Loading...
HomeMy WebLinkAboutexhibit 4- estimate of costs• ATTACHMENT No. 2 PRELIMINARY ESTMATE OF CONSTRUCTION COSTS "NW 34t AVENUE ROAD IMPROVEMENT' PROJECT" B-4696 • ATTACHMENT No, 2 CITY OF MIAMI DEPARTMENT OF CAPITAL IMPROVEMENT PROGRAMS PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS. Project No.: B-4696 Scope: Street reconstruction & drainage improvements Project Location: N.W. 34th Avenue and N.W. 30 Avenue Consultant: URS Corporationtouthem Road Reconstruction Work Description , Jinit .:.:. - ., Qty ;II Unit Price ::Total .'4 4 Remove pavement and base S.Y. 7200 $10.50 $75,800 $74,700 New pavement S.Y. .6000 $12.45 Adjust structures EA 12_ $700.00 $3.83 $8,400 $1,995 Swale grass S.Y. 521 pavement S.Y. 3279 $12.47 • $40,889 Asphalt approach S.Y. 1405_ $12.45 $6,486 $84,000 Concrete sidewalk 4" S.Y. 1600.0 $40.00 B" S.Y. 900 $57.00 $51,300 $75,138 Valley Gamer L.F. 4200 $17.89 Concrete curb and gutter L.F. 500 $21.37 $10,685 $80,280 $131.379 $54,188 $5,625 Limerack Base, 8" S.Y. 8000 $13.38 Llmerock Base, 6" S.Y. . 1061 $12.81 12" Sul trade S.Y. 6600 $8.21 Roadway Sign (relocation) EA 15 $375.00 Mobilization L.S. 1 $50,000.00 $50,000 Survey . LS 1 $34,501.00 $34,501 Drainage System Lump Sum 1 Sub -Total $126,353 TOTAL PROJECT COST $773,518 ohs orm ewer pe L.F. 0.88 , 18" Optional Storm Sewer Pipe L.F. 951 $ 46.00 $43,748 Drainage structures EA 12 $ 1,600.00 $19,200 $49,0335 - ... $7,995 French grain, 18" L.F. 700 $ 70.05 Removal of exist. Inlets w1 pipe EA 8 $ 1,332.44 Core drill EA 4 $ 1,186.00 $4,664 •Total $126,3531