Loading...
HomeMy WebLinkAboutexhibitsAttachment 1 The West 360 feet of Tract 2 of "REVISED PLAT OF BROADMOOR PLAZA", according to the Plat thereof, as recorded in Plat Book 32, at Page 76 of the Public Records of Miami -Dade County, Florida, C:1MyDirectory\PLATINUM TRACT.doc Iitg of 4XUi STEPHANIE N. GRINDELL, P.E. Director January 9, 2004 Maysville, Inc. 711 NE 29 Street, Suite 36 Miami, FL 33137 PLATINUM TRACT (FIRST RESUBMITTAL) TENTATIVE PLAT # 1699•A Located between NE 29 Terrace and NE 30 Street westerly of NE 7 Avenue Dear Ladles and Gentlemen: 44/4‘i JOE ARRIOLA City Manager The City of Miami Plat and Street Committee, at its meeting of January 6, 2004, approved the above tentative plat subject to the following revisions being made to the tentative plat, additional information being provided and/or variances being granted. Please be advised that the' processing of your tentative plat cannot proceed until these conditions have been satisfied. 1. In the location sketch: a) Provide subdivision name, lot and block numbers, and plat book and page numbers for each shown subdivision. b) Heavy -up zoning designations. 2. Provide a distance and a bearing for the centerline of each adjacent street; also show City of Miami monument lines and provide distances and bearing for the same. 3. Show the proposed 25-foot corner radius, with curve data, at each of the Northeast and the Southeast corners of the proposed plat. Also identify the external areas to be dedicated for right-of-way and provide the square footage. The existing C.B.S. wall must be demolished. 4. In Surveyor's Note #2, define the assumed meridian. 5. Correct the zoning information. 6. An opinion of title in the City of Miami opinion of title form must be provided at the time of the final plat submittal. The opinion must cover from the beginning to a most recent date. 7. Be advised that Owner's Gap Affidavit is not acceptable and It will not be accepted when the final plat is submitted. 8. Special Exception #4 Identifies a BellSouth easement. This easement must be shown on the tentative and final plats If it Is not released. 9. Special Exception #5 references restrictions created and set forth by the deed recorded on September 22, 1913 in Deed Book 111 at Page 415. Will the instrument affect the proposed development? Provide a copy of the Instrument to the Public Works Department. DEPARTMENT OF PUBLIC WORKS C:Ny0iTldory\RESOLUTS1 NSeNVIZ � ' Florida 33130 / (305} 416-1200 / Fax:(305) 416-2153 Ing ress: .0. Box 330708 Miami, Florida 33233-0708 Maysville, Inc. PLATINUM TRACT (FIRST RESUBMITTAL) TENTATIVE PLAT #1619-A January 9, 2004 Page two 10. in reference to Special Exception /6, be advised that easement holders will have to execute the final plat. 11. The notary acknowledgment portion of the application for tentative plat approval must be completed. 12. Since the City of Miami Is the holder of the storm easement shown on the underlying plat, It will have to execute the application for tentative plat approval and the final plat. 13. Be advised that current backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good Standing from the Secretary of State is required, if applicable. 14. Construction of a relocated storm sewer system along NE 29 Terrace, with an emergency overflow to the NE 30 Street outfall system, is required. In addition to the above requirements, you should be aware of the following: 1. State and local laws require the installation of various physical Improvements in the public rights -of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases this could represent a substantial investment on your part. 2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric, telephone, water, etc. caused by this plat will be at the property owner's expense. Also, utility easements may be required on the property being platted. 3. A building permit will not be issued on the property being platted until the final plat Is recorded. Also, the Certificate of Occupancy for any building construction will be Issued only after all the required subdivision improvements have been completed. 4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the issuance of a building permit. 5. Additional items must be provided to the City of Miami Department of Public Works before the final plat is submitted to the City Commission for approval. You will be notified in writing as to what these items are after the amount of the bond has been determined for the necessary subdivision improvements. 6. Tentative plat approval is only valid for one (1) year from the date of the Plat and Street Committee meeting at which time it was approved. C:1MyDirectory\RESOLUTSIPLATINUM TRACT.doc Maysville, Inc. PLATINUM TRACT (FIRST RESUBMITTALI TENTATIVE PLAT # 1619•A January 9, 2004 Page three If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate person to contact. Sincerely, Wir \CM\ A —MY \ &‘1A Stephanie N. Grindell, P. E. Chairman, Plat and Street Committee SNG/UH/rjf Enclosure: Contact Sheet c: Narciso J. Ramirez 8341 Sunset Drive Miami, FL 33143 Plat and Street Committee Members bc: surveys Civil Engineering Central C:1MyDirectory\RESOLUTSIPLATMUM TRACT.doc