Loading...
HomeMy WebLinkAboutexhibit 2- fact sheetSHEET 1 OF 1 JOB NUMBER: B-5712 CIP NUMBER: 352216 OTHER TYPE: FEDERAL (C.D.B.G.): 8.N.P.B. ASSESSABLE: , EMERGENCY: RESOLUTION No.: 0 0 rND FACT SHEET DEPARTMENT OF PUBLIC WORKS DATE: 3 / 2 / 2004 PROJECT NAME: CITYWIDE STORM SEWER REPAIR PROJECT, B-5712 LOCATION: Citywide o PROJECT MANAGER / EXT. No.: E. EsteveZ a t 1217 ASSOCIATED DEPARTMENT: Public Works COMMISSIONER DISTRIC ALL BID REQUEST: FORMALM INFORMAL DESCRIPTION: This project consists of the installation of approximately 100 auger hole structures which consists of the placement of a concrete reinforced catch basin type structure. At the sump of each structures a 24" diameter drilled well (20 ft. deep) will be Installed, Including typical frame and grate and surface restoration. Also, this project includes the removal of collapsed open joint pipe systems and installation of 15" and 24" french drain system and solid cross pipes at locations citywide. The total bid consists of the sum of Items 1 through 10 and additive Item 'A'. SCOPE OF SERVICES: PUBLIC WORKS COST ADVERTISING $ 682.00 (a) $ OUTSIDE DESIGN $ $ SURVEY/PLAT $ -- $ P.W. DESIGN & BID DOCUMENTS $ 17,013.00 (E) $ CONSTRUCTION $ -- CONSTRUCTION ADMINISTRATION $ 65,065.00 (Elio) OTHER: TESTING $ (E) (a) - actual cost (E) - ESTIMATE ESTIMATED CONST. COST TOTAL. $ 955,420.00 $ 500,000 CONTRACTOR'S INFORMATION: CLASS: n TYPE OF WORK: Roadway / Drainage YEARS OF ESTABLISHMENT: 10 Years NAME: T.J. PAVEMENT CORPORATION ADDRESS: 11401 SW 40 ST. ST 336 CITY, STATE, ZIP: Miami, Florida 33165 CONTACT PERSON Jose A. Alvarez, President SUB -CONTRACTORS: NAMES: SELF (r NECESSARY, CONTINUE ON THE SACK) OUTSIDE COST $ 850,650.00 (BID) $ -- $ Z,000.00 (E) NON - MINORITY MINORITY LICENSE TELEPHONE: (% OP CONST. COST) 2 % 10 % 12 % (TOTAL ENCI. FEE) I _I E942001 (306) 220-1220 CLASS; J - JOINT P - PRIME S - SUB MINORITY; B - BLACK H - HISPANIC F - FEMALE CopIES: ASSISTANT DIRECTORS, COST ANALYSIS. FILE. ASSOCIATED DEPT, CIP MANAGER REV. ZP00