HomeMy WebLinkAboutSite Utility Study• • • THE EVERGLADES on the BAY SITE UTILITY STUDY Prepared by: CSA Southeast, Inc. 100 Miracle Mile, Ste 300 Coral Gables, FL 33134 Tel: (305) 461-5484 Fax: (305) 461-5494 January 2004 • • • INTRODUCTION The proposed site is located within the limits of the City of Miami, Florida. The proposed site is bordered on the east side by Biscayne Boulevard, on the west side by existing buildings, on the north side by N.E. 3rd Street, and on the south side by N.E. 2nd Street. The site, consisting of 2.804 acres (net) and is currently occupied by the Everglades Hotel which will be demolished. The proposed project will include two towers with a total of 870 units and a parking facility within each of the buildings with a total of 1,14E parking spaces. II. DRAINAGE SYSTEM Stow). water discharge will consist of runoff from rooftops, vertical building faces and pedestrian areas. Miami -Dade DERM requires that the proposed drainage system take into account 1/3 of the largest vertical building face. It is anticipated that a portion of the building faces exposed to the north and east will produce the largest amounts of runoff and will be accounted for in the calculations. The site land use can be summarized as follows: Vertical Total Total Net Lot Area Impervious Area Building Faces (33%) Drainage Area (Acres) (Acres) (Acres) (Acres) 2.804 2.800 1.41 4.22 The proposed drainage system will call for all runoff to be collected in yard basins capable of detaining the peak inflow from the Miami -Dade County DERM 5-year, 24- hour design storm for 90 seconds. The runoff will then flow into the proposed three drainage wells based on calculations found in Table 1. Runoff from building rooftops and vertical faces are not contaminated by oil and grease and may be piped directly to the drainage wells. The use of drainage wells is permitted by Dade County DERM in this area due to the high level of salinity found in the groundwater. Since the proposed system will not have an outfall connections, the system will be designed to retain the • • • entire runoff from the 5-year, 24 hour storm. The proposed wells will keep the site dry during the DERM 5-year, 24-hour storm, keep the flooding below the site perimeter elevation during the SFWMD 25-year / 72-hour storm, and keep the flooding below the minimum building finished floor elevation during the SFWMD 100-year — 72 hour storm. III. WATER DISTRIBUTION MASTER PLAN The Miami -Dade Water and Sewer Department (MD-WASD) provides the water service in this area. The site is being served by a 12-inch ductile iron water main located on NE 2"d Street, N.E 3rd Street and Biscayne Boulevard. Refer to the attached Water Atlas for additional information. Domestic water and fire line connections for this project will be provided from the existing 12-inch water main. The anticipated average daily water consumption for the entire project is 174,000 gpd, and is calculated a shown in Table 2. IV. SANITARY SEWER MASTER PLAN The Miami -Dade Water and Sewer Department (MS-WASD) also provides the sanitary sewer service in this area. The site is served by a 10-inch sewer main located N.E. 2nd Street, N.E. 3rd Street and Biscayne Boulevard. Refer to the attached Sewer Atlas for additional information. The existing sewer lines have sufficient invert elevation and capacity to collect the sewage flow from this project. A new sewer lateral will be constructed connecting to the existing 10-inch sewer main. This project is anticipated to generate and average daily sewage flow of 174,000 gpd, and is calculated as shown in Table 2. The wastewater produced by the site will travel via the existing sanitary sewer system to the MD-WASD regional Pump Station No. 30-0002. Pump station No. 30-0002 is a very large pump station. Thus, the pump station is deemed capable of handling the flows generated from the project. Pump Station No. 30-0002 transmits all flow directly to the MD-WASD treatment plant on Virginia Key for final treatment before discharge into the Atlantic Ocean. • • • SOLID WASTE GENERATION Solid waste generated will be placed in standardized an -site containers for refuse and recyclables per the City of Miami Code, for regular pickup by private hauling companies and/or the City of Miami Solid Waste Department. The solid waste will then be transported to Metro -Dade Disposal Facilities. Actual waste pick-up locations will be shown in the architectural plans. This project is anticipated to generate an average daily solid waste volume of 1,088 cu. Yds / month, and is calculated as shown in Table 3. Generation rates were from data provided by the Metro -Dade County Department of Solid Waste. • TABLE 9 DRAINAGE CALCULATIONS 1 Total Site Area = 2.804 Acres Breakdown of Drainage Area a) Impervious: 2.8003 Acres b) Pervious: 0.0037 Acres Total Drainage Area 4.21 Acres 2 Average Runoff Coefficient = (0.95x4.2103)+(0.25x0.0037) + 4.22 = 0.63 3 SFWMD Design Storm Information i4 Well Data • 5 Year-24 Hour 25 Year - 72 Hour 100 Year- 72 Hour 6.2 7.4 8.5 Flood Protection Perimeter Berm Finished Floor Elev. 16.46 19.65 22.57 1 Well Diameter: 2 Assumed Well Capacity: 3 Mean High Tide Elevation: 4 Specific Gravity Head Loss: 5 Proposed Number of Wells: 5 Hydraulic Grade Line Elevations at Well Structure 5 Year - 24 Hour 25 Year - 72 Hour 10O Year - 72 Hour 6.60 7.19 7.74 24 800 1.52 2 3 Inches gpm/ft of head ft ft Elevation Formula: {(Runoff) / [(Assumed Well Capacity)(2.228x10-3 cfslgpm)(Number of Wells)]} + (Mean High Tide Elev + Specific Gravity Headloss) 6 100 Year Flood Elevation In Accordance with the enclosed flood routing calculations , the maximum expected stage for the 100 - year storm will be 10.99' • • • TABLE 2 ANTICIPATED AVERAGE DAILY FLOW OF WATER AND WASTEWATER Two Buildings with 49 Stories each 870 Apartment Units @ 200 gpdiunit: 174,000 gpd ANTICIPATED AVERAGE DAILY FLOW WASTEWATER Average Flow: Peak Flow: 174,000 gpd 696,000 gpd No industrial waste is anticipated TABLE 3 SOLID WASTE GENERATION 870 Apartment Units @ 1.25cu. Yds. / unit = 1087.50 cu. Yds. / month Total mount anticipated: 1088 cu. Yds. / month • 100yr_w Discharge.TXT • PROJECT NAME REVIEWER PROJECT AREA GROUND STORAGE . . TERMINATION DISCHARGE : DISTRIBUTION TYPE RETURN FREQUENCY RAINFALL DURATION . 24-HOUR RAINFALL . REPORTING SEQUENCE STAGE STORAGE (FT) (AF) 9.40 .00 9.90 .11 10.40 .44 10.90 .99 11.40 1.75 11.90 2.74 12.40 3.94 12.90 5.33 SCS PROGRAM Everglades at the Bay 4.21 ACRES .00 INCHES 999.00 CFS SFWMD 100.00 YEARS 3-DAY 11.00 INCHES STANDARDIZED DISCHARGE (CFS) 5.35 5.35 5.35 5.35 5.35 5.35 5.35 5.35 Page 1 • 100yr_w Dischye.TXT • 1 -- R E S E R V O I R RAIN ACCUM. BASIN ACCUM. ACCUM. INSTANT AVERAGE TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE (HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT) .00 .00 .00 .0 .0 .0 .0 .0 .0 9.40 4.00 .27 .27 .3 .1 .0 .1 .3 .3 .50 8.00 .54 .54 .3 .2 .0 .2 .3 .3 .50 12.00 .80 .80 .3 .3 .0 .3 .3 .3 .50 16.00 1.07 1.07 .3 .4 .0 .4 .3 .3 .50 20.00 1.34 1.34 .3 .5 .0 .5 .3 .3 .50 24.00 1.61 1.61 .3 .6 .0 .6 .3 .3 .50 28.00 2.00 2.00 .4 .7 .0 .7 .4 .4 .73 32.00 2.39 2.39 .4 .8 .0 .8 .4 .4 .73 36.00 2.78 2.78 .4 1.0 .0 1.0 .4 .4 .73 40.00 3.17 3.17 .4 1.1 .0 1.1 .4 .4 .73 44.00 3.56 3.56 .4 1.2 .0 1.2 .4 .4 .73 48.00 3.95 3.95 .4 1.4 .0 1.4 .4 .4 .73 52.00 4.44 4.44 .7 1.6 .0 1.6 .7 .5 1.15 56.00 5.46 5.46 1.4 1.9 .0 1.9 1.4 1.1 2.46 58.00 6.29 6.29 2.1 2.2 .0 2.2 2.1 1.7 3.61 59.00 6.91 6.91 3.0 2.4 .0 2.4 3.0 2.5 5.25 59.50 7,46 7.46 4.7 2.6 .0 2.6 4.7 4.2 8.20 59.75 9.11 9.11 28.0 3.2 .5 2.7 5.3 5.0 10.09 60.00 11.16 11.16 34.9 3.9 1.1 2.8 5.3 5.3 10.70 Page 2 • 100yr_w Dische.TXT • R E S E R V O I R- RAIN ACCUM. BASIN ACCUM. ACCUM. INSTANT AVERAGE TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE (HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT) 60.50 11.97 11.97 6.8 4.2 61.00 12.39 12.39 3.5 4.3 62.00 12.95 12.95 2.1 4.5 64.00 13.63 13.63 1.4 4.8 68.00 14.42 14.42 .8 5.1 72.00 14.95 14.95 .6 5.2 SUMMARY INFORMATION 1.2 3.0 5.3 5.3 10.99 1.1 3.2 5.3 5.3 10.96 .9 3.6 5.3 5.3 10.78 .2 4.6 5.3 5.3 10.06 .0 5.1 .8 1.5 1.48 5.2 .6 .6 .98 MAXIMUM STAGE WAS 10.99 FEET AT 60.50 HOURS MAXIMUM DISCHARGE WAS 5.3 CFS AT 59.75 HOURS Page 3 Ise t 4T72 370 • F14 36? E 41,041 36"IMT_464FZt�� 276 - 43 3 395 S T. 396 FLAGLER WST_ 41 449 177 76 A 8°1xE-fF 476 29e: ORT 80LULEVAR Jf PvT. P.S. 490-E PRoJECr 5rrE 435 QPIN P 446 AZA 6 1CF.4.SUAr€ CtAES 28€0 SEWER B RLCKELL KEY