HomeMy WebLinkAboutexhibit 2- scope of servMARLI
ENGINEERING
City of Miami
Scope of Services for Roadway Design
NW 14 Street Improvement Project
Project Description:
The project consists of the milling and resurfacing of NW 14 St. from NW 34 Ave. to NW 22
Ave. in Miami -Dade, Florida. Also included in the project is the construction of pedestrian
ramps for ADA (American with Disability Acts) compliance, the installation of Turf Block,
and milling and resurfacing of NW 14 St. The scope of services outlines the effort required
for the production of documents for the construction of the project.
Marlin Engineering Inc. shall provide engineering services for the preparation of the
construction documents (Plans and Specifications) under its current contract with the City of
Miami for the NW 14 St. Improvement Project. The contract shall include services for design
and production of roadway plans and specifications, roadway design and survey. Below is a
detail of the scope of services, and fee estimate.
Exhibit A: Scope of Service
Exhibit B: Length of Service
Exhibit C: Fee Estimate
Exhibit A Scope of Service:
The Scope of Service for the design and production of plans and specifications for the Milling
and Resurfacing of NW 14 St. shall include the following tasks:
Task 1 Roadway Analysis / Plans:
A. Prepare Key Sheet as per City of Miami Standards
B. Prepare typical section of the proposed roadway improvement as per City of
Miami standards. Typical Section shall be milling and resurfacing of the
existing asphalt pavement with the addition of Turf Block.
C. Analysis of existing roadway pavement.
D. Prepare Roadway Plans as per City of Miami standards to include limits of
milling and resurfacing, sidewalk repair, sodding, driveways, and pedestrian
ramps (ADA).
E. Prepare signing and pavement markings plans for proposed improvements
(crosswalk for pedestrian ramps) as per City of Miami standards and the latest
Manual of Traffic Control Devices (MUTCD).
F. Prepare construction details necessary for project.
G. Calculate quantities of construction items from proposed plans and tabulate in
Summary of Quantities. Also prepare preliminary and final construction cost
estimate based on these quantities.
H. Coordinate with utility owners for facilities within project limits and certify
clearance for construction.
I r .jr x) r tA icon R :.u1nirrq Tititl ic: FYr CI Ile, riixt F'r[) Joct C)c vc lc p11-10nt I licq liw,iy I )caig n
R/Vrrrrir.:ih. AviaIt. resit Con sift ic.1icxr Mr3rbag vrru11t Firicigo Inspc:ntinn
2191 NW 97 Avenue Miami, Florida 331 72-2313 Tel. (305) 477-7575 Fax (305) 477-7590
I. Perform quality control and peer review of contract documents.
J. Submit roadway plans for review by City of Miami.
K. Prepare specifications and bid documents for the project as per City of Miami
requirements.
L. Perform post design services during project construction to include shop drawings
review, plans revisions, and responding to Requests for Information (RFI's).
Task 2 Survey:
Marlin Engineering Inc. Survey Department will perform the required Roadway Design Survey
to include:
A. Topography
B. Elevations as per City of Miami Datum
C. Right of Way/ Property as per City of Miami Atlas.
The additional survey will be performed from NW 22 Ave. to NW 27 Ave. and at NW 34 Ave
under SR. 836.
Exhibit B Length of Service:
The anticipated length of Service shall be 8 weeks starting February 9, 2004 and ending April 5,
2004
Exhibit C Fee Estimate:
For Fee estimate for the services as outlined in this scope please see attached Stan Hour
Estimate.