Department of Capital Improvements
PROJECT FACT SHEET
Project Name: ROAD REHABILITATION PROJECT
Date: January 6, 2004
Emergency:
Project Location: Citywide Commissioner District: 4
,
Project Number: 13-46f,t4 Initiating Dept.: Public Works
Project Manager/Ext. No.: Tatiana Acosta, #1283 Project Budget:
Homeland Defense
Federal (C.D.B.G.)
S.N.P.B.
Other: C.I.P.
PROJECT SCOPE
Account Number: 313855
Account Number:
Account Number:
Account Number:
The proposed work involves the areas detailed in the attachment No.1:
Amount:
Amount:
Amount:
Amount:
The Project consists of the road re -construction and resurfacing, including drainage improvements.
The drainage includes new systems with exfiltration drain and structures, as indicated in
Specifications and Contract Documents.
Arm: H. J. Roas Associates, Inc.
201 Alhambra Circle, Suite 900
Miami Florida 33134
01144'Person Alfredo Reyna, PE
'..,305-5877188111P4. 225
Type.at 141fori:' HistvItIrpprovements
PROJECT COSTS
Imate
..:Flon..F.fitesf $166 005 (A):
:i.AcidtPcmakPesign.,§00100$: N/A f (A)
00iit. N/A .`,.,(A):
,...Ftilif.0#11101604,:,600.4.40: N/A
$231890
Iqn Phase Total: $1898$5
a.
0
F
0
Contractor Williams Paving Compapy, Inc.
Address: 11300 NW South River Drive
City, State, Zip: Medley, Florida 33178
Contact Person: ..,Joseand 13,t1 J. Rodriguez
Telephone/E-mail: (305}882-1950
Class:
(J Jokt P Prkna S as Sub)
Minority Status:
(B = Black F = Female H = Hlspank N = Nona)
Established: 51 years
License Number: 28791
Sub -Contractors:
H & J Aschat, Barreiro Concrete; J & M Parldng Lot;
Environmental Performance Systems;
Black Creek Nursery
Miscellaneous Construction Cost includes the amount
of $ 35,000 for concept of Estimate Construction
Administration Services to be performed by the
Consultant. This fee was not considered In the
Original Design Proposal.
Construction Contract Amount
CIP Construction Administration:
* Misc. Construction Costs:
Construction Phase Total
$1•194,492 (BID)
$23,890 (E)
$35,000 (E)
51,253,382
Total Project Cost:
Copies to CIPSenlor Accountant, CIPAdministrator, File, Initiating Department