
Page 4 of 4