1. Special Advisory Services $100,000 $100,000
This category covers tasks that are currently undefined and may surface during the
course of the work. This shall Include consulting on legal issues, claims mitigation,
hazardous material mitigation, environmental assessment analysis, assessment of
existing conditions, coordination of financial feasibility, use / lease agreements,
baggage systems, airline equipment, concession agreements and / or planning,
lease negotiations, Federal funding, future development planning, andany other
assistance BCAD requests for tasks created implementing the Program.
2. Public Information Support
$120,000 $120,000
Support to BCAD's Public Information Program associated with the expansion
program Including, community information issues, preparation and/or attendance of
public meetings / hearings, consultation on and/or preparation of various media and
news 'releases, dissemination of information or any other service needed to provide
information to the airport community, the surrounding neighborhood community, or
the traveling public and provisions or support for opening of facilities.
3. Tenant & Miscellaneous Space Programming, Relocation & Coordination $150,000 $200,000
Services necessary for coordination of tenant relocations. This includes concession
operators', airlines' and rent -a -car companies' requirements, and other
miscellaneous goods and service facilities required for the successful operation of
the Airport. Analyze aircraft m ix and gate capability for various airline tenants t o
confirm compatibility to airport requirements and Tong term planning. Coordinate
airline computer system requirements, airline FIDS, BIDS and other system
integration to assure proper passenger service levels and revenue derivation for the
County.
4. ADA Services
$30,000 $30,000
Review of specific design areas or building elements to resolve disputes and/or
ensure the new facilities comply with ADA guidelines. This may involve accessibility
review of any elements or architecture, signage, floor covering, fixtures, finishes and
/ or systems. This may also include interface with local committee or community
groups.
Page D1 -1 of 5
EXHIBIT D —1
AEP 1 FY 2003 / 2004
OPTIONAL. SERVICES
5. Technical and Protect Management Assistance to BCAD
Current Proposed
FY 2003 FY 2004
$400,000 $400,000
Schedule, estimating, design review and as approved other technical orproject
management services to assist BCAD on AEP or non-AEP projects including, but not
Limited to, communications, security modification to the SEIR or other documents or
other tasks as assigned. Technical or project management assistance to BCAD on
AEP Projects may be provided as deemed essential by the Contract Administrator on
a case -by -case basis.
6. Sub -Consultant Design Services $220,000
To provide design related services to support the program. This is for items
including, but not limited to, architectural; civil, electrical,. mechanical, plumbing, fire
alarm, fire suppression, or signage or . other issues . that may be required by the
Program, which a re o r are n of being performed u rider o ne o r more of t he d esign
contracts.
7. Auditing and/or Support.for AEP andlor OCIP Programs •
$200,000
$160,000 $150,000
To provide auditing and/or support for the AEP and/or OCIP Programs, including
meeting with contractors, sub -contractors and/or their other levels of sub -contractors,
and other auditing matters as directed by the Contract Administrator.
8. Development of a Standardized Program Documentation Manual
$120,000 $120,000
Program Manager will assemble a standardized program documentation manual for
use on all projects consolidating existing standards, forms and requirements
common to all• projects. This may include but not be limited to General Provisions,
Construction Standards Institute (CSI) Division One specifications, applicable use of
codes by industry, permitting requirements and contracts, design standards and
references, BCAD policies and procedures (or referenced to), and any n ecessary
process flow charts.
Page D1-2of5
9. Value Engineering Services
EXHIBIT D —1
AEP III FY 2003 ! 2004
OPTIONAL. SERVICES
Current Proposed
FY2003 FY 2004
$100,000 $150,000
Program Manager shall develop and implement a value engineering program which
will include reviews and analysis at all stages of programming, design and
construction in accordance with the essential characteristics of value engineering as
outlined in FAA Advisory Circulars No. 150/5300 - 15 to determine that the selection
of materials, systems and equipment for each Project Is made on the basis of the
best value to the Project and that the basis of each selection Is properly documented.
44.10. Design Cost Estimating
$200,000 $200,000
At B CAD's o ption, P rogram M anager s hall p rovide a n e stimate d uring the D esign
Development Phase and the Construction Documents phase for each : Project.
Construction Document Estimate will be accompanied by a report to BCAD,
Financial Manager and the appropriate design consultant, identifying variances with
the original budget for the Project and .making recommendations for appropriate
corrective action, if required.
4-2. 11. Financial Management $772,350 $1,170,000
Provide the services of the Financial Manager as described in Exhibit B1 and below.
This function will be provided as a three -tiered approach inciudina but not limited to
the following functions:
Tier 1: Strategic multi -year financial planning
- Forecasting Federal, State and Local program funding requirements
Page D1 - 3 of 5
EXHIBIT D —1
AEP ill FY 2003 / 2004
OPTIONAL. SERVICES
Current Proposed
FY 2003 FY 2004
- Assisting BCAD with funding source identification
Assisting BCAD with funding acquisition: through various financial
institutions
Financial analysis and control
Developing funding distribution plan for the various projects
Reconcile BCAD and AEP funding Plans
Tier 2: Funds Management
- Distribution of funds within and among the program projects
- Cost management and analysis
- Staff cost analysis and control
Analysis and tracking of Sources and Uses of Funds
Recommending the appropriate draw on fund sources
Preparation of the monthlyprogiam fLnaricial_progress report
Monitoring. tracking and analyzing projects) anc program costs
Reconcile BCAD and AEP funding sources and uses
Tier 3: Cost Control
Invoice processing and control
- yerificatlon and analysis of contractor invoices
Tracking contractor and AE accountspayable
Tracking URS invoice accounts receivable •
Input of contractor. AE and URS invoice information into the LGFS
Cost data input to the protect management system
Reconcile AEP data with information In LGFS
Initiate Purchase Requisitions within the LGFS system for approval by
BCAD
The Financial Group will perform other financial tasks
1-.1 12. Support Services for Airport Hotel
Provide support to County to prepare RLI and evaluate responses.
13. Peer Reviews
Provide an independent multi -disciplined review of the design at various
Page D1-4of5
$50,000
$50,000
$265,600
4
EXHIBIT D —1
AEP Ill FY 200312004
OPTIONAL SERVICES
stages to determine the level of compliance with the design obiectives;
recommend system alternatives: and intra-discipline consistency in
the drawings.
Current Proposed
FY 2003 FYY 2004
$75,000
14. Formal Design Review $210,000
A facilitated Design Review performed by an independent multi -disciplined team
comprised of technical specialties similar to those required by the project. These
reviews will be conducted at design stages consistent with the AE interim design
deliverable stages in their contract and focus on the following:
• Cost Effectiveness • Technical Reauirements
• Quality • Ongoing airport operations
• Security. • Claims mitigation
• Accuracy • Interface coordination
• Completeness of design documents relation
to codes, regulations and established
standards.
15. Environmental Impact Study $300,000
This category allows the Program Manager to provide management services
necessary to oversee the Environmental Impact Study process for expansion
program protects.