HomeMy WebLinkAboutexhibit 2- fact sheetSHEET 1 OF 1
JOB NUMBER: B-5712
CIP NUMBER: 352216
OTHER TYPE:
FEDERAL (C.D.B.G.):
8.N.P.B.
ASSESSABLE: ,
EMERGENCY:
RESOLUTION No.:
0
0
rND
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 3 / 2 / 2004
PROJECT NAME: CITYWIDE STORM SEWER REPAIR PROJECT, B-5712
LOCATION: Citywide o
PROJECT MANAGER / EXT. No.: E. EsteveZ a t 1217
ASSOCIATED DEPARTMENT: Public Works
COMMISSIONER DISTRIC ALL BID REQUEST: FORMALM INFORMAL
DESCRIPTION: This project consists of the installation of approximately 100 auger hole structures
which consists of the placement of a concrete reinforced catch basin type structure. At the sump of each structures a 24" diameter drilled
well (20 ft. deep) will be Installed, Including typical frame and grate and surface restoration.
Also, this project includes the removal of collapsed open joint pipe systems and installation of 15" and 24" french drain system and solid
cross pipes at locations citywide.
The total bid consists of the sum of Items 1 through 10 and additive Item 'A'.
SCOPE OF SERVICES:
PUBLIC WORKS
COST
ADVERTISING $ 682.00 (a) $
OUTSIDE DESIGN $ $
SURVEY/PLAT $ -- $
P.W. DESIGN & BID DOCUMENTS $ 17,013.00 (E) $
CONSTRUCTION $ --
CONSTRUCTION ADMINISTRATION $ 65,065.00 (Elio)
OTHER: TESTING $ (E)
(a) - actual cost
(E) - ESTIMATE
ESTIMATED CONST. COST
TOTAL. $ 955,420.00
$ 500,000
CONTRACTOR'S INFORMATION:
CLASS: n
TYPE OF WORK: Roadway / Drainage
YEARS OF ESTABLISHMENT: 10 Years
NAME: T.J. PAVEMENT CORPORATION
ADDRESS: 11401 SW 40 ST. ST 336
CITY, STATE, ZIP: Miami, Florida 33165
CONTACT PERSON Jose A. Alvarez, President
SUB -CONTRACTORS:
NAMES: SELF
(r NECESSARY, CONTINUE ON THE SACK)
OUTSIDE COST
$ 850,650.00 (BID)
$ --
$ Z,000.00 (E)
NON - MINORITY
MINORITY
LICENSE
TELEPHONE:
(% OP CONST. COST)
2 %
10 %
12 %
(TOTAL ENCI. FEE)
I _I
E942001
(306) 220-1220
CLASS; J - JOINT P - PRIME S - SUB
MINORITY; B - BLACK H - HISPANIC F - FEMALE
CopIES: ASSISTANT DIRECTORS, COST ANALYSIS. FILE. ASSOCIATED DEPT, CIP MANAGER
REV. ZP00