HomeMy WebLinkAbouttabulation sheetsTABULATION SHEET
UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES
BID NO. 04-03.220
EVANS ENVIRONMENTAL & OEOSCIENCES
14505 COMMERCE WAY, STE. 400
MIAMI LAKES, FL 33018
DADEINON•MINORITY
ITEM Descrlp0on UNIT PRICE j ij Q[ TOTAL COST
Former Watson Island Fuel & Fishing Supply Fuel Tanks Removal
1 Fixed and Firm Coats for Base Scone of Services""
IA Fixed and Firm Cost to perform scope of work requested in Tasks 1, 2, 3 & 4: $ 99,820.00 x 1 = $ 99,820.06
1 B Fixed and Firm Cost to perform scope of work requested in Task 5:
(Rafe: for purposes of this bid, assume 4 quarterly sampling events will be conducted over the
course of 1-year, following completion of the Source Removal Report and receipt of DERM's
comments)
" Note: Project must be Invoiced on a Time and Materials Basis — only for services
rendered and Includes any dumping {tipping} and standing time. A detailed description of
the labor rates and hours, equipment coats and subcontracted services will be required
to support the Invoker; submitted for payment. The City will not accept mark-up costs In
excess of 15% for subcontracted services, and will require a copy of all subcontractor
Invoices as backup, prior to approval of Contractor's Invoices.
2 Unit Costs for Services Above and Beyond Base Scope of Services;
2A Unit rate to dispose of edditonal petroleum impacted rinse water:
(above the 500 gallon limit in the Task 1)
28 Unit rate to dispose of additional petroleum sludge:
(above the 100 gallon limit in Task 1)
2C Unit rate to dispose of additional FFP and/or petroleum -affected groundwater.
(above the 8,000 gallon limit in the Task 2)
20 Unit rate for vacuum truck and operator to skim excavation area:
(above the 8,000 gallon/2 mobilizations limit In the Task 2)
2E Unit rate to excavate, transport and dispose of petroleum -affected soils:
(above the 1,000 ton limit in Task 2)
2F Unit rate to provide clean imerock for backfilling activilias:
(above the 1,200 ton limit In Task 2)
2G Unit rate to dispose of concrete:
(above the 2 load limit in Task 1)
2H Unit rate for installation of shallow monloring wells:
(services must be performed and documented by licensed wall drilling contractor)
21 Unit rate for proper abandonment of monitoring wells:
(services must be performed and documented by licensed well drilling contractor)
2J Unit rate for laboratory analysis of soil samples — VOAIPAH/TPH:
(above the 10 sample limit In Task 2)
2K Unit rate for laboratory analysts of groundwater samples — VOA/PAH/TPH:
(above the 15 sample limit In Task 2, and four-6 samples/quarter limit In Task 5)
3 LABOR COSTS.
3A Labor- Professional Geologist or Professional Engineer
3B Labor - Field Geologist
3C Labor - Field Technician/Scientist
30 Labor - CADD Draftsperson
Labor - Administrative Assistant
4 PROVISION FOR SPECIAL ITEMS;
"" Note: The number of units included in this portion of the bid were determined only for
projection purposes In order to fairly costs. Actual units (1fany) wAlbe
determined by the City based on decisions made in the field. No guarantee should be
assumed with respect to any work outside the base scope of services.
PREPARED BY:
TERRY BYRNES, CPPB
12/08/03
$ 3,083.00 per quarter x 4 = $ 12,332.06
Unit Price
# of Units*" Coe
$ 0.36 per gallon x 500 $ 180.60
$ 2,20 per gallon x 100 $ 220.00
$ 0.38 per gallon x 1,000 $ 380.00
$ 94.00 per hour x 4 $ 376.00
$ 45.00 per ton x 200 $ 9,000.00
$ 10.00 per ton x 200 $ 2,000.00
$ 285,00 per load x 1 $ 285.00
$ 465.00 per well x 2 $ 930.00
$ 110,00 per well x 10 $ 1,100.00
$ 175.00 per sample x 3 $ 525.00
$ 150.00 per sample x 3 $ 450.00
$ 85.00 per hour x 10 $ 850.00
$ 55.00 per hour x 20 $ 1,100.00
$ 45.00 per hour x 20 $ 900.00
$ 40.00 per hour x 8 $ 320.00
$ 30.00 per nour x 4 $ 120.00
Subtotal $ 18,718A0
Total Evaluation Coat
To Be Determined
$ 130,888,00
DEPT.DIRE OR c a y: GNEE
TABULATION SHEET
UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES
BID NO.02-03.220
Description
Former Watson Island Fuel & Fishing Supply Fuel Trunks Removal
Fixed and Firm Costs for Base Scope of Services"
Fixed and Firm Cost to perform scope of work requested in Tasks 1, 2, 3 & 4:
Fixed and Firm Cost to perform scope of work requested in Task 5;
(Note: for purposes of this bid, assume 4 quarterly sampling events will be conducted over the
course of 1-year, tollowing completion of the Source Removal Report and receipt ofDERM's
comments)
" Note: Project must be invoiced on a Time and Materials Beals — only for services
rendered and Includes any dumping (tipping) and standing time. A detailed description of
the labor rates and hours, equipment costa and subcontracted services will be required
to support the invoices submitted for payment. The City will not accept merk•up costs in
excess of 16% for subcontracted services, and will require a copy of all subcontractor
Invoices es backup, prior to approval of Contractor's invoices.
2 Unit Costs for Services Above and Bevond Base Scope of liervlceet
2A Unit rate to dispose of additional petroleum Impacted rinse water:
{above the 500 gallon limit in the Task 1)
2B Unit rate to dispose of additional petroleum sludge:
{above the 100 gallon limit in Task 1)
2C Unit rate to dispose of additional FFP andior petroleum -affected groundwater
{above the 6,000 gallon limit In the Task 2)
2D Unit rate for vacuum truck end operator to skim excavation area:
{above the 6,000 gallon/2 mobilizations limit In the Task 2)
2E Unit rate to excavate, transport and dispose of petroleum -affected soils:
{above the 1,000 ton limit in Task 2)
2F Unit rate to provide clean timerock for backbiting activities:
{above the 1,200 tan limit in Task 2)
2G Unit rate to dispose of concrete:
{above the 2 toad limit In Task 1)
2H Unit rate for Installation of shallow monitoring wells:
{services must be performed and documented by licensed well drilling contractor)
21 Unit rate for proper abandonment of monitoring walls:
(services must be performed and documented by licensed well drilling contractor)
2J Unit rate for laboratory analysts of soil samples — VOAIPAHITPH:
{above the 10 sample limit in Task 2)
2K Unit rata for laboratory analysis of groundwater samples — VOA/PAH/TPH:
{above the 15 sample limit in Task 2, and four-6 samples/quarter Ilmlt in Task 5)
3 TABOR CQSTS;
3A Labor - Professional Geologist or Professional Engineer
3B Labor - Field Geologist
3C Labor - Field Technician/Scientist
3D Labor - CARD Draftsperson
Labor - Administrative Assistant
4 PROVISION FOR SPECIAL ITEMS;
"" Note: The number of units Included in this portion of the bid were determined only for
projection purposes In order to fairly assess costa. Actual units (if any) will be
determined by the City based on decisions made In the Reid. No guarantee should be
assumed with respect to any work outside the base scope of services.
PREPARED BY
TERRY BYRNES, CPPB
12I08/03
$ 0.22 per gallon x 500
GLASGOW EQUIPMENT SERVICES, INC.
1760 HILL AVE.
WEST PALM BEACH, FL 33407
NON-LOCAL/NON-MINORITY
UNIT PRICE WM 9IY TOTAL COST
$132,207.00
x 1 = $ 132,207.00
$ 6,235.00 per quarter x 4 = $ 24,940.00
Unit Price 8 of Units." Coats
$ 110.00
3.53 per gallon x 100 $ 353.00
0.22 per gallon x 1,000 $ 220,00
158.82 per hour x 4 $ 635,28
37.54 per ton x 200 $ 7,588.00
9.79 per ton x 200 $ 1,958.00
176,47 per toed x 1 $ 176.47
541,18 per well x 2 $ 1,082.36
117,65 per well x 10 $ 1,176.50
817,65 par sample x 3 $ 1,852.95
588,00 per sample 3 $ 1,764.00
$ 75.00 per hour x 10 $ 750.00
$ 45.00 par hour x 20 $ 900.00
$ 60.00 per hour x 20 S 1,200.00
$ 45.OD per hour x 8 $ 360.00
$ 45.00 per hour x 4 $ 180.00
Subtotal
$ 20,306,66
TBD
Tote! Evaluation Cost $177,453.66
APPRt
(RECTOR OR DES
TABULATION SHEET
UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES
BID NO. 02-63.220
URS CORP.
7660 CORPORATE CENTER DR,, STE. 401
MIAMI, FL 33126
DADEINON-MINORITY
ITEM Description UNIT PRICE UIM QIY TOTAL COST
Former Watson Island Fuel & Fishing Supply Fuel Tanks Removal
t Fixed and Firm Costs for Base Scope of Services"
1A Fixed and Firm Cost to perform scope of work requested in Tasks 1, 2, 3 8 4:
18 Fixed and Firm Cost to perform scope of work requested in Task 5:
(Note: for purposes of this bid, assume 4 quarterly sampling events will be conducted over the
course of 1-year, following completion of the Source Removal Report and receipt of DERRM's
comments)
" Note: Project must be Invoiced on a Time and Materials Basis — only for services
rendered and Includes any dumping (tipping) and standing time. A detailed description of
the labor rates and hours, equipment costs and subcontracted aervlcea will be required
to support the Invoices submitted for payment. The City will not accept markup costa In
excess of 15%for subcontracted services, and will require a copy of all subcontractor
Invoices as backup, prior to approval of Contractor's Invoices.
2 Unit Coats for Services Above and Beyond Base Scope of Services:,
2A Unit rate to dispose of additional petroleum Impacted rinse water.
(above the 500 gallon limit In the Task 1)
28 Unit rate to dispose of additional petroleum sludge:
(above the 100 gallon limit in Task 1)
2C Unit rate to dispose of additional FFP and/or petroleum -affected groundwater.
(above the 8,000 gallon limit in the Task 2}
2D Unit rate for vacuum truck and operator to skim excavation area:
(above the 6,000 gallon/2 mobilizations (mit In the Task 2}
2E Unit rate to excavate, transport and dispose of petroleum -affected soils:
(above the 1,000 ton limit in Task 2}
2F Unit rate to provide clean limarock for backffiing activities:
(above the 1,200 ton limit in Task 2}
2G Unit rate to dispose of concrete:
(above the 2 load limit In Task 1)
2H Unit rate for Installation of shallow monitoring wells:
(services must be performed and documented by licensed well drilling contractor)
21 Unit rate for proper abandonment of monitoring wells:
(services must be performed and documented by licensed wall drilling contractor)
2J Unit rate for laboratory analysis of soil samples — VOAIPAH/TPH:
(above the 10 sample limit in Task 2)
2K Unit rate for laboratory analysis of groundwater samples — VOAIPAHTTPH:
(above the 15 sample limit In Task 2, and four-6 samples/quarter limit in Task 5)
3 LABOR COSTS:
3A Labor - Professional Geologist or Professional Engineer
3B Labor - Field Geologist
3C Labor - Field TechniclantSdentist
3D Labor - CADD Draftsperson
Labor - Administrative Assistant
4 PROVISION FOR SPECIAL ITEMS'
""" Note: The number of units included in this portion of the bid were determined only for
projection purposes in order to fairly assess costa. Actual units Of any) will be
determined by the City based on decisions made in the field. No guarantee should be
assumed with respect to any work outside the base scope of services.
PREPARED BY:
TERRY BYRNES, CPPB
12/08/03
$ 117,8135.00 x 1 = $ 117,885.00
5,545.00 per quarter x 4 = $ 22,180,00
Unit Price # of Units"' s
0,40 per gallon x 500 $ 200.00
3.78 per gallon x 100 $ 378,00
0,40 per gallon x 1,000 $ 400.00
84,00 per hour x 4 $ 336.00
41.21 per ton x 200 $ 8,242.00
10,50 per ton x 200 $ 2,100.60
262.50 per load x 1 $ 282,50
530.25 per well x 2 $ 1,060.50
82.00 per well x 10 $ 820.00
185.90 per sample x 3 $ 497,70
$ 142.80 per sample x 3 $ 428,40
$ 125.00 per hour x 10 $ 1,250.00
$ 74.00 per hour x 20 $ 1,480.00
$ 65.00 per hour x 20 $ 1,100,00
$ 55.00 per hour x 8 $ 440,00
$ 43.00 per hour x 4 $ 172,00
Subtotal $ 19,167.10
TBD
Total Evaluation Cost $ 166,232.10
PT.OIRECTOR OR DES1O
Y:
TABULATION SHEET
UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES
BID NO.02.03-220
pescribtIon
Former Watson Island Fuel & Fishing Supply Fuel Tanks Removal
Fixed and Firm Costs for Base Scoop of Services"
Fixed end Firm Cost to perform scope of work requested in Tasks 1, 2, 3 & 4:
Fixed and Firm Cost to perform scope of work requested in Task 5:
(Note: for purposes of this bid, assume 4 quarterly sampling events will be conducted over The
course of 1-year, following completion of the Source Removal Report and recelpf of DERM's
comments)
"" Note: Protect must be Invoiced on a Time and Materials Beals— only for services
rendered and Includes any dumping tipping) and standing time. A detailed description of
the labor rates and hours, equipment coats and subcontracted services will be required
to support the Invoices submitted for payment, The City will not accept markup costa in
excess of 15% for subcontracted services, and will require a copy of all subcontractor
invoices ea backup, prior to approval of Contractor, Invoices.
2 Unit Costa for Services Above and Beyond Base Scope of Services;
2A Unit rate to dispose of additional petroleum impacted nnse water:
(above the 500 gallon limit in the Task 1)
26 Unit rate to dispose of additional petroleum sludge:
(above the 100 gallon limit in Task 1)
2C Unit rate to dispose of additional FFP and/or petroleum -affected groundwater:
(above the 6,000 gallon limit In the Task 2)
20 Unit rate for vacuum truck and operator to skim excavation area:
(above the 6,000 gallon/2 mobilizations limit in the Task 2)
2E Unit rate to excavate, transport and dispose of petroleum -affected soils:
(above the 1,000 ton limit In Task 2)
2F Unit rate to provide clean limerock for backlilling activities:
(above the 1,200 ton limit in Task 2)
2G Unit rate to dispose of concrete:
(above the 2 load limit in Task 1)
2H Unit rate for installation of shallow monitoring wells:
(services must be performed and documented by licensed well drilling contractor)
21 Unit rate for proper abandonment of monitoring wells:
(services must be performed end documented by licensed well drilling contractor)
2J Unit rate for laboratory analysis of so) samples — VOA/PAHITPH:
(above the 10 sample limit in Task 2)
2K Unit rate for laboratory analysis of groundwater samples — VOAIPAH/TPH
(above the 15 sample limit in Task 2, and four-6 samples/quarter limit In Task 5)
3 LABOR COSTS;
3A Labor - Professional Geologist or Professional Engineer
3B Labor - Field Geologist
3C Labor - Field Technician/Scientist
3D Labor - CADD Draftsperson
Labor - Administrative Assistant
4 PROVISION FOR SPECIAL ITEMS;
"" Note: The number of units included in this portion of the bid were determined only for
projection purposes In order to fairly assess costs. Actual units (if any) will be
determined by the City based on decisions made in the field. No guarantee should be
assumed with respect to any work outside the base scope of services.
PREPARED BY:
TERRY BYRNES, CPPB
12/08/03
MACTEC ENGINEERING & CONSULTING
5845 NW 168 ST
MIAMI LAKES, FL 33014
DADEIHISPANIC
UNIT PRICE WM QIY TQTAl. COST
$ 111,610,00 x 1 = $ 111,618.03
4,947.00 par quarter x 4 = $ 19,788.00
Unit Price # of Units"' Costs
0.62 per gallon x 500 $ 310,00
2.20 per gallon x 100 $ 220.00
0.60 per gallon x 1,000 $ 600.00
96,00 per hour x 4 $ 384.00
44.00 per ton x 200 $ 8,800.00
9.88 per ton x 200 $ 1,976,00
$ 270.00 per load x 1 $ 270.00
$ 500.00 per well x 2 $ 1,000.00
$ 200.00 per welt x 10 $ 2,000.00
$ 270.00 per sample x 3 $ 810.00
$ 236.00 per sample x 3 $ 708.00
75.00 per hour x 10 $ 750.00
68.00 per hour x 20 $ 1,360.00
68.00 per hour x 20 $ 1,360.00
55.00 per hour x 8 $ 440.00
45.00 per hour x 4 $ 180,00
Subtotal $ 21,188.00
TBD
Total Evaluation Cost
152.574.00
EPT.e ECTOR OR DESIGN
TABULATION SHEET
UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES
BID NO. 02-03-220
ITEM RescrlptIon
Former Watson !Blend Fuel & Flatting Supply Fuel Tanks Removal
1 Fixed end Flrm Coate for Base Scopg of Servicea""
1A Fixed and Firm Cost to perform scope of work requested in Tasks 1, 2, 3 S 4:
1 B Fixed and Flrm Cost to perform scope of work requested in Task 5:
(Note' for purposes of this bid, assume 4 quarterly sampling events will be conducted over the
course of 1-year, following completion of the Source Removal Report and receipt of DERM's
comments)
Note; Protect muat be Invoiced on a Time and Materials Basle — only for services
rendered and Includes any dumping (tipping) and standing time. A detailed description of
the labor meta and hours, equipment costs and subcontracted services will be required
to support the Invoices submitted for payment. The City will not accept mark-up coats in
excess of 16% for subcontracted services, and will require a copy of all subcontractor
Invoices as backup, prior to approval of Contractor's Invoices.
2 Unit Coats for Services Above end Beyond Base Scone of Services;
2A Unit rate to dispose of additional petroleum Impacted rinse water:
(above the 500 gallon limit in the Task 1)
2B Unit rate to dispose of additional petroleum sludge;
(above the 100 gallon limit in Task 1)
2C Unit rate to dispose of additional FFP and/or petroleum -effected groundwater:
(above the 6,000 gallon limit In the Task 2)
2D Unit rate for vacuum truck and operator to skim excavation area:
(above the 6,000 gallon/2 mobilizations limit In the Task 2)
2E Unit rate to excavate, transport end dispose of petroleum -affected soils:
(above the 1,000 ton limit in Task 2)
2F Unit rate to provide clean Ilmerock for backfilling activities:
(above the 1,200 ton limit In Task 2)
2G Unit rate to dispose of concrete:
(above the 2 load limit in Task 1)
2H Unit rate for installation of shallow monitoring walls:
(services must be performed and documented by licensed well drilling contractor)
2i Unit rate for proper abandonment of monitoring wells:
(services must be performed and documented by licensed well drilling contractor)
2J Unit rate for laboratory analysis of soil samples — VOA/PAH/TPH:
(above the 10 sample limit in Task 2)
2K Unit rate for laboratory analysis of groundwater samples — VOA/PAH/TPH:
(above the 15 sample Ilmlt in Task 2, and four-6 samples/quarter limit in Task 5)
3 )-ABOR COSTS;
3A Labor - Professional Geologist or Professional Engineer
313 Labor - Field Geologist
3C Labor - Field Technician/Scientist
3D Labor - CADD Draftsperson
Labor -Administrative Assistant
4 PROVISION FOR SPECIAL ITEMS:
`". Note: The number of units included in this portion of the bid were determined only for
projection purposes In order to felrfy assess costs. Actual units (if any) will be
determined by the City based on decisions made in the field. No guarantee should be
assumed with respect to any work outside the base scope of services.
PREPARED BY:
TERRY BYRNES, CPPB
12106/03
LANGAN ENG. & ENVIRON. SERVICES
7900 MIAMI LAKES DR ,W., STE. 102
MIAMI, FL 33016
DADEINON-MINORITY
UNIT PRICE UM 9n TOTAL COST
$140,900.00 x 1 = $ 140,900.00
$ 3,697.00 per quarter x 4 = $ 14,7138.00
Unit Price N of Units"" Costs
$ 0.36 per gallon x 500 $ 190.00
$ 3.00 per gallon x 100 $ 300.00
$ 0.38 per gallon x 1,000 $ 360.00
$ 102.50 per hour x 4 $ 410.00
$ 9,900.00
$ 2,500.00
$ 1,264.95
2 $ 750.00
10 $ 600.00
$ 175.00 per sample x 3 $ 525,00
$ 160.00 per sample x 3 $ 480,00
$ 49.513 per ton x 200
$ 12.50 per ton x 200
$ 1,264.95 per load x
$ 375.00 per well x
$ 80,00 per well x
$ 100.00 per hour x 10 $ 1,000,00
$ 70.00 per hour x 20 $ 1,400,00
ZERO per hour x 20 $
$ 50.00 per hour x 8 $ 400,00
$ 40.00 per hour x 4 $ 160,00
Subtotal
$ 20,259.96
TBD
Total Evaluation Coat $175,947,98