Loading...
HomeMy WebLinkAboutCost EstimateParks Department Eddy Blanco Re; Jose Marti Park additional expenses . Item No. 1 Jan 7, 2004 Proposal for the Improvements in the Landscape, requested by Jose Casanova tor the amount of $ 37,280.00 ( see attached quote ) Item No. 2 Installation of a new " cushioning " PVC reinforcing foam " Harlequin Allegro" flooring for the Aerobic/ Dance room, requested by Maria Perez. We don't have price for the installation, and the amount indicated has been take from an estimate prepared from Perez and Assoc. for the Manuel Artime Theatre. Material (see attached quote) Installation of 95 yards at 12.00/yard Contractor Admon.( aprox. 15 % ) $ 9,687.79 $ 2,340,00 $ 351.00 TOTAL COST $12,378.79 Victor Marzo Department of CIP 1 ' l , 13'2 j_ _ ) I ,y` s D , 00 U - 7L PE 9 uI s-7 ■ 1 SC PTION r D APE CITY UNIT MATERIALS UNITS COST LABOR UNIT COST EQUIPMENT UNIT COST No.1 SAB ' . MS 16 FEET HGT 6 EA 202.5 1,215 0 0 PIGEON PLUMBS 12 FEET HGT 3 EA 380.0 1,080 0 0 GROUND BUTTONWOOD - 3' HIGH 2' SPREAD 106 EA 45.0 4,770 0 0 SOIL 1 L.SUMP 675.0 675 0 0 MULCH 1 L.SUMP 675.0 675 0 0 LABOR 6 MEN 8 HRS EACH 48 HRS 0 15 720 0 CLEAN-UP 8 L.SUMP 0 15 120 0 TRASH 1.0 EA 0 0 300 300 0 0 0 CHANGE No.2 0 0 0 VEITCHIA MONTGOMERIANA 16' HGT DOUBLE 3 EA 462 1,385 0 0 ROYAL PALM 22' HGT 6' GW 7 EA 1,053 7,371 0 0 SENNA SURRATENSIS 5 EA 280 1,398 0 0 PHILODENDRON XANZDU 65 EA 17 1,099 0 0 SHEFFLERA TRINETTE 135 EA 9 1,229 0 0 BOUGANVILLA DWARF - 3 GALLON 56 EA 9 510 0 0 SPIDER LILLY GROUNG COVER 117 EA 15 1,755 0 0 15 CYD PLANTING SOIL 1 LS 293 293 0 0 1 FERTILIZER TREATMENT 1 LS 325 325 0 0 10 CYD EUCALYPTUS MUCH 1 LS 845 645 0 0 LABOR 8 MEN 8 HRS EACH 48 HRS 16 720 0 CLEAN-UP 8 HRS 15 120 0 TRASH 1 EA 300 300 (FNERAL CONDITIONS CONTRACTOR SUPERVISION 1.0 WKS 0 1,500 1,500 0 CONTRACTOR PROJECT MANAGER WKS 0 0 0 SITE WATER -ELECT -PHONE -TRAILER-TOILET DAYS 0 0 0 CONTRACTOR LABOR HRS 0 0 0 ARQUEOLOGER HRS 0 0 0 DIRECT COST GENERAL CONDITIONS' DAYS 0 0 0 SALE TAX ON MATERIALS MARK-UP ON MATERIALS INSURANCE AND TAX ON LABOR MARK-UP ON LABOR MARK-UP ON -EQUIPMENT DIRECT COST GENERAL CONDITIONS DAY ITEMS SUBTOTALS ADMINISTRATIVE ALLOWANCE 5 EXTENSION OF TIME 10 DAYS STATUS= PENDING 24,622 1,724 3,952 30,297 3,180 1,272 668 600 90 0 5,120 890 SUB -TOTAL 36,107 CREDIT FOR 3 ROYAL PALMS AND 7 LIVE OAKS (3,000) SUB -TOTAL 33,107 1.655 SUB -TOTAL 34,763 BOND 1,043 SUB -TOTAL 35,808 INSURANCE 1,074 SUB -TOTAL 36,880 EXTENDED BUILDERS RISK 400 TOTAL 37,280 NOTE: PLEASE PROVIDE US WITH A ALL INCLUSIVE DRAWINGS SHOWING ALL CHANGES AND LOCATIONS FOR FINAL COORDINATION BEFORE COMMENCING WORK. CHANGE ORDER QUANTITIES ARE AS REPRESENTED IN THE ABOVE BREAKDOWN